    Test of lever OperatedTest of lever Operated

    continuous sprayercontinuous sprayer

    A sprayer, theA sprayer, the

    pump of which haspump of which hasto operatedto operated

    continuously whilecontinuously while

    liquid is dischargedliquid is discharged

  • 8/9/2019 Copy of LOK Test

    2/30

    Test ProcedureTest Procedure

    The specifications and setting details given byThe specifications and setting details given bythe manufacturer shall be checked andthe manufacturer shall be checked andconfirmed.confirmed.

    Some of the items to be examined are :Some of the items to be examined are :-- Method of applying and maintaining pressure onMethod of applying and maintaining pressure on

    spray liquidspray liquid

    Capacity of liquid containersCapacity of liquid containers

    Size of pump or diaphragmSize of pump or diaphragm Size and capacity of engineSize and capacity of engine

    Weight of unitWeight of unit

  • 8/9/2019 Copy of LOK Test

    3/30

  • 8/9/2019 Copy of LOK Test

    4/30

    Volumetric efficiency, VVolumetric efficiency, Vee

    Ve = (Volume discharged

    per stroke / Piston

    displacement)

  • 8/9/2019 Copy of LOK Test

    5/30

    Test of pressure chamberTest of pressure chamber

    If the sprayer is fitted with an external pressureIf the sprayer is fitted with an external pressure

    chamber, this must be tested for leaks orchamber, this must be tested for leaks or

    deformation.deformation.

    The chamber shall be pressurised to a staticThe chamber shall be pressurised to a static

    hydraulic pressure of at least twice the maximumhydraulic pressure of at least twice the maximum

    recommended working pressure, which shall berecommended working pressure, which shall be

    maintained for a minimum period of 5 minutes.maintained for a minimum period of 5 minutes.

    During this period, the chamber shall beDuring this period, the chamber shall be

    examined for leaks or deformation.examined for leaks or deformation.

  • 8/9/2019 Copy of LOK Test

    6/30

    Discharge test of NozzlesDischarge test of Nozzles

    The discharge from the nozzle shall beThe discharge from the nozzle shall be

    measured at the maximummeasured at the maximum and minimumand minimum

    pressures recommen

    dedpressures recommen

    ded byby thethe sprayersprayermanufacturer over a period of one minute.manufacturer over a period of one minute.

    Measurements shall only be made whenMeasurements shall only be made when

    the required pressure has stabilised andthe required pressure has stabilised and

    the mean of five replications shall bethe mean of five replications shall berecorded for each type of nozzle used.recorded for each type of nozzle used.

  • 8/9/2019 Copy of LOK Test

    7/30

    Spray distribution of NozzlesSpray distribution of Nozzles

    Spray distribution is measured using aSpray distribution is measured using a"Pattemator" (Section 4.6.4)."Pattemator" (Section 4.6.4).

    The nozzle shall be positioned above the benchThe nozzle shall be positioned above the benchin its normal working attitude to direct its sprayin its normal working attitude to direct its sprayon to the troughs of the distribution bench.on to the troughs of the distribution bench.

    If the manufacturer indicates an optimumIf the manufacturer indicates an optimumworking height, the test shall be made at thisworking height, the test shall be made at thisheight as well as 150mm above and below thisheight as well as 150mm above and below this

    height.height.

  • 8/9/2019 Copy of LOK Test

    8/30

    Spray distribution (contd.)Spray distribution (contd.)

    If the manufacturer does not indicate a workingIf the manufacturer does not indicate a workingheight, the test should be carried out at heights ofheight, the test should be carried out at heights of300, 400 and 500mm. The heights shall be300, 400 and 500mm. The heights shall be

    measured from the ridges of the distribution benchmeasured from the ridges of the distribution benchto the nozzle orifices.to the nozzle orifices.

    Tests shall be made at the maximum and minimumTests shall be made at the maximum and minimum

    pressures recommended by the manufacturer andpressures recommended by the manufacturer andin the case of a compression sprayer of the nonin the case of a compression sprayer of the non--pressure retaining type, at the beginning, in thepressure retaining type, at the beginning, in themiddle and just before the end of discharge.middle and just before the end of discharge.

  • 8/9/2019 Copy of LOK Test

    9/30

    Spray distribution (contd.)Spray distribution (contd.)

    Test runs shall be made over a period of oneTest runs shall be made over a period of oneminute or until the liquid collected in one of theminute or until the liquid collected in one of thetubes reaches 90% of its capacity. The amounttubes reaches 90% of its capacity. The amountcollected from each groove shall be recordedcollected from each groove shall be recorded

    and shown in the report as a table or a graphand shown in the report as a table or a graph(Fig 4.32). The graph will show the volume(Fig 4.32). The graph will show the volumecollected for each groove as a percentage of thecollected for each groove as a percentage of themean volume.mean volume.

    The coThe co--efficient of variation shall be calculatedefficient of variation shall be calculatedfor each test.for each test.

    Coefficient of variation =Coefficient of variation =

    (Standard deviation/Mean value) x 100(Standard deviation/Mean value) x 100

  • 8/9/2019 Copy of LOK Test

    10/30

    Horizontal Throw testHorizontal Throw test

    Target cards are fixed to a series of ten rows ofTarget cards are fixed to a series of ten rows ofseven pegs, 1 meter above the ground.seven pegs, 1 meter above the ground.

    The pegs are 1 apart between rows and 0.75 mThe pegs are 1 apart between rows and 0.75 mwithin rows, the first being 3within rows, the first being 3 mm from the sprayerfrom the sprayernozzle set at the same height as the targetnozzle set at the same height as the targetcards.cards.

    The layout of the targets should be screenedThe layout of the targets should be screenedfrom prevailing winds and tests carried whenfrom prevailing winds and tests carried when

    wind speeds are negligible.wind speeds are negligible. The targets are sprayed for 5 seconds with aThe targets are sprayed for 5 seconds with a

    suitable dyed liquid.suitable dyed liquid.

  • 8/9/2019 Copy of LOK Test

    11/30

    Horizontal throw (contd.)Horizontal throw (contd.)

    The horizontal throw can be more simplyThe horizontal throw can be more simply

    determined by spraying clean water on todetermined by spraying clean water on to

    a dry concrete floor in winda dry concrete floor in wind--free area andfree area and

    measuring the distance covered by themeasuring the distance covered by the

    spray (Section 4.6.4).spray (Section 4.6.4).

    Tests at various nozzle set should beTests at various nozzle set should be

    carried out.carried out.

  • 8/9/2019 Copy of LOK Test

    12/30

    Field conditionsField conditions

    The following conditions will require to beThe following conditions will require to be

    clearly stated for each type of plot :clearly stated for each type of plot :--

    Size of plotSize of plot Type of cropType of crop

    Height of cropHeight of crop

    Distance between plants and rowsDistance between plants and rowsAmbient conditionsAmbient conditions

  • 8/9/2019 Copy of LOK Test

    13/30

    Time of testTime of test

    The sprayer shall be operated inThe sprayer shall be operated in

    accordance with the manufacturersaccordance with the manufacturers

    instructions on various plots andinstructions on various plots andtypes of crop for a total time of abouttypes of crop for a total time of about

    20 hours using at least 2 operators.20 hours using at least 2 operators.

  • 8/9/2019 Copy of LOK Test

    14/30

    Measurement/observationMeasurement/observation

    The following items shall be measured orThe following items shall be measured orobserved :observed :--

    Rate of workRate of work

    Pesticide application ratePesticide application rate Comfort and fatigue of operatorComfort and fatigue of operator

    Ease of filling, dismantling and maintenanceEase of filling, dismantling and maintenance

    Ease of operation of lance or blower nozzleEase of operation of lance or blower nozzle

    Leakage from tanks, pipes or valvesLeakage from tanks, pipes or valves Ease of control and maintenance of engineEase of control and maintenance of engine

    Vibration of unitVibration of unit

  • 8/9/2019 Copy of LOK Test

    15/30

    Test ReportTest Report

    1. Diagram1. Diagram

  • 8/9/2019 Copy of LOK Test

    16/30

    Test ReportTest Report-- SpecificationSpecification

  • 8/9/2019 Copy of LOK Test

    17/30

    Hand operated SprayerHand operated Sprayer

    Test Report- Specification (contd.)

  • 8/9/2019 Copy of LOK Test

    18/30

    Motorized SprayerMotorized Sprayer

  • 8/9/2019 Copy of LOK Test

    19/30

    Lab Test Results for ContinuousLab Test Results for Continuous

    LOK SprayerLOK Sprayer Volume Efficiency testVolume Efficiency test

    Pressure chamber testPressure chamber test

    Nozzle testNozzle test Discharge testDischarge test

    Spray distribution testSpray distribution test

    Coefficient of variation ofCoefficient of variation of

  • 8/9/2019 Copy of LOK Test

    20/30

    Volumetric EfficiencyVolumetric Efficiency

  • 8/9/2019 Copy of LOK Test

    21/30

    Pressure Chamber testPressure Chamber test

    Test No.Test No.

    11 22 33 44 55

  • 8/9/2019 Copy of LOK Test

    22/30

    Nozzle Discharge testNozzle Discharge test

    Test No.Test No.

    11 22 33 44 55

  • 8/9/2019 Copy of LOK Test

    23/30

    Spray Distribution testSpray Distribution test

  • 8/9/2019 Copy of LOK Test

    24/30

    Horizontal ThrowHorizontal Throw

    No. of ReplicationNo. of Replication11 22 33 44 55

    1. Type of nozzle1. Type of nozzle

    2. Pressure2. Pressure3. No. of stroke3. No. of stroke

    4. Time of spray4. Time of spray

    5. Distance of spray from5. Distance of spray from

    nozzle minimumnozzle minimum

    6. Distance of spray from6. Distance of spray from

    nozzle maxnozzle max

  • 8/9/2019 Copy of LOK Test

    25/30

    Field testField test

  • 8/9/2019 Copy of LOK Test

    26/30

    Field ConditionsField Conditions

  • 8/9/2019 Copy of LOK Test

    27/30

    Sprayer and blowerSprayer and blower

  • 8/9/2019 Copy of LOK Test

    28/30

  • 8/9/2019 Copy of LOK Test

    29/30

    Results of testResults of test

    Test No.Test No.

    11 22 33 44 55

  • 8/9/2019 Copy of LOK Test

    30/30

    Observations During testsObservations During tests