27
SUMMARY OF ALL PROJECT COST: SL No Description Quanti ty Unit Price Total Note 1. Bricks 103775 0 Piece 7.0 7264250 2. Brick chips 207230 cft 84 17407320 3. M/s Rod 644665 kg 53 34167245 4. Cement 51870 bag 435 22563450 5. Fine Sand 242950 cft 18 4373100 6. Filling Sand 67960 cft 13 883480 7. Filling Soil 436526 cft 4.5 1964367 8. Suttaring Wood 7095.5 cft 430 3051065 9. Nails for Suttaring 7767 kg 70 543690 10 . Wire for rod binding 5656 kg 106 599536 11 Painting (Only Paint) 204500 sft 5 1022500 12 . Rupban Sheet 1621 kg 75 121575 13 Thai Glass for Window 512 Sft 420 215040 14 M/S Sheet 15000 kg 98 1470000 15 Polithin 1370 Kg 110 150700 16 Bamboo 10000 Piece 75 750000 17 Roofing 3066 Sft 175/1 30 471030 18 Tiles 10350 sft 80 828000 19 Still Door 1512 Sft 300 453600 20 Wooden Door 15 Piece 12500 187500 21 PVC Door 11 Piece 3500 38500 Page 1

Upload: omar-faruk

Post on 16-Aug-2015

44 views

Category:

Engineering


5 download

TRANSCRIPT

Page 1: Cost of ps farm

SUMMARY OF ALL PROJECT COST:

SL No

Description Quantity Unit Price Total Note

1. Bricks 1037750 Piece 7.0 72642502. Brick chips 207230 cft 84 174073203. M/s Rod 644665 kg 53 341672454. Cement 51870 bag 435 225634505. Fine Sand 242950 cft 18 43731006. Filling Sand 67960 cft 13 8834807. Filling Soil 436526 cft 4.5 19643678. Suttaring Wood 7095.5 cft 430 30510659. Nails for Suttaring 7767 kg 70 54369010. Wire for rod binding 5656 kg 106 59953611 Painting (Only Paint) 204500 sft 5 102250012. Rupban Sheet 1621 kg 75 12157513 Thai Glass for Window 512 Sft 420 21504014 M/S Sheet 15000 kg 98 147000015 Polithin 1370 Kg 110 15070016 Bamboo 10000 Piece 75 75000017 Roofing 3066 Sft 175/130 47103018 Tiles 10350 sft 80 82800019 Still Door 1512 Sft 300 45360020 Wooden Door 15 Piece 12500 18750021 PVC Door 11 Piece 3500 38500

Total= 98525948 Tk

SincerelyDate:

(Omor Faruk) Mother Trade International.

Page 1

Page 2: Cost of ps farm

SL No

Description Quantity Unit Price Total Note

22 Still Door Double 8 Piece 10000 8000023 Thai Grill 512 Sft 150 7680024 Net Grill 1152 Sft 150 17280025 Vibrate wire 700 Kg 90 6300026 Engle Bar 350 Pice 300 10500027 Window Green 1456 Sft 420 61152028 Electric wiring (Materials) 45000029 Water System (Materials) 62000030 Management 00000031 Pump, Tank & Boring 42000032 F/ Selling 10000033 All Project Soil Filling 850000 cft 4.5 382500034 Soil Labeling & Dressing 300000 Sft 2 60000035 All Contactor Charge (Civil, Tiles, Water & Electric) 29478900

Total = 36603020 TK.

Grand Total : 135128968 Tk Only.

SincerelyDate:

(Omor Faruk) Mother Trade International.

Page 2

Page 3: Cost of ps farm

ALL CONTRACTOR CHARGE:

1. Civil Work = 17 Item Total = 28056150 Note

2. Tiles Work = 10350 × 20 = 207000

3. Water System = 250000 × 1 = 250000

4. Electric Wiring = 250000 × 1 = 250000

5. Painting = 204500 × 1 × 3.5 = 715750

Total= 29478900 TK.

TOTAL CONTRACTOR CHARGE:= 294,78900.00tk

SincerelyDate:

(Omor Faruk) Mother Trade International.

Page 3

Page 4: Cost of ps farm

COUNTRUCTOR CHARGE OF CIVIL WORK:

1. MAIN HOUSE (Foundation) = 21500 Sft × 4 × 50 = 4300000 Note2. MAIN ,, (1ST, 2ND & 3rd Floor) = 21500 × 12 × 75 = 193500003. GATE SPRAY = 485 × 1 × 85 = 412254. RCC ROAD = 20000 × 1 × 30 = 6000005. RICE HUSK = 700 × 1 × 85 = 595006. CAR SPRAY = 915 × 1 × 85 = 777757. FEED GO DOWN = 1000 × 1 × 85 = 850008. TOWER TANK = 1 L/S 1500009. STAFF & WORKER = 10125 × 2 × 85 = 172125010. BOUNDARY WALL = 3050 × 1 × 230 = 70150011. WATER RESIRVOIR = 1 L/S 15000012. OFFICE BUILDING = 3200 × 1 × 85 = 22700013. THAI RESIDENCE = 2100 × 1 × 85 = 17850014. ELECRIC-SUB-STATION = 1650 × 1 × 85 = 14025015. WORK-SHOP = 775 × 1 × 85 = 6575016. MANURE GO DOWN = 260 × 4 × 85 = 8840017. TOILET TANK = 800 × 1 × 150 = 120000

TOTAL = 28056150 Tk

SincerelyDate:

(Omor Faruk)Mother Trade International.

Page 4

Page 5: Cost of ps farm

BRICKS

1. MAIN HOUSE = 162500 4 = 650000 Note2. GATE SPRAY = 5750 1 = 57503. ROAD = 6500 1 = 65004. RICE HUSK = 5500 1 = 55005. CAR SPRAY = 8550 1 = 85506. FEED GO DOWN = 4500 1 = 45007. TOWER TANK = 1500 1 = 15008. STAFF & WORKER = 75500 2 = 1510009. BOUNDARY WALL = 105850 1 = 10585010. WATER RESIRVOIR = 10550 1 = 1055011. OFFICE ROOM = 26550 1 = 2655012. THAI RESIDENCE = 13500 1 = 1350013.ELECRIC-SUB-STATION

= 8500 1 = 8500

14. WORK-SHOP = 6000 1 = 600015. MANURE GO DOWN = 6500 4 = 2600016. TOILET TANK = 7500 1 = 7500

GRAND TOTAL = 1037750 Pice

SincerelyDate:

(Omor Faruk) Mother Trade International.

Page 5

Page 6: Cost of ps farm

BRICKS CHIPS

1. MAIN HOUSE = 42250 4 = 169000 Note2. GATE SPRAY = 215 1 = 2153. RCC ROAD = 9150 1 = 91504. RICE HUSK = 450 1 = 4505. CAR SPRAY = 735 1 = 7356. FEED GO DOWN = 1220 1 = 12207. TOWER TANK = 830 1 = 8308. STAFF & WORKER = 6100 2 = 122009. BOUNDARY WALL = 4070 1 = 407010. WATER RESIRVOIR = 2110 1 = 211011. OFFICE ROOM = 2050 1 = 205012. THAI RESIDENCE = 980 1 = 980

13.ELECRIC-SUB-STATION = 1720 1 = 172014. WORK-SHOP = 410 1 = 41015. MANURE GO DOWN = 410 4 = 164016. TOILET TANK = 450 1 = 450

TOTAL = 207230 Cft

SincerelyDate:

(Omor Faruk) Mother Trade International.

Page 6

Page 7: Cost of ps farm

M/S ROD

1. MAIN HOUSE = 138200 4 = 552800 Note2. GATE SPRAY = 650 1 = 6503. ROAD = 12385 1 = 123854. RICE HUSK = 1050 1 = 10505. CAR SPRAY = 1650 1 = 16506. FEED GO DOWN = 2100 1 = 21007. TOWER TANK = 2250 1 = 22508. STAFF & WORKER = 18150 2 = 363009. BOUNDARY WALL = 9910 1 = 991010. WATER RESIRVOIR = 3850 1 = 385011. OFFICE ROOM = 6820 1 = 682012. THAI RESIDENCE = 2550 1 = 255013. ELECRIC-SUB-STATION = 4150 1 = 415014. WORK-SHOP = 1400 1 = 140015. MANURE GO DOWN = 1400 4 = 5600 16. TOILET TANK = 1200 1 = 1200

TOTAL = 644665 KG

SincerelyDate:

(Omor Faruk) Mother Trade International.

Page 7

Page 8: Cost of ps farm

CEMENT FOR ALL WORK

1. MAIN HOUSE = 10350 4 = 41400 Note2. GATE SPRAY = 100 1 = 1003. ROAD = 1850 1 = 18504. RICE HUSK = 155 1 = 1555. CAR SPRAY = 205 1 = 2056. FEED GO DOWN = 325 1 = 3257. TOWER TANK = 165 1 = 1658. STAFF & WORKER = 1900 2 = 38009. BOUNDARY WALL = 1190 1 = 119010. WATER RESIRVOIR = 350 1 = 35011. OFFICE ROOM = 750 1 = 75012. THAI RESIDENCE = 290 1 = 29013.ELECRIC-SUB-STATION = 420 1 = 42014. WORK-SHOP = 160 1 = 16015. MANURE GO DOWN = 140 4 = 56016. TOILET TANK = 150 1 = 150

TOTAL = 51870 Bag

SincerelyDate:

(Omor Faruk)Mother Trade International.

FINE SAND

Page 8

Page 9: Cost of ps farm

1. MAIN HOUSE = 45000 4 = 180000 Note2. GATE SPRAY = 450 1 = 4503. RCC ROAD = 10500 1 = 105004. RICE HUSK = 650 1 = 6505. CAR SPRAY = 1100 1 = 11006. FEED GO DOWN = 1500 1 = 15007. TOWER TANK = 800 1 = 8008. STAFF & WORKER = 12150 2 = 243009. BOUNDARY WALL = 7290 1 = 729010. WATER RESIRVOIR = 2540 1 = 254011. OFFICE ROOM = 4520 1 = 452012. THAI RESIDENCE = 1800 1 = 180013. ELECRIC-SUB-STATION = 2500 1 = 250014. WORK-SHOP = 850 1 = 85015. MANURE GO DOWN = 850 4 = 340016. TOILET TANK = 750 1 = 750

TOTAL = 242950 Cft

SincerelyDate:

(Omor Faruk)Mother Trade International.

FILLING SAND1. MAIN HOUSE = 10750 4 = 43000 Note

Page 9

Page 10: Cost of ps farm

2. GATE SPRAY = 500 1 = 5003. RCC ROAD = 3650 1 = 36504. RICE HUSK = 350 1 = 3505. CAR SPRAY = 450 1 = 4506. FEED GO DOWN = 500 1 = 5007. TOWER TANK = 100 1 = 1008. STAFF & WORKER = 5500 2 = 110009. BOUNDARY WALL = 3050 1 = 305010. WATER RESIRVOIR = 200 1 = 20011. OFFICE ROOM = 1640 1 = 164012. THAI RESIDENCE = 820 1 = 82013. ELECRIC-SUB-STATION = 850 1 = 85014. WORK-SHOP = 1000 1 = 100015. MANURE GO DOWN = 200 4 = 80016. TOILET TANK = 50 1 = 50

TOTAL = 67960 Cft

SincerelyDate:

(Omor Faruk)Mother Trade International.

Page 10

Page 11: Cost of ps farm

FILLING SOIL

1. MAIN HOUSE = 86000 4 = 344000 Note2. GATE SPRAY = 2000 1 = 20003. RCC ROAD = 23360 1 = 233604. RICE HUSK = 2100 1 = 21005. CAR SPRAY = 2746 1 = 27466. FEED GO DOWN = 3000 1 = 30007. TOWER TANK = 250 1 = 2508. STAFF & WORKER = 30000 1 = 300009. BOUNDARY WALL = 6400 1 = 640010. WATER RESIRVOIR = 500 1 = 50011. OFFICE ROOM = 6520 1 = 652012. THAI RESIDENCE = 5150 1 = 515013. ELECRIC-SUB-STATION = 5000 1 = 500014. WORK-SHOP = 3000 1 = 300015. MANURE GO DOWN = 600 4 = 240016. TOILET TANK = 100 1 = 100

TOTAL = 436526 Cft

SincerelyDate:

(Omor Faruk)Mother Trade International.

Page 11

Page 12: Cost of ps farm

SUTTARING WOOD

1. MAIN HOUSE = 1550 5 = 62002. GATE SPRAY = 5 1 = 53. RCC ROAD = 5 1 = 54. RICE HUSK = 2.5 1 = 2.55. CAR SPRAY = 6 1 = 66. FEED GO DOWN = 20 1 = 207. TOWER TANK = 15 1 = 158. STAFF & WORKER = 350 1 = 3509. BOUNDARY WALL = 250 1 = 25010. WATER RESIRVOIR = 15 1 = 1511. OFFICE ROOM = 80 1 = 8012. THAI RESIDENCE = 50 1 = 5013. ELECRIC-SUB-STATION = 50 1 = 5014. WORK-SHOP = 5 1 = 515. MANURE GO DOWN = 10 4 = 4016. TOILET TANK = 2 1 = 2

TOTAL = 7095.5 Cft

SincerelyDate:

(Omor Faruk)Mother Trade International.

Page 12

Page 13: Cost of ps farm

NAILS FOR SUTTARING

1. MAIN HOUSE = 1800 4 = 7200 Note2. GATE SPRAY = 6 1 = 63. RCC ROAD = 30 1 = 304. RICE HUSK = 5 1 = 55. CAR SPRAY = 20 1 = 206. FEED GO DOWN = 20 1 = 207. TOWER TANK = 20 1 = 208. STAFF & WORKER = 120 1 = 1209. BOUNDARY WALL = 120 1 = 12010. WATER RESIRVOIR = 20 1 = 2011. OFFICE ROOM = 100 1 = 10012. THAI RESIDENCE = 30 1 = 3013. ELECRIC-SUB-STATION = 40 1 = 4014. WORK-SHOP = 10 1 = 1015. MANURE GO DOWN = 8 4 = 2416. TOILET TANK = 2 1 = 2

TOTAL = 7767 Kg

SincerelyDate:

(Omor Faruk)Mother Trade International.

Page 13

Page 14: Cost of ps farm

WIRE FOR ROD BINDING

1. MAIN HOUSE = 1250 4 = 5000 Note2. GATE SPRAY = 5 1 = 53. RCC ROAD = 120 1 = 1204. RICE HUSK = 5 1 = 55. CAR SPRAY = 15 1 = 156. FEED GO DOWN = 18 1 = 187. TOWER TANK = 18 1 = 188. STAFF & WORKER = 170 1 = 1709. BOUNDARY WALL = 90 1 = 9010. WATER RESIRVOIR = 35 1 = 3511. OFFICE ROOM = 60 1 = 6012. THAI RESIDENCE = 23 1 = 2313. ELECRIC-SUB-STATION = 35 1 = 3514. WORK-SHOP = 12 1 = 1215. MANURE GO DOWN = 12 4 = 4816. TOILET TANK = 2 1 = 2

TOTAL = 5656 KG

SincerelyDate:

(Omor Faruk) Mother Trade International.

PAINTING ALL PROJCET (ONLY MATRIALS)

1. MAIN HOUSE = 22500 4 = 90000 Note

Page 14

Page 15: Cost of ps farm

2. GATE SPRAY = 1650 1 = 16503. RICE HUSK = 1550 1 = 15504. CAR SPRAY = 2750 1 = 27505. FEED GO DOWN = 3500 1 = 35006. STAFF & WORKER = 34950 2 = 699007. OFFICE ROOM = 12500 1 = 125008. THAI RESIDENCE = 8500 1 = 85009. ELECRIC-SUB-STATION = 5150 1 = 515010. WORK-SHOP = 3000 1 = 300011. MANURE GO DOWN = 1500 4 = 6000

TOTAL = 204500 Sft

SincerelyDate:

(Omor Faruk)Mother Trade International.

ROPBAN SHEET

1. MAIN HOUSE = 350 4 = 1400 Note2. GATE SPRAY = 1 1 = 13. RCC ROAD = 2 1 = 24. RICE HUSK = 2 1 = 25. CAR SPRAY = 3 1 = 36. FEED GO DOWN = 5 1 = 57. TOWER TANK = 2 1 = 2

Page 15

Page 16: Cost of ps farm

8. STAFF & WORKER = 20 1 = 209. BOUNDARY WALL = 120 1 = 12010. WATER RESIRVOIR = 2 1 = 211. OFFICE ROOM = 5 1 = 512. THAI RESIDENCE = 5 1 = 513. ELECRIC-SUB-STATION = 8 1 = 814. WORK-SHOP = 2 1 = 215. MANURE GO DOWN = 3 4 = 1216. TOILET TANK = 2 1 = 2

TOTAL = 1621 Kg

SincerelyDate:

(Omor Faruk)Mother Trade International.

Page 16

Page 17: Cost of ps farm

THAI GLASS FOR WINDOW

1. GATE SPRAY = 4×4 = 16 × 2 = 32 Note2. STAFF & WORKER = 4×4 = 16 × 10 = 1603. OFFICE ROOM = 4×4 = 16 × 6 = 964. THAI RESIDENCE = 4×4 = 16 × 14 = 224

TOTAL = 512 Sft

M/S SHEET 1. MAIN HOUSE = 250 × 6 = 15000 KG

POLITHIN

1. MAIN HOUSE = 250 × 4 = 10002. RCC ROAD = 220 × 1 = 2203. RECIDENCE ALL FLOR = 150 × 1 = 150

TOTAL = 1370 KG

BAMBOO

1. MAIN HOUSE = 2000 × 4 = 8000

2. ALL RECIDENCE = 2000 × 1 = 2000TOTAL = 10000 Piece

ROOFING

1. RICE HUSK = 1610 × 175 = 2817502. CAR SPRAY = 1006 × 130 = 1307803. TOWER TANK = 450 × 130 = 58500

TOTAL = 471030 Tk

SincerelyDate:

(Omor Faruk)Mother Trade International.

Page 17

Page 18: Cost of ps farm

TILES1. GATE SPRAY = 850 × 1 = 8502. STAFF & WORKER = 3500 × 2 = 70003. OFFICE ROOM = 2750 × 1 = 27504. THAI RESIDENCE = 3250 × 1 = 3250

TOTAL = 10350 Sft

STILL DOOR

1. GATE SPRAY = 21 × 4 = 842. STAFF & WORKER = 21 × 48 = 10083. OFFICE ROOM = 21 × 4 = 844. WORK-SHOP = 35 × 2 = 705. MANURE GO DOWN = 35 × 4 = 1406. FEED GO DOWN = 42 × 2 = 84

TOTAL = 1512 Sft

WOODEN DOOR

1. STAFF & WORKER = 6 Pice = 62. OFFICE ROOM = 1 Pice = 13. THAI RESIDENCE = 8 Pice = 8

TOTAL = 15 Pice

P.V.C DOOR

1. STAFF & WORKER = 6 Pice = 62. THAI RESIDENCE = 3 Pice = 33. OFFICE ROOM = 2 Pice = 2

TOTAL = 11 Pice

SincerelyDate:

(Omor Faruk)Mother Trade International.

Page 18

Page 19: Cost of ps farm

STILL DOOR DUBBLE 1. SPRAY ROOM = 8 Pic = 8 Pic

THAI GRILL1. GATE SPRAY = 16 × 2 = 322. STAFF & WORKER = 16 × 10 = 1603. OFFICE ROOM = 16 × 4 = 644. THAI RESIDENCE = 16 × 14 = 224

TOTAL = 512 Sft

NET GRILL

1. STAFF & WORKER = 60 × 16 = 9602. KITCHEN ROOM = 48 × 4 = 192

TOTAL = 1152 Sft

VIBRET WIRE 1. BOUNDARY WALL = 700 × 1 = 700 KG

ANGLE BER BOUNDARY WALL = 350 × 1 = 350 Pice

WINDOW GRIL

1. WORK SHOP = 16 × 7 = 1122. STAFF & WORKER = 16 × 80 = 12803. OFFICE ROOM = 16 × 4 = 64

TOTAL = 1456 Sft

SincerelyDate:

(Omor Faruk) Mother Trade International.

Page 19