Cost-related issues Cost-related issues Philippe Lebrun CLIC Two-Beam Module Review 15-16 September 2009

Upload: baby

Post on 22-Jan-2016

40 views

Category:

Documents


0 download

DESCRIPTION

Cost-related issues. Philippe Lebrun CLIC Two-Beam Module Review 15-16 September 2009. A major cost driver. Two-Beam Modules account for a large fraction of CLIC cost Amount to ~ 36 % direct capital cost - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Cost-related issues

Cost-related issuesCost-related issues

Philippe Lebrun

CLIC Two-Beam Module Review15-16 September 2009

Page 2: Cost-related issues

A major cost driverA major cost driver

• Two-Beam Modules account for a large fraction of CLIC cost– Amount to ~ 36 % direct capital cost– Impact on other capital (tunnel, infrastructure, services) and

operation (electricity, cooling, maintenance) costs

7%

16%

36%5%

36%

Main beam productionDrive beam productionTwo-beam acceleratorsInteraction regionInfrastructure and services

Direct

Indirect impact

CLIC 3 TeV cost estimate 2007 (H. Braun & G.

Riddone)

Page 3: Cost-related issues

Complexity, number, Complexity, number, integrationintegration

CLIC 3 TeVModules: 10462

Accelerating str.: 71406 PETS: 35703MB quadrupoles: 1996 DB quadrupoles: 20924

CLIC 3 TeVModules: 10462

Accelerating str.: 71406 PETS: 35703MB quadrupoles: 1996 DB quadrupoles: 20924

CLIC 500 GeVModules: 2124

Accelerating str.: 13156 PETS: 6578MB quadrupoles: 929 DB quadrupoles: 4248

CLIC 500 GeVModules: 2124

Accelerating str.: 13156 PETS: 6578MB quadrupoles: 929 DB quadrupoles: 4248

Page 4: Cost-related issues

Update of TBM cost estimateUpdate of TBM cost estimate

• Analytical cost estimate being reviewed/updated, to be presented at C&S WG of 26 October 2009

• Main difficulties– Configuration not entirely settled– Non-standard, non off-the-shelf components– Open issues in manufacturing techniques– Learning curves for very large-series accelerator components (>

1 order of magnitude above LHC)

Page 5: Cost-related issues

CLIC vs LHC componentsCLIC vs LHC components

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

1.E+07

1 10 100 1000

Number of variants

Max

imum

num

ber

of u

nits

per

var

iant Superconductors

Magnet components

Magnets

Power converters

Cryolines

Vacuum

Flexible cells, manual work

Flexible workshops

Automatic chains

CLIC ASCLIC PETS

CLIC QuadsCLIC TBM

Page 6: Cost-related issues

Cost of large-series componentsCost of large-series componentsstrongly affected by learning strongly affected by learning

curvecurve

CLIC Two-Beam Modules ?

Page 7: Cost-related issues

Open issues on TBM direct Open issues on TBM direct costscosts

• Accelerating structures– Material, precision, manufacturability, production yield– Very large number– Quadrant versus stacked discs (H)– Vacuum tank vs. sealed (M)

• PETS– Very large number– On-off mechanism (M)

• Quadrupoles– Very large number– Power dissipation (capital vs operation)

Cost impact– H : high, order (BCHF)– M : medium, order (100 MCHF)– L : low, order (10 MCHF)

Page 8: Cost-related issues

Open issues on TBM direct Open issues on TBM direct costscosts

• Active alignment system– Very large number– Common girder would reduce number (M)

• Stabilization sytem– Very large number– No large-scale industrial experience (M)

• Instrumentation– Very large number– Novel instruments– Standardize electronics (M)

Cost impact– H : high, order (BCHF)– M : medium, order (100 MCHF)– L : low, order (10 MCHF)

Page 9: Cost-related issues

Open issues on TBM indirect Open issues on TBM indirect costscosts

Cost impact– H : high, order (BCHF)– M : medium, order (100 MCHF)– L : low, order (10 MCHF)

• Power dissipation in air– Ventilation scheme (M)– Tunnel transverse cross-section (M)– Sector length

• Overall power consumption– Capital & operating costs