TKO - TKO Joint HostelSubject : Summary Table of As fitted drawing submission
Item Trade Submission Reference Description Drawing No Rev 1st Submissiondate
JRP Reply Reference JRP Reply Date Remarks
1208/SSF/0088 Legend, Schematic Diagram for ELV System CW/708/EE/102 C 6/1/2016 Approved with commetns. Re-submission is requiredElect. Meter Room Details for 1, 4 & 7/F CW/708/EE/801 BElect. Meter Room Details for 3 & 6/F CW/708/EE/802 BElect. Meter Room Details for 2, 5 & 8/F CW/708/EE/803 BElect. Meter Room Details for 9/F CW/708/EE/804 0Elect. Meter Room Details for G/F CW/708/EE/805 BLegends, Abbreviation, General Note & Lighting Fitting Schedule for ElectricalInstallation
CW/708/EE/001 D
Schematic Diagram for Main Electrical Distribution System CW/708/EE/101 EMCB/MCCB Detail (Sheet 1 of 2) CW/708/EE/701 BMCB/MCCB Detail (Sheet 2 of 2) CW/708/EE/702 BTrunking Layout for R/F CW/708/EE/508 DTrunking Layout for 9/F CW/708/EE/507 DTrunking Layout for 7-8/F CW/708/EE/506 DTrunking Layout for 6/F CW/708/EE/505 DTrunking Layout for 5/F CW/708/EE/504 DTrunking Layout for 2-4/F CW/708/EE/503 DTrunking Layout for 1/F CW/708/EE/502 DTrunking Layout for G/F CW/708/EE/501 DELV Layout for R/F CW/708/EE/408 CELV Layout for 9/F CW/708/EE/407 C
ELV Layout for 7-8/F CW/708/EE/406 CELV Layout for 6/F CW/708/EE/405 CELV Layout for 5/F CW/708/EE/404 CELV Layout for 2-4/F CW/708/EE/403 CELV Layout for 1/F CW/708/EE/402 CELV Layout for G/F CW/708/EE/401 CPower Layout for R/F CW/708/EE/308 DPower Layout for 9/F CW/708/EE/307 DPower Layout for 7-8/F CW/708/EE/306 DPower Layout for 6/F CW/708/EE/305 DPower Layout for 5/F CW/708/EE/304 DPower Layout for 2-4/F CW/708/EE/303 DPower Layout for 1/F CW/708/EE/302 DPower Layout for G/F CW/708/EE/301 DLighting Layout for R/F CW/708/EE/208 ELighting Layout for 9/F CW/708/EE/207 ELighting Layout for 7-8/F CW/708/EE/206 ELighting Layout for 6/F CW/708/EE/205 ELighting Layout for 5/F CW/708/EE/204 ELighting Layout for 2-4/F CW/708/EE/203 ELighting Layout for 1/F CW/708/EE/202 ELighting Layout for G/F CW/708/EE/201 E600kVA Emergency Generator Layout Plan & Section CW/708/EE/516 B
G/F Layout Plan CW/708/EE/515 B1/F Layout Plan CW/708/EE/514 B
13/1/2016
1 Chun Wo
1208/SSF/0089
1208/SSF/0091
1208/SSF/0092
1208/SSF/0093
Approved with commetns. Re-submission is required
Approved with commetns. Re-submission is required
Approved with commetns. Re-submission is required
Approved with commetns. Re-submission is required
8527/00451/RT/SL/jh 22/1/2016
13/1/2016
13/1/2016
6/1/2016
-
7/24/2019 Copy of as-built Drawing Record
2/4
-
7/24/2019 Copy of as-built Drawing Record
3/4
-
7/24/2019 Copy of as-built Drawing Record
4/4
Details (Sheet 1 of 3) 8527/DR/1501 - Found in OrderDetails (Sheet 2 of 3) 8527/DR/1502 - Found in OrderDetails (Sheet 3 of 3) 8527/DR/1503 - Found in OrderLiftwell Plan for Lift No. L1~L2 BLiftwell Plan for Lift No. L3~L4 B
Entrance Elevation for Lift No. L1~L2 DEntrance Elevation for Lift No. L3~L4 DSection of Liftwell for Lift No. L1~L4 CBuilder's Work of Liftwell Plan for Lift No. L1~L2 ABuilder's Work of Liftwell Plan for Lift No. L3~L4 ABuilder's Work of Entrance Elevation for Lift No. L1~L2 CBuilder's Work of Entrance Elevation for Lift No. L3~L4 DBuilder's Work of Section of Liftwell for Lift No. L1~L4 BSupervisory Panel for Lift No. L1~L4 BCar Cage Design for Lift No. L1~L4 BHall Fixture for Lift No L1~L4 D
Hall Fixture & Car Operating Panel for Lift No. L1~L4 C
Date : 04 Feb 2016 Legend Pending for JRP comment / approval
Resubmission is required
Approved
Pending for JRP comment / approval6 Mitsubishi 1208/SSF/0097 22/1/2016