Follow-up meeting: Scope, Overview of updated plans and Project Schedule Please note: all microphones will be muted throughout the presentation Presentation will be recorded Question and answers will be after the presentation. Please type your questions/comments in the Chat box and/or take turns to unmute and speak Presentation and Q&A posted on our website: www.broward.org/BCEngineering and this link Presented By: Laila Kitchen, Project Manager Broward County Highway Construction and Engineering Division May 6, 2021 COPANS ROAD IMPROVEMENT PROJECT From NW 49 Terrace to NW 42 Ave 1

Upload: others

Post on 24-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Follow-up meeting:

Scope, Overview of updated plans and Project Schedule

Please note: all microphones will be muted throughout the presentation

Presentation will be recorded

Question and answers will be after the presentation. Please type your questions/comments in the Chat box and/or take turns to unmute and speak

Presentation and Q&A posted on our website: www.broward.org/BCEngineering and this link

Presented By:

Laila Kitchen, Project Manager

Broward County Highway Construction and

Engineering Division

May 6, 2021

COPANS ROAD IMPROVEMENT PROJECT

From NW 49 Terrace to NW 42 Ave1

LKITCHEN
Text Box
PROJECT
LKITCHEN
Callout
BEGIN PROJECT
LKITCHEN
Text Box
Lyons Road
LKITCHEN
Text Box
City Hall
LKITCHEN
Text Box
NW 42 Ave
LKITCHEN
Text Box
NW 49 Terr
lkitchen
Text Box
PROJECT LOCATION/OVERVIEW
LKITCHEN
Callout
FDOT PROJECT
LKITCHEN
Callout
FDOT PROJECT
LKITCHEN
Callout
END PROJECT
LKITCHEN
Callout
FDOT PROJECT

COPANS ROAD IMPROVEMENT PROJECT

From NW 49 Terrace to NW 42 Ave

Public Concerns and outcome from March meeting:

• Reduced speed and narrow lanes: collaboration with City to keep

existing 45 mph and 11’ lanes

• Increased noise and landscape/berm impacts, difficult to exit

from community: EB lane addition not proposed, noise will not be

increased, minimize landscaping/berm impact

• Westbound merge condition: changed to drop lane condition

• Need right-turn lane into Township Circle: added

• Shift bus stops: coordinated with BC Transit and bus stop at SE

corner has been shifted to the east and bus stop at NW corner has

been shifted to the south

2

COPANS ROAD IMPROVEMENT PROJECT

From NW 49 Terrace to NW 42 Ave

TRAFFIC STUDY

• Traffic Study recommends addition of EB and WB through lanes and

maximize storage of left turn lanes

• Updated design: add WB lane through lane and maximize storage of

left turn lanes

3

BC-2 AM Peak 2040 Delay (s/v)

Overall Eastbound Westbound Northbound Southbound

118 s/v Left Left Thru Right Left Thru

109 121 47 18 106 179

2040 AM Do Nothing Delay (s/v)

Overall Eastbound Westbound Southbound

121 s/v Left Left Thru Right Left Thru

132.2 168 68 24 116 188

BC-2 PM Peak 2040 Delay (s/v)

Overall Eastbound Westbound Northbound Southbound

79 s/v Left Thru Left Thru Left Thru Right

123 70 132 109 135 87 23

2040 PM Do Nothing Delay (s/v)

Overall Eastbound Northbound Southbound

117 s/v Left Thru Left Thru Left Thru Right

184 137 171 178 175 141 37

COPANS ROAD IMPROVEMENT PROJECT

From NW 49 Terrace to NW 42 Ave

• Main objective: relieve traffic congestion at the intersection, reduce CO2 emissions,

and minimize delays for emergency vehicles responding to the needs of residents in

the area

• Add additional WB through-lane, maximize left-turn storage to reduce congestion

• Collaboration with City: keep 45 mph speed limit and 11’ through-lane widths

• Reduce impact on outside landscaping and berm by minimizing medians

• Few impacted trees will be relocated or replaced with new

• Mill & resurface existing road pavement to extend service life

• New mast arms at Copans Road and Lyons Road Intersection

• Improve drainage system

• ADA improvements

• Install new signing and pavement markings to re-align the lanes

• Incorporate complete streets elements: 10’ shared use path on both sides of the

road, delineated for bicyclists and pedestrians

4

EXISTING CONDITIONS

1) 2-lane roadway in each direction without curb and gutter

2) Missing sidewalk and bike facility

5

6

PROPOSED TYPICAL SECTION6

PROJECT SCHEDULE

➢ Final Plans Production – Summer 2021

➢ Construction Begin – Winter 2021

➢ Construction Finish – Winter 2022

7

RIGHT OF WAY

RIGHT OF WAY

NW 49 TERR

WIDENIN

G AREAS

RIGHT OF WAY

BUS STOP PAD

CITY HALL

COPANS ROAD

RIGHT OF WAY

RIGHT OF WAY

LYONS ROAD

LYONS ROAD

BUS STOP PAD

BUS STOP PAD

RIGHT OF WAY

RIGHT OF WAY RIGHT OF WAY

COPANS ROAD

NW 44 AVE

TOWNSHIP CIR

BUS STOP PAD

NW 42 AVE

NW 42 AVE

THANK YOU

➢ Thank you for attending and for your

valuable input

➢ We are open for questions and comments

now

➢ Contact for County Project Manager:

Laila Kitchen at [email protected]

954-577-4565