![Page 1: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/1.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Project Team
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
![Page 2: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/2.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Building Statistics
620 Eighth Ave. Times SquareMidtown Manhattan, New York, NY
The New York Times Building
o The New York Times Company: Floors 2 ‐ 27o Forrest City Ratner Companies: Floors 29 ‐ 50
Building Ownerso Class A Office Buildingo Retail Space on Ground Floor
Building Function
o Assumed construction cost of $ 1 billiono New York Times Portion: $ 604 ‐ $ 624 million
Building Cost
www.international-pc.com/
2
![Page 3: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/3.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Building Background
o 6250 ton chilled water systemo 1.4 MW cogeneration systemo District steam heatingo UFAD / VAV air distribution
Mechanical:
Lighting/Electrical:Building Architecture
o 52 story office building, 745’ tall o Unique façade with ceramic rod shading systemo 1.5 million square feet
Vertical Transportationo 28 elevators serving the towero High speed “smart” design (1,600 ft/min)o Cutting edge call system
o 18,000 Luminaireso Fixtures Controlled by a Digitally
Addressable Lighting Interface (DALI)o 5 Transformers with Room for Expansion
Structural:o Composite Beam & Girder Floor Systemo Steel Braced Frame Lateral Force Resisting Systemo Outriggers on 28th & 51st Mechanical Levelso Exposed Pretension Exterior Steel Rodso Exposed 30”x30” Built‐up Steel Columnso Thermal Trusses on 51st Mechanical Floors
www.international-pc.com/
3
![Page 4: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/4.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Project Team
o August 23, 2004 – Excavation Begins
o July 2006 – Topping Out Ceremony
o November 19, 2007 – Grand Opening of the New York Times Building
Project Milestones:Architects: Renzo Piano Building WorkshopFXFOWLE Architects
CM: AMEC Construction Mgmt. (Core & Shell)Turner Construction (NYT Interiors)
Structural: Thornton Tomasetti
MEP: Flack and Kurtz
www.international-pc.com/
4
![Page 5: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/5.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Redesign Goals
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
www.international-pc.com/
5
![Page 6: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/6.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Redesign Strategies
Decrease floor to floor height to allow for an additional rentable floor
Redesigning core to add additional rentable space on each floor
Improve the sustainability profile
www.international-pc.com/
6
![Page 7: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/7.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Façade Redesign
Façade Goals:
Redesign Opportunities:
o Increase Thermal Efficiency o Maintain or Exceed Daylighting Performanceo Maintain Iconic Image
TransparencyLightnessInnovative Design
o Explore Double‐Skin Façade o Explore Alternate Shading Techniques
7
![Page 8: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/8.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
System Description
2’ 6” air cavity with horizontal louvered shading system
1” interior insulating glazing curtain wall
5/8” exterior laminated glazing unit
8
![Page 9: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/9.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Daylight Autonomy: Rod Design Daylight Autonomy: Louvered Design
Façade Daylight Analysis
9
![Page 10: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/10.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Eighth Floor Power Consumption
Maximum Potential: 71 kWh
Rod Design: 27 kWh
Louvered Design: 28 kWh
60% Energy Savings
$10,000 / Year
Façade Daylight Analysis
10
![Page 11: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/11.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Peak cooling: 58%o Peak heating: 75%
Existing HVAC Envelope Loads:
o Decreased U‐valueo Decreased Shading Coefficient
Double‐Skin Façade Thermal Efficiency:
Existing Façade Double‐Skin Façade
U‐Value 0.625 0.50
Shading Coefficient 0.750 0.38
Thermal Loads
11
![Page 12: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/12.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Peak cooling: 58%o Peak heating: 75%
Existing HVAC Envelope Loads:
o Decreased U‐valueo Decreased Shading Coefficient
Double‐Skin Façade Thermal Efficiency:
o Energy (21%)
Savings:
Thermal Loads
12
![Page 13: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/13.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Peak cooling: 58%o Peak heating: 75%
Existing HVAC Envelope Loads:
o Decreased U‐valueo Decreased Shading Coefficient
Double‐Skin Façade Thermal Efficiency:
o Energy (21%)
Savings:
o Cost ($800,000 / year)
Thermal Loads
13
![Page 14: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/14.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Peak cooling: 58%o Peak heating: 75%
Existing HVAC Envelope Loads:
o Decreased U‐valueo Decreased Shading Coefficient
Double‐Skin Façade Thermal Efficiency:
o Energy (21%)
Savings:
o Cost ($800,000 / year)o Emissions (23%)
Thermal Loads
14
![Page 15: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/15.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Serviceability and Maintenance
2.5’ accessible cavity
Louvers support walking loads
15
![Page 16: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/16.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Cost Comparison:
Double-skin façade yields an $18.7 million increase in up front cost
Annual energy savings of $800,000
Simple payback period of 23.43 years
Original Façade System $ 83,527,260
Proposed Double Façade $ 102,273,745
Upfront Cost Increase $ 18,746,485
Annual Energy Savings $ (800,000)
Simple Payback Period 23.43 Years
16
![Page 17: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/17.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N S
E
W
250W Floodlight
400W Floodlight
Façade Lighting Redesign
17
![Page 18: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/18.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Façade Lighting Redesign
18
![Page 19: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/19.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N S
E
W
400W Floodlight
Façade Lighting Redesign
19
![Page 20: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/20.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Façade Lighting Redesign
20
![Page 21: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/21.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N S
E
W400W Floodlight
Façade Lighting Redesign
21
![Page 22: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/22.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Façade Lighting Redesign
22
![Page 23: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/23.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Goals:o Increase rentable floor space o Decrease floor-to-floor height
Redesign Opportunities:o HVAC (UFAD/VAV to Chilled Beams)o Structural Floor System (Castellated Beams)
Floor System Redesign
23
![Page 24: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/24.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Initial Studyo Investigate the required depth for interstitial
space
Assumptions: o Loading conditions were the same as in the
existing buildingo UFAD System would be removed
Structural Analysis
Result:o 28” Deep Castellated Beam Required
24
![Page 25: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/25.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Initial StudyInvestigate the required depth for interstitial space
Assumptions: Loading conditions were the same as in the existing building
UFAD System would be removed
Structural AnalysisCeiling Plenum: 3’ 10”Raised Floor: 6”
Concrete Floor: 5 1/4”
Castellated Beam: 28” Max
Clearance: 5”
Ceiling to Chilled Beam: 1’ 8”
25
![Page 26: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/26.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Floor System Redesign:
Composite Castellated Beams
Allow for Coordination within Interstitial space
Structural Floor System
26
![Page 27: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/27.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Floor System Redesign:
Composite Castellated Beams
Allow for Coordination within Interstitial space
Metal Deck
Long Span Metal Deck
Dovetail Ribbed Composite Metal Deck
Structural Floor System
Dovetail Ribbed Composite Metal Deck (DT)
Long Span Metal Deck (LS)
27
![Page 28: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/28.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Floor System Redesign:
Configuration 1:15’-0” Span Typ.
Configuration 1:o Maximize Spano Minimize Number of Members
Structural Floor System
28
![Page 29: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/29.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Floor System Redesign:
Configuration 2:10’-0” span Typ.
Configuration 2:o Minimize Shoring
Structural Floor System
29
![Page 30: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/30.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Options Investigated
Gravity Loadingo Superimposed Dead Load ‐ 20 psfo Live Load – 50 psf (+ 20 psf partitions)
30
![Page 31: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/31.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Configuration 1
31
![Page 32: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/32.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Configuration 2
32
![Page 33: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/33.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Floor System Redesign:
Floor Vibrations Due to Human Activity (AISC Design Guide 11)
Structural Configuration 1
33
![Page 34: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/34.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Configuration 1
34
![Page 35: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/35.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Structural Floor System
35
![Page 36: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/36.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
System Steel Framing Concrete Floor Reshoring Total
Lightweight Concrete ‐ Config. 1 $ 7,920,000 $ 82,160,000 $ 2,490,000 $ 92,580,000
Normalweight Concrete ‐ Config. 1 $ 7,920,000 $ 61,950,000 $ 2,490,000 $ 72,370,000
Lightweight Concrete ‐ Config. 2 $ 8,540,000 $ 82,160,000 $ ‐ $ 90,700,000
Normalweight Concrete ‐ Config. 2 $ 8,540,000 $ 61,950,000 $ ‐ $ 70,490,000
Existing Floor Configurationo Configuration #2 – 10 ft. typical spanso Wide‐flange Beamso Typical Composite Metal Deck
Floor Configurations Conclusions
New Floor Configuration o Castellated Beams o Configuration #2 – 10 ft. typical spanso Dovetail deck
Cost Comparison of Floor Configurations
36
![Page 37: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/37.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Member Check @ Cant. & Overhang
o Used New Loading Conditionso Verified Existing was Adequate or Resized Appropriately
Structural Floor System Redesign
37
![Page 38: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/38.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
www.halton.com www.halton.com
www.Halton.com
HVAC Redesign
Multiservice Chilled Beams:o Integrated design
38
![Page 39: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/39.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Multiservice Chilled Beams:o Integrated design
Typical Layout:o 155 beams per floor
HVAC Redesign
39
![Page 40: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/40.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Multiservice Chilled Beams:o Integrated design
o Energy (10-16%)Savings:
Typical Layout:o 155 beams per floor
HVAC Redesign
40
![Page 41: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/41.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Multiservice Chilled Beams:o Integrated design
o Energy (10-16%)Savings:
o Cost ($47,000 / month)
Typical Layout:o 155 beams per floor
HVAC Redesign
41
![Page 42: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/42.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Multiservice Chilled Beams:o Integrated design
o Energy (10-16%)Savings:
o Cost ($47,000 / month)o Emissions (8-16%)
Typical Layout:o 155 beams per floor
HVAC Redesign
42
![Page 43: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/43.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
4’ T5HO Direct/Indirect Pendant
Integrated 35W T5 Direct Pendant
4’ Recessed Cove
N
SEW
Office Lighting Redesign
43
![Page 44: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/44.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
44
![Page 45: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/45.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
45
![Page 46: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/46.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
46
![Page 47: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/47.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
47
![Page 48: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/48.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
48
![Page 49: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/49.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
49
![Page 50: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/50.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
50
![Page 51: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/51.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
51
![Page 52: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/52.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
SEW
Office Lighting Redesign
52
![Page 53: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/53.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Office Lighting Redesign
53
![Page 54: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/54.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Cost addition of extra floor
Cost of Proposed Floor System
54
![Page 55: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/55.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Cost addition of extra flooro Additional SF of leasable area
Cost of Proposed Floor System
55
![Page 56: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/56.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Cost addition of extra flooro Additional SF of leasable areao Chilled beam cost savings
Cost of Proposed Floor System
56
![Page 57: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/57.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Cost addition of extra flooro Additional SF of leasable areao Chilled beam cost savingso Overall cost comparison
Cost of Proposed Floor System
57
![Page 58: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/58.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Constructability
Integrated Design
58
![Page 59: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/59.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Constructabilityo BIM Use Analysis
o 3D Coordinationo Parties Involved
o Structural o Mechanicalo Lighting / Electricalo Construction Management
o Outcome
Integrated Design
59
![Page 60: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/60.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Goals:o Increase rentable floor spaceo Explore trade issues ( Concrete vs. Steel Core)o Explore cost for core redesign
Redesign Opportunities:o Reconfigure core layout structurally and architecturallyo Decrease footprint of the structural coreo Service Space
Core Redesign
60
![Page 61: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/61.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
CG
Maintain structural symmetryo Reduces torsional effects due to lateral loads
o Center of geometry converges with center of pressure, center of mass, and center of rigidity
o Layout of elevators
Core Configuration
61
![Page 62: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/62.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Existing Configuration
New ConfigurationExample: Floors 46 ‐ 50Maintain flexibility of space
Core Configuration
62
![Page 63: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/63.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Elevator Configuration
Existing Configuration
26 Passenger Elev.2 Service Elev.
Feasibility Study: Elevator Reduction
22 Passenger Elev.2 Service Elev.
63
![Page 64: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/64.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Final Configuration
26 Passenger Elev.2 Service Elev.
Core Configuration
64
Existing Configuration
26 Passenger Elev.2 Service Elev.
![Page 65: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/65.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
New Core ConfigurationExisting Core Configuration
44 ft44 ft
40 ft
48 ft
48 ft
Floor Occupant Existing Leasable Area (SF)
New Leasable Area (SF) Difference (SF)
50 FCRC 21,943 22,126 183 49 FCRC 21,943 22,126 183 48 FCRC 21,943 22,126 183 47 FCRC 21,943 22,126 183 46 FCRC 21,943 22,126 183 45 FCRC 21,943 22,126 183 44 FCRC 21,650 22,126 476 43 FCRC 21,650 22,126 476 42 FCRC 21,650 22,126 476 41 FCRC 21,650 22,126 476 40 FCRC 21,244 21,456 212 39 FCRC 21,244 21,456 212 38 FCRC 21,244 21,456 212 37 FCRC 21,244 21,456 212 36 FCRC 21,244 21,456 212 35 FCRC 21,244 21,456 212 34 FCRC 21,244 21,456 212 33 FCRC 21,244 21,456 212 32 FCRC 21,244 21,456 212 31 FCRC 21,244 21,456 212 30 FCRC 21,244 21,456 212 29 FCRC 20,429 20,959 530
472,371SF 478,235 SF 5,864 SF
Architectural Configuration
65
![Page 66: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/66.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Core Configuration
32 ft
47 ft36 ft43 ft
Existing Lobby
New Lobby Rendering
66
![Page 67: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/67.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Service Space Configuration
Service Elevators
70 SF
11 ft
67
![Page 68: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/68.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Service Space Configuration
Existing Conditions in NYT Portion18 3 1/2” Conduit Feeders
Powers Lighting and Appliance Panels
6 3 1/2” Conduit FeedersPowers Mechanical Equipment Panels
Proposed Redesign2 2500 Amp Aluminum Bus Duct Feeders
Powers Lighting and Appliance Panels
1 1600 Amp Aluminum Bus Duct FeederPowers Mechanical Equipment Panels
Bus Duct Vs Conduit AnalysisTotal Cost System
Bus Duct: $1.75 million
Conduit: $1.2 million
Benefit of Bus Duct FeedersPossibility of Expansion Without Adding Additional Feeders
Bus Duct Vs Conduit Analysis
Space ComparisonMinimal difference between required space
68
![Page 69: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/69.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Lateral Force Resisting System
Concrete Shear Wall Core w/ Outriggers on the 28th Mechanical Floor
69
![Page 70: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/70.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Initial Design Parameters
Assumed Serviceability Governed DesignSRSS – Period of Vibration
o 10% of 10.8s (Existing Design)Serviceability Limit States Under Wind Load ‐
Lawrence G. Griffis (AISC 1993)
Lateral Drift & DeflectionoWind ‐ H/450 = 19.88” (Existing Design)
o D+0.5L+0.7W (ASCE 7‐05, CC.1.2)o Seismic – 0.015hsx
o 1.0 E
Lateral Force Resisting System
Design checked for Strength
70
![Page 71: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/71.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Design Summary
Lateral Force Resisting System
Shear Wall Core
Coupling Beamso 36” Deptho Width Dependent upon Support
71
![Page 72: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/72.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Shear Wall Design: Base Level
Lateral Force Resisting System N
SEW
72
![Page 73: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/73.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Shear Wall Design: Level 2 – Level 28
Lateral Force Resisting System
73
N
SEW
![Page 74: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/74.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Shear Wall Design: Level 29 – Roof
Lateral Force Resisting System N
SEW
74
![Page 75: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/75.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Outrigger Design – 28th Mechanical Flooro Outrigger Design
Lateral Force Resisting System
75
![Page 76: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/76.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Lateral Force Resisting Systemo Outrigger Design
Lateral Force Resisting System
76
![Page 77: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/77.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Lateral Force Resisting Systemo Outrigger Design
Lateral Force Resisting System
77
![Page 78: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/78.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Design Parameters
Lateral Force Resisting System
Strength Check – Adequate
Assumed Serviceability Governed DesignSRSS – Period of Vibration
o 10% of 10.8s (Existing Design)Serviceability Limit States Under Wind Load ‐
Lawrence G. Griffis (AISC 1993)
Lateral Drift & DeflectionoWind ‐ H/450 = 19.88” (Existing Design)
o D+0.5L+0.7W (ASCE 7‐05, CC.1.2)o Seismic – 0.015hsx
o 1.0 E
78
![Page 79: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/79.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Cost of concrete core vs. existing steel core
General conditions changeso Superstructure scheduleo GC cost changeso Constructability
Overall Cost Analysis
Item Quantity CostSteel Core $ (37,171,395)Concrete Core 21,500 CY $ 18,676,730
Crane Addition 2.5 Month $ 81,700
Temporary Heating 2 Winters $ 4,000,000
Upfront Savings $ (14,412,965)*Additional Rent Annually
5,864 SF $ 351,840 per year
Cost and Schedule Changes
79
![Page 80: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/80.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Cost and Schedule Changes
Cost of concrete core vs. existing steel core
General conditions changeso Superstructure scheduleo GC cost changeso Constructability
Overall Cost Analysis
80
![Page 81: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/81.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Item Quantity CostSteel Core $ (37,171,395)Concrete Core 21,500 CY $ 18,676,730
Crane Addition 2.5 Month $ 81,700
Temporary Heating 2 Winters $ 4,000,000
Upfront Savings $ (14,412,965)*Additional Rent Annually
5,8464 SF $ 351,840 per year
Cost and Schedule Changes
Cost of concrete core vs. existing steel core
General conditions changeso Superstructure scheduleo GC cost changeso Constructability
Overall Cost Analysis
81
![Page 82: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/82.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Item Quantity CostSteel Core $ (37,171,395)Concrete Core 21,500 CY $ 18,676,730
Crane Addition 2.5 Month $ 81,700
Temporary Heating 2 Winters $ 4,000,000
Upfront Savings $ (14,412,965)*Additional Rent Annually
5,8464 SF $ 351,840 per year
Cost and Schedule Changes
Cost of concrete core vs. existing steel core
General conditions changeso Superstructure scheduleo GC cost changeso Constructability
Overall Cost Analysis
82
![Page 83: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/83.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
E
9” Recessed Downlight
4’ Recessed Cove
8” Recessed Directional Downlight W
Lobby Lighting Redesign
83
![Page 84: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/84.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
EW
Lobby Lighting Redesign
84
![Page 85: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/85.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
EW
Lobby Lighting Redesign
85
![Page 86: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/86.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
EW
Lobby Lighting Redesign
86
![Page 87: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/87.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
EW
Lobby Lighting Redesign
87
![Page 88: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/88.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
EW
Lobby Lighting Redesign
88
![Page 89: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/89.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
EW
Lobby Lighting Redesign
89
![Page 90: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/90.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
EW
Lobby Lighting Redesign
90
![Page 91: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/91.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
N
S
EW
Lobby Lighting Redesign
91
![Page 92: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/92.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Lobby Lighting Redesign
92
![Page 93: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/93.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o 1.4 MW Internal Combustiono 40% power capacity for NYTo 250 ton absorption chiller
Existing System:
o 100% power capacity for NYTo Increased energy cost savingso Decreased energy associated emissionso All met!
Redesign Goals:
Existing System / Goals
93
![Page 94: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/94.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Utility data / Spark gap o Space constraints (3000 ft2 total)
Utility Yearly $/Unit ReferenceNatural Gas $1.392/Ccf New York State Public Service Commission
Electric $0.249/kWh New York State Public Service CommissionSteam $18.36/Mlb Consolodated EdisonWater $2.31/per(748gals) New York City Water Board
Redesign Considerations
94
![Page 95: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/95.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Redesign Considerations:
o Building thermal and electrical loads o Underutilized cooling potential
Redesign Consideration
95
![Page 96: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/96.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Prime Movers
Gas Turbines
IC Engines
Redesign Alternatives
96
![Page 97: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/97.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Prime Movers Existing System: 1,400 kW
Redesign Alternatives
IC Engines
97
![Page 98: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/98.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Prime Movers Alternative 1: 4,200 kW
Redesign Alternatives
IC Engines
98
![Page 99: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/99.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Prime Movers Alternative 2: 2,700 kW
Redesign Alternatives
IC Engines
+
1,300 kW IC Engine
99
![Page 100: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/100.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Prime Movers Alternative 3: 2,700 kW
Redesign Alternatives
IC Engines
+
1,300 kW Gas Turbine
100
![Page 101: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/101.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o IC Engine: Cooling Load Potential o Gas Turbine: Excess Thermal
Redesign Alternatives
101
![Page 102: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/102.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Redesign Alternatives
Energy / Emissions
102
![Page 103: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/103.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Redesign Alternatives
Energy Costs Total Energy Costs: $13.5 million for SHP
103
![Page 104: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/104.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Redesign Alternatives
Simple Payback Period
104
![Page 105: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/105.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
o Summary
Alternative 2: $10 million in savings over 20 years
Redesign Alternatives
105
![Page 106: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/106.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Integrated Project Delivery Process
106
![Page 107: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/107.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
BIM Process
Building Information Modeling Process:
BIM Goals
Group Goals: o Enhance communication and information flowo Visualize project changes
BIM Use Analysis
Workflows
107
![Page 108: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/108.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
BIM Goals
Building Information Modeling Process:
BIM Goals
Group Goals: o Enhance communication and information flowo Visualize project changes
BIM Use Analysis
Workflows
108
![Page 109: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/109.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
BIM Use Analysis
Building Information Modeling Process:
BIM Goals
Group Goals: o Enhance communication and information flowo Visualize project changes
BIM Use Analysis
Workflows
BIM Uses Analysis
Design Authoring
Design Review
3D Coordination
Phase Planning
109
![Page 110: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/110.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
BIM Workflows
Building Information Modeling Process:
BIM Goals
Group Goals: o Enhance communication and information flowo Visualize project changes
BIM Use Analysis
Workflows
110
![Page 111: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/111.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
$
Metrics of Success
111
![Page 112: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/112.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
Metrics of Success
Additional Square Footage 26,864 SF
Additional Rent $ 1,601,840
112
![Page 113: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/113.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
Metrics of Success
113
![Page 114: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/114.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
Metrics of Success
114
![Page 115: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/115.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
Metrics of Success
115
![Page 116: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/116.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
Metrics of Success
116
![Page 117: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/117.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
Metrics of Success
117
![Page 118: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/118.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
Metrics of Success
118
![Page 119: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/119.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
$
Metrics of SuccessFaçade
Upfront Cost $ 18.7 million
Annual Energy Savings $ 800,000
Payback Period 23.4 years
Floor System
Upfront Cost $ 12.3 million
Annual Energy Savings $ 565,800
Annual Added Rent $ 1.24 million
Payback Period 6.72 years
Core
Upfront Cost ($ 14.4 million)
Annual Added Rent $ 351,840
Payback Period NA
119
![Page 120: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/120.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
IntroBuilding BackgroundProposal
Facade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Increased Profitability• Operating Costs• Leasable Space
Increased Marketability• Sustainability • Iconic Image
$
Metrics of Success
Overall Building
Upfront Cost $ 17 million
Annual Added Rent $ 1.6 million
Annual Energy Savings $ 2.2 million
Payback Period 4.5 years
120
![Page 121: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/121.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
AcknowledgementsThank you to the following for all the support, assistance and guidance:
Architectural Engineering Faculty and Staff •IPD/BIM Thesis Advisors:
Kevin ParfittBob Holland
•Mechanical Thesis Advisor: Jelena Srebric, Ph.D.
• Structural Thesis Advisor: Andres Lepage, Ph. D
• Lighting/Electrical Thesis Advisors: Kevin Houser, Ph. DTheodore Dannerth
• Construction Management Thesis Advisors: Chimay Anumba, Ph. D Jim Faust
•CHP Instruction: James Freihaut, Ph.D.
• Project Sponsors: The New York Times Company Thornton TomassettiWSP Flack + Kurtz Turner Construction
•CHP Contacts: Dave Yanni | Director, Business Development and Operations,
Endurant Energy, LLC Randy Musselman | Engineering, Cleveland Brothers,
Power Systems Division • High-rise Consultant:
Bob McNamara
Fellow BIM Teams for their support in this collaborative process
THANK YOU to All of our friends and family for their love and support!
Sponsors and Consultants
121
![Page 122: Coppin State University · o The New York Times Company: Floors 2 ‐27 o Forrest City Ratner Companies: Floors 29 ‐50 Building BuildingOwners](https://reader033.vdocuments.site/reader033/viewer/2022060517/6049a0dfce898971321b10f8/html5/thumbnails/122.jpg)
BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ BIM TEAM 3: MATT HEDRICK | KYLE HORST | CASEY LEMAN | ANDRES PEREZ
IntroBuilding BackgroundProposal
Façade RedesignFloor System RedesignCore RedesignCoGen Redesign
BIM/IPDMetrics of Success
Questions/Comments