cost centre c installation, testing and …€¦ · (d) quirino highway (inclusive) station to...

31
General Bid Bulletin No.1 Annex “CPACKAGE CP106: E&M SYSTEMS AND TRACK WORKS BF-58 COST CENTRE C INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C1 INSTALLATION & TESTING OF TRACK WORK Sheet 1 of 3 ITEM DESCRIPTION AMOUNT FOREIGN CURRENCY PHP C1.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for Inspectionand Test Plan, Testing and Commissioning Management Plan. C1.2 Completion of installation and site testing of the Trackwork, platform edge and level clearance of the following stations: (a) PRI Area at Depot (b) Depot (c) East Valenzuela (d) Quirino Highway (e) Tandang Sora (f) North Avenue (g) Quezon Avenue (h) East Avenue (i) Anonas (j) Katipunan (k) Ortigas North (l) Ortigas South (m) Kalayaan Avenue (n) Bonifacio Global City Total of Sheet 1 of Schedule C1 carried forward to Sheet 2: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________

Upload: others

Post on 05-Mar-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-58

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C1 – INSTALLATION & TESTING OF TRACK WORK

Sheet 1 of 3

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

C1.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for Inspectionand Test Plan, Testing and Commissioning Management Plan.

C1.2 Completion of installation and site testing of the Trackwork, platform edge and level clearance of the following stations:

(a) PRI Area at Depot

(b) Depot

(c) East Valenzuela

(d) Quirino Highway

(e) Tandang Sora

(f) North Avenue

(g) Quezon Avenue

(h) East Avenue

(i) Anonas

(j) Katipunan

(k) Ortigas North

(l) Ortigas South

(m) Kalayaan Avenue

(n) Bonifacio Global City

Total of Sheet 1 of Schedule C1 carried forward to Sheet 2:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 2: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-59

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C1 – INSTALLATION & TESTING OF TRACK WORK

Sheet 2 of 3

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 1:

(o) Lawton

(p) Senate

(q) Terminal 3

C1.3 Completion of installation and site testing of the Trackwork, switches, turnout, crossovers, scissors, clearance from sidewalks and signal posts and catenary heights for the followings:

(a) Depot to East Valenzuela Station

(b) East Valenzuela Station to Quirino Highway Station

(c) Quirino Highway Station to Tandang Sora Station

(d) Tandang Sora Station to North Avenue Station

(e) North Avenue Station to Quezon Avenue Station

(f) Quezon Avenue Station to East Avenue Station

(g) East Avenue Station to Anonas Station

(h) Anonas Station to Katipunan Station

Total of Sheet 2 of Schedule C1:

Total of Sheet 1 and Sheet 2 of Schedule C1 carried forward to sheet 3:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 3: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-60

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C1 – INSTALLATION & TESTING OF TRACK WORK

Sheet 3 of 3

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 2:

(i) Katipunan Station to Ortigas North Station

(j) Ortigas North Station to Ortigas South Station

(k) Ortigas South Station to Kalayaan Avenue Station

(l) Kalayaan Avenue Station to Bonifacio Global City Station

(m) Bonifacio Global City Station to Lawton Station

(n) Lawton Station to Senate Station

(o) Senate Station to Food Terminal Inc. (FTI) Station. Demarcation point shall be at the Buffer stop toward FTI direction after Terminal 3 Turnout.

(p) Senate Station to Terminal 3 Station

C1.4 Obtain Notice of No Objection or Notice of No Objection With Comment(s) from the Engineer for Acceptance Test.

C1.5 Completion of the remaining works.

Total of Sheet 3 of Schedule C1:

Total of Sheet 1, Sheet 2 and Sheet 3 of Schedule C1 carried forward to Summary of Cost Centre C:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 4: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-61

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C2– INSTALLATION & TESTING OF SIGNALING SYSTEM

Sheet 1 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

C2.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for InspectionTest Plan (ITP), prior to Testing and Commissioning Management Plan.

C2.2 Completion of installation, site testing and integrated testing for all sub-systems for the Signaling at theDepot, all station equipment &Waysidesuch as ATO and Interlocking including racks, point machines, track circuit, cabling and terminationsfor the followings:

(a) PRI Building and Track section Area at Depot

(b) Depot

(c) East Valenzuela

(d) Quirino Highway

(e) Tandang Sora

(f) North Avenue

(g) Quezon Avenue

(h) East Avenue

(i) Anonas

(j) Katipunan

Total of Sheet 1 of Schedule C2 carried forward to Sheet 2:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 5: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-62

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C2– INSTALLATION & TESTING OF SIGNALING SYSTEM

Sheet 2 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 1:

(k) Ortigas North

(l) Ortigas South

(m) Kalayaan Avenue

(n) Bonifacio Global City

(o) Lawton

(p) Senate

(q) Terminal 3

C2.3 Completion of installation, site testing, system integration testing of all sub-systems for the Signaling system at Stations and Wayside equipment including Train Detection System, On-board, train to wayside & train to train communication devices, junction boxes, cabling and terminations for the following:

(a) PRI Building and Track section Area (inclusive) at Depot (Exclusive)

(b) Depot(inclusive)to East Valenzuela Station (Exclusive)

(c) East Valenzuela Station (inclusive) to Quirino Highway Station (exclusive)

(d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive)

Total of Sheet 2 of Schedule C2:

Total of Sheet 1 and Sheet 2 of Schedule C2 carried forward to sheet 3:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 6: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-63

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C2– INSTALLATION & TESTING OF SIGNALING SYSTEM

Sheet 3 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 2:

(e) Tandang Sora Station (inclusive) to North Avenue Station (exclusive)

(f) North Avenue Station (inclusive) to Quezon Avenue Station (exclusive)

(g) Quezon Avenue Station (inclusive) to East Avenue Station (exclusive)

(h) East Avenue Station (inclusive) to Anonas Station (exclusive)

(i) Anonas Station (inclusive) to Katipunan Station (exclusive)

(j) Katipunan Station (inclusive) to Ortigas North Station (exclusive)

(k) Ortigas North Station (inclusive) to Ortigas South Station (exclusive)

(l) Ortigas South Station (inclusive) to Kalayaan Avenue Station (exclusive)

(m) Kalayaan Avenue Station (inclusive) to Bonifacio Global City Station (exclusive)

Total of Sheet 3 of Schedule C2:

Total of Sheet 1, Sheet 2 and Sheet 3 of Schedule C2 carried forward to Sheet 4:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 7: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-64

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C2– INSTALLATION & TESTING OF SIGNALING SYSTEM

Sheet 4 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 3:

(n) Bonifacio Global City Station (inclusive) to Lawton Station (exclusive)

(o) Lawton Station (inclusive) to Senate Station (exclusive)

(p) Senate Station (inclusive) to Food Terminal Inc. (FTI) Station (exclusive)

Demarcation point shall be at the Buffer stop toward FTI direction after Terminal 3 Turnout.

(q) Senate Station (exclusive) to Terminal 3 Station (inclusive)

C2.4 Completion of installation, site testing and integrated testing for all sub-systems for Onboard equipment.

C2.5 Completion of System Acceptance Test.

C2.6 Completion of the remaining works.

Total of Sheet 4 of Schedule C2:

Total of Sheet 1, Sheet 2, Sheet 3 and Sheet 4 of Schedule C2 carried forward to Summary of Cost Centre C:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 8: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-65

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C3 – INSTALLATION & TESTING OF TELECOMMUNICATION SYSTEM

Sheet 1 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

C3.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for Inspection Test Plan, Testing and Commissioning Management Plan.

C3.2 Completion of installation, site testing and integrated testing for all sub-systems for the Communications System for all indoor equipment and waysidefor the following:

(a) PRI Building and Track section Area at Depot

(b) Depot

(c) East Valenzuela

(d) Quirino Highway

(e) Tandang Sora

(f) North Avenue

(g) Quezon Avenue

(h) East Avenue

(i) Anonas

(j) Katipunan

(k) Ortigas North

Total of Sheet 1 of Schedule C3 carried forward to Sheet 2:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 9: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-66

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C3 – INSTALLATION & TESTING OF TELECOMMUNICATION SYSTEM

Sheet 2 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 1:

(k) Ortigas South

(l) Kalayaan Avenue

(m) Bonifacio Global City

(n) Lawton

(o) Senate

(p) Terminal 3

C3.3 Completion of installation, site testing and integrated testing for all sub-systems for the Communications System for all outdoor and waysideequipment for the following:

(a) PRI Building and Track section Area (inclusive) at Depot (Exclusive)

(b) Depot(inclusive) to East Valenzuela Station (Exclusive)

(c) East Valenzuela Station (inclusive) to Quirino Highway Station (exclusive)

(d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive)

(e) Tandang Sora Station (inclusive) to North Avenue Station (exclusive)

Total of Sheet 2 of Schedule C3:

Total of Sheet 1 and Sheet 2 of Schedule C3 carried forward to sheet 3:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 10: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-67

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C3 – INSTALLATION & TESTING OF TELECOMMUNICATION SYSTEM

Sheet 3 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 2:

(e) North Avenue Station (inclusive) to Quezon Avenue Station (exclusive)

(f) Quezon Avenue Station (inclusive) to East Avenue Station (exclusive)

(g) East Avenue Station (inclusive) to Anonas Station (exclusive)

(h) Anonas Station (inclusive) to Katipunan Station (exclusive)

(i) Katipunan Station (inclusive) to Ortigas North Station (exclusive)

(j) Ortigas North Station (inclusive) to Ortigas South Station (exclusive)

(k) Ortigas South Station (exclusive) to Kalayaan Avenue Station (exclusive)

(l) Kalayaan Avenue Station (inclusive) to Bonifacio Global City Station (exclusive)

(m) Bonifacio Global City Station (inclusive) to Lawton Station (exclusive)

(n) Lawton Station (inclusive) to Senate Station (exclusive)

Total of Sheet 3 of Schedule C3:

Total of Sheet 1, Sheet 2 and Sheet 3 of Schedule C3 carried forward to Sheet 4:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 11: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-68

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C3 – INSTALLATION & TESTING OF TELECOMMUNICATION SYSTEM

Sheet 4 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 3:

(o) Senate Station (exclusive) to Terminal 3 Station (inclusive)

C3.4 Completion of System Acceptance Test.

C3.5 Completion of the remaining works.

Total of Sheet 4 of Schedule C3:

Total of Sheet 1, Sheet 2, Sheet 3 and Sheet 4 of Schedule C3 carried forward to Summary of Cost Centre C:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 12: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-69

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C4– INSTALLATION AND TESTING OF POWER SUPPLY SYSTEM AT

SUBSTATIONS

Sheet 1 of 3

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

C4.1 Obtain Notice of No Objection or Notice of No Objection With Comment(s) from the Engineer for Inspection Test Plan, Testing and Commissioning Management Plan.

C4.2 Completion of installation, site testing and integrated testing for all sub-systems for the BSS, TSS, SSS, SP and P-SCADA as follows:

(a) DC Breaker at Depot SSS for PRI

(b) AC Breaker at Depot SSS for PRI

(c) Depot TSS

(d) Depot BSS

(e) Depot SSS

(f) East Valenzuela TSS

(g) East Valenzuela SSS

(h) Quirino Highway TSS

(i) Quirino Highway SSS

(j) Tandang Sore TSS

(k) Tandang Sora SSS

(l) North Avenue TSS

(m) North Avenue SSS

(n) Quezon Avenue SSS

Total of Sheet 1 of Schedule C4 carried forward to Sheet 2:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 13: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-70

COST CENTRE C – INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C4– INSTALLATION AND TESTING OF POWER SUPPLY SYSTEM AT

SUBSTATIONS

Sheet 2 of 3

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 1:

(o) East Avenue TSS

(p) East Avenue SSS

(q) Anonas TSS

(r) Anonas SSS

(s) Katipunan TSS

(t) Katipunan SSS

(u) Ortigas North TSS

(v) Ortigas North SSS

(w) Ortigas South SSS

(x) Kalayaan Avenue TSS

(y) Kalayaan Avenue SSS

(z) Bonifacio Global City SSS

(aa) Lawton TSS

(ab) Lawton SSS

Total of Sheet 2 of Schedule C4:

Total of Sheet 1 and Sheet 2 of Schedule C4 carried forward to Sheet 3:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 14: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-71

COST CENTRE C – INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C4 – INSTALLATION AND TESTING OF POWER SUPPLY SYSTEM AT

SUBSTATIONS

Sheet 3 of 3

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 2:

(ac) Lawton SP

(ad) Senate TSS

(ae) Senate SSS

(af) Senate BSS

(ag) Terminal 3 TSS

(ah) Terminal 3 SSS

C4.3 Completion of System Acceptance Test.

C4.4 Completion of the remaining works.

Total of Sheet 3 of Schedule C4:

Total of Sheet 1, Sheet 2 and Sheet 3 of Schedule C4 carried forward to Summary of Cost Centre C:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 15: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-72

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C5–INSTALLATION AND TESTING OF POWER DISTRIBUTION SYSTEM

Sheet 1 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

C5.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for InspectionTest Plan, Testing and Commissioning Management Plan.

C5.2 Completion of installation, site testing and integrated testing for all sub-systems for the 34.5Kv Distribution System and emergency power supply for the following:

(a) PRI at Depot

(b) Depot

(c) East Valenzuela

(d) Quirino Highway

(e) Tandang Sora

(f) North Avenue

(g) Quezon Avenue

(h) East Avenue

(i) Anonas

(j) Katipunan

Total of Sheet 1 of Schedule C5 carried forward to Sheet 2:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 16: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-73

COST CENTRE C – INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C5 –INSTALLATION AND TESTING OF POWER DISTRIBUTION SYSTEM

Sheet 2 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 1:

(k) Ortigas North

(l) Ortigas South

(m) Kalayaan Avenue

(n) Bonifacio Global City

(o) Lawton

(p) Senate

(q) Terminal 3

C5.3 Completion of installation, site testing and integrated testing for all sub-systems for the Distribution System and tunnel lighting for the following:

(a) Depotfor PRI

(b) Depot to East Valenzuela Station

(c) East Valenzuela Station to Quirino Highway Station

(d) Quirino Highway Station to Tandang Sora Station

(e) Tandang Sora Station to North Avenue Station

Total of Sheet 2 of Schedule C5:

Total of Sheet 1 and Sheet 2 of Schedule C5 carried forward to Sheet 3:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 17: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-74

COST CENTRE C – INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C5 –INSTALLATION AND TESTING OF POWER DISTRIBUTION SYSTEM

Sheet 3 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 2:

(f) North Avenue Station to Quezon Avenue Station

(g) Quezon Avenue Station to East Avenue Station

(h) East Avenue Station to Anonas Station

(i) Anonas Station to Katipunan Station

(j) Katipunan Station to Ortigas North Station

(k) Ortigas North Station to Ortigas South Station

(l) Ortigas South Station to Kalayaan Avenue Station

(m) Kalayaan Avenue Station to Bonifacio Global City Station

(n) Bonifacio Global City Station to Lawton Station

Total of Sheet 3 of Schedule C5:

Total of Sheet 1, Sheet 2 and Sheet 3 of Schedule C5 carried forward to Sheet 4:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 18: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-75

COST CENTRE C – INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C5 –INSTALLATION AND TESTING OF POWER DISTRIBUTION SYSTEM

Sheet 4 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 3:

(o) Lawton Station to Senate Station

(p) Senate Station to Food Terminal Inc. (FTI) Station

(q) Senate Station to Terminal 3 Station

C5.4 Completion of system Acceptance Test.

C5.5 Completion of the remaining works.

Total of Sheet 4 of Schedule C5:

Total of Sheet 1, Sheet 2, Sheet and Sheet 4 of Schedule C5 carried forward to Summary of Cost Centre C:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 19: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-76

COST CENTRE C – INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C6 –INSTALLATION AND TESTING OF OVERHEAD CONTACT SYSTEM

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

C6.1 Obtain Notice of No Objection or Notice of No Objection With Comment(s) from the Engineer for InspectionTest Plan, Testing and Commissioning Management Plan.

C6.2 Completion of installation, site testing and integrated testing for the Overhead Contact System for the following:

(a) Depot (part inclusive) to PRI (inclusive)

(b) Depot (inclusive) to East Valenzuela Station (Exclusive)

(c) East Valenzuela Station (inclusive) to North Avenue Station (inclusive)

(d) North Avenue Station (exclusive) Station to Terminal 3 Station (inclusive)

C6.3 Completion of System Acceptance Test.

C6.4 Completion of the remaining works.

Total of Schedule C6 carried forward to Summary of Cost Centre C:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 20: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-77

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C7 – INSTALLATION & TESTING OF AUTOMATIC FARE COLLECTION

SYSTEM

Sheet 1 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

C7.1 Obtain Notice of No Objection or Notice of No Objection With Comment(s) from the Engineer for InspectionTest Plan, Testing and Commissioning Management Plan.

C7.2 Completion of installation and testing of all AFC equipment at the Depot and all Station (i.e. Station computers and station assistance terminals, automatic gates, ticket vending machines, points of sale, handheld terminals, special tools for cash counting, special tools for card counting, furniture within AFC rooms, customer service rooms and BMS rooms, uninterruptible power supply (UPS), power supply distribution facilities, local area network (LAN) and interfaces to the Telecommunication backbone network, including the standalone AFC at PRI:

(a) PRI building at Depot

(b) Depot

(c) Training Center

(d) East Valenzuela

(e) Quirino Highway

(f) Tandang Sora

(g) North Avenue

(h) Quezon Avenue

(i) East Avenue

Total of Sheet 1 of Schedule C7 carried forward to Sheet 2:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 21: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-78

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C7 – INSTALLATION & TESTING OF AUTOMATIC FARE COLLECTION

SYSTEM

Sheet 2 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 1:

(j) Anonas

(k) Katipunan

(l) Ortigas North

(m) Ortigas South

(n) Kalayaan Avenue

(o) Bonifacio Global City

(p) Lawton

(q) Senate

(r) Terminal 3

C7.3 Completion of installation and testing of card initialization devices at the following :

(a) PRI building at Depot (standalone Testing)

(b) Depot

(c) Training Center

(d) East Valenzuela

(e) Quirino Highway

Total of Sheet 2 of Schedule C7:

Total of Sheet 1 and Sheet 2 of Schedule C7 carried forward to sheet 3:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 22: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-79

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C7 – INSTALLATION & TESTING OF AUTOMATIC FARE COLLECTION

SYSTEM

Sheet 3 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 2:

(f) Tandang Sora

(g) North Avenue

(h) Quezon Avenue

(i) East Avenue

(j) Anonas

(k) Katipunan

(l) Ortigas North

(m) Ortigas South

(n) Kalayaan Avenue

(o) Bonifacio Global City

(p) Lawton

(q) Senate

Total of Sheet 3 of Schedule C7:

Total of Sheet 1, Sheet 2 and Sheet 3 of Schedule C7 carried forward to Sheet 4:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 23: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-80

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C7 – INSTALLATION & TESTING OF AUTOMATIC FARE COLLECTION

SYSTEM

Sheet 4 of 4

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 3:

(r) Terminal 3

C7.4 Completion of System Acceptance Test.

C7.5 Completion of the remaining works.

Total of Sheet 4 of Schedule C7:

Total of Sheet 1, Sheet 2, Sheet 3 and Sheet 4 of Schedule C7 carried forward to Summary of Cost Centre C:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 24: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-81

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C8 – INSTALLATION & TESTING OF PLATFORM SCREEN DOORS

SYSTEM

Sheet 1 of 2

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

C8.1 Obtain Notice of No Objection or Notice of No Objection With Comment(s) from the Engineer for InspectionTest Plan, Testing and Commissioning Management Plan.

C8.2 Completion of installation and integrated testing of the Platform Screen Doors System including testing with the ATO:

(a) PRI

(b) East Valenzuela

(c) Quirino Highway

(d) Tandang Sora

(e) North Avenue

(f) Quezon Avenue

(g) East Avenue

(h) Anonas

(i) Katipunan

(j) Ortigas North

Total of Sheet 1 of Schedule C7 carried forward to Sheet 2:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 25: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-82

COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING

SCHEDULE C8 – INSTALLATION & TESTING OF PLATFORM SCREEN DOORS

SYSTEM

Sheet 2 of 2

ITEM

DESCRIPTION

AMOUNT

FOREIGN CURRENCY

PHP

Total carried forward from Sheet 1:

(k) Ortigas South

(l) Kalayaan Avenue

(m) Bonifacio Global City

(n) Lawton

(o) Senate

(p) Terminal 3

C8.3 Completion of System Acceptance Test.

C8.4 Completion of the remaining works.

Total of Sheet 2 of Schedule C8:

Total of Sheet 1 and Sheet 2 of Schedule C8 carried forward to Summary of Cost Centre C:

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 26: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-95

COST CENTRE E – PROVISIONAL SUMS

LABOUR, MATERIALS AND EQUIPMENT COSTS FOR DAYWORK

The Bidder shall complete Schedules E1, E2 and E3. The Bidder may add details and/or items

which he considers necessary for the evaluation of Daywork, to the Schedules.

SCHEDULE E1 – LABOUR COST FOR DAYWORK

Labour Daily Rate

(PHP)

No. of Man-

days

Amount

FOREIGN CURRENCY

PHP

Supervisor 100

Assistant

Supervisor

100

Welder 100

Electrician 100

Carpenter 100

Skilled Worker 100

Unskilled

Worker

100

Total of Schedule E1 to be carried forward to

Summary of Cost Centre E:

Note.: The role is an example only, Contractor to specify roles.

The daily rates shall be inclusive of all direct costs, overheads and profit.

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 27: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-96

COST CENTRE E – PROVISIONAL SUMS

SCHEDULE E2 – MATERIAL COST FOR DAYWORK

Material Rate

(PHP)

Unit Quantity Amount

FOREIGN CURRENCY

PHP

Coarse

aggregate for

Concrete and

asphalt concrete

1,000

Fine aggregate

for Concrete

and asphalt

concrete

1,000

Portland

Cement 200

Reinforcing

Steel 50

Wood Pile 200

Section Steel 20

Corrugated

Steel Pipe 100

Total of Schedule E2 to be carried forward to Summary of

Cost Centre E:

The unit rates shall be inclusive of all direct costs, overheads and profit.

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 28: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS

BF-97

COST CENTRE E – PROVISIONAL SUMS

SCHEDULE E3 – CONTRACTOR’S EQUIPMENT COST FOR DAYWORK

The Bidder may add details of equipment capacities where necessary.

Equipment Daily Rate

(PHP)

No. of Man-

days

Amount

FOREIGN CURRENCY

PHP

Backhoe Loader 100

Bulldozer 100

Dump Truck 100

Tyre Roller 100

Truck Crane 100

Water Distributor

Truck 100

Asphalt Finisher 100

Truck Mixer 100

Tractor Shovel 100

Air Compressor 100

Generator 100

Concrete Breaker 100

Winch 100

Submersible Pump 100

Tamper 100

Total of Schedule E3 to be carried forward to

Summary of Cost Centre E:

The daily rates shall be inclusive of all direct costs, overheads and profit.

Name of Bidder _________________________________________________________

Signature of Bidder ______________________________ Date ___________________

Page 29: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PC-5

ATTACHMENT 1 TO PARTICULAR CONDITIONS

PART A CONTRACT DATA

SCHEDULE OF KEY DATES

Week Nos. shown in the Schedule of Key Dates represent lapsed time in weeks from the

Commencement Date. The Week Nos. shall be converted to actual Calendar dates upon receipt

by the Contractor of the Engineer’s instruction to commence the Works.

The Contractor shall achieve the Key Dates within the working hours of the last day of the week

specified. The delay damages stipulated in Part A Contract Data of the Particular Conditions

are applicable for delays in achieving the Key Dates.

SCHEDULE OF KEY DATES

PO Section

Remaining Section

Key Date Description Week No.

KD -PO-1 Completion of all works in East Valenzuela Station in CP101 87

KD -PO-2 HV Power On 205

KD -PO-3 Completion of all sub-systems to enable CP107 to test

1st Train 227

KD -PO-4 Commencement of Trial Run 244

KD-PO-5 Completion of Trial Run for PO section 257

Key Date Description Week No.

KD -RS-1 HV Power On Quezon Avenue Station in CP102 222

KD -RS-2 HV Power On East Avenue Station in CP102 222

KD -RS-3 HV Power On Anonas Station in CP103 222

KD -RS-4 HV Power On Katipunan Station in CP103 222

Page 30: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PC-6

KD -RS-5 HV Power On Ortigas North Station in CP104 222

KD -RS-6 HV Power On Ortigas South Station in CP104 222

KD -RS-7 HV Power On Kalayaan Station in CP105 257

KD -RS-8 HV Power On Bonifacio Global City Station in CP105 257

KD -RS-9 HV Power On Lawton Station in CP108 257

KD -RS-10 HV Power On Senate Station in CP108 257

KD -RS-11 HV Power On T3 Station in CP109 270

KD-RS-12 Completion of all sub-systems for the first civil batchto enable

train testing by CP107 for Remaining Section 248

KD-RS-13 Commencement of Trial Run 309

KD-RS-14 Completion of Works 322

Page 31: COST CENTRE C INSTALLATION, TESTING AND …€¦ · (d) Quirino Highway (inclusive) Station to Tandang Sora Station (exclusive) (e) Tandang Sora Station (inclusive) to North Avenue

General Bid Bulletin No.1

Annex “C”

PC-7

ATTACHMENT 2 TO PARTICULAR CONDITIONS

SCHEDULE OF ACCESS DATES

PO Section

Remaining Section

Access Date Description Week No.

AD -PO-1 Access for Track Work in East Valenzuela Station in CP101 48

AD -PO-2 Access for Equipment rooms in East Valenzuela Station in CP101 70

AD -PO-3 Access to Depot 130

AD -PO-4 Access to Quirino Highway Station in CP101 165

AD -PO-5 Access to North Avenue Station in CP101 165

AD -PO-6 Access to Tandang Sora Station in CP101 165

Key Date Description Week No.

AD -RS-1 Access to Ortigas North Station in CP104 170

AD -RS-2 Access to Ortigas South Station in CP104 170

AD -RS-3 Access to Quezon Avenue Station in CP102 170

AD -RS-4 Access to East Avenue Station in CP102 170

AD -RS-5 Access to Anonas Station in CP103 170

AD -RS-6 Access to Katipunan Station in CP103 170

AD -RS-7 Access to Kalayaan Station in CP105 205

AD -RS-8 Access to Bonifacio Global City Station in CP105 205

AD -RS-9 Access to Lawton Station in CP108 205

AD -RS-10 Access to Senate Station in CP108 205

AD -RS-11 Access to T3 Station in CP109 218