ENGINEER ED SOLUTIONS™
c o n t r a c t o r s
2
EnginEErEd SolutionS™
From
Design assistance provided for Versa-Floor™ [HR]* projects
*patents pending
Custom Engineered Floor System for mid- and High-rise Structures
» Long-Span Metal Dek and structural steel floor assembly» Prefabricated panels •Onepanelcancoverupto1,200sq.ft. •Panelscanclearspanupto35ft.» Performance tested •Fire •SoundandImpact •Vibration •Structural» Built-in lineal chase way»Uniqueassemblyusingtraditionalconstuctiontechniques
and materials
3
Custom EnginEErEdCompositE Floor systEm
» Reduce project schedule by up to 50%*
» Double or triple floor installation speed* (15,000 sq. ft. per crane per day)*
» Enhance jobsite safety*» Reduce workforce
*Compared to CIP construction
SPEEd + SAFEtY = monEY
Mid- & High-Rise Structures» Decreases weight of structure •Reducesfoundationrequirements •Lessensseismicimpact» Reduces column footprint •Facilitatesspaceplanning •Produces2%moreuseablefloorspace» Provides flexibility •Allowsforcoredrillingwhereneeded •Offersoptionsforsuspendingcomponents •FinisheswithpaintedDekorgypsumceilings
Panelization» Creates vertically aligned lineal chase way for M/E/P» Creates flush spandrel beam condition
(Allowsfloor-to-ceilingglasscurtainwall)
Safety with Panelization»Assemblesatgradelevel» Carries welded wire fabric and rebar bundles
when lifted» Includes fall protection before lifting
Vertical Transportation of Panels» Needs fewer crane picks» Carries additional materials when lifted» Reduces burden on man lifts
Production» Provides for controlled output»Facilitatesqualitycontrol»Allowsforpanelinspectionbeforelifting» Installs with limited to no shoring»Allowstimelyaccesstotrades
EngInEErIngPErFOrmancE» Gravity and shear load
tested
»UL2-hourunprotected fire rating
» Sound Transmission classupto57dB
»ImpactInsulation classupto57dB
» Vibration conforms to aIScDesignguide11
Floor SYStEm BEnEFitS JoBSitE BEnEFitS
4 5
Custom EnginEErEdCompositE Floor systEm
InSTallaTIon PRoCESS1.Setmulti-storystructuralsteelcolumns2.InstallVersa-Floor™ [HR] panelized sections3.Installtemporaryshoringbeams,ifrequired4.InstallVersa-Dek® at corridors and balconies5.Blockoutchasewayswhereopeningsarerequired
6.Installweldedwirefabric7.Installnegativereinforcement,ifrequired8.Installspandrelbeamsystematperimeter9.Pournormalorlightweightconcrete
reinforced Spandrel Beam (See detail page 6)
multi-Story Structural Steel Column
Seat Angle for Versa-Floor™ [Hr] Panel
deep-dek® Composite
Floor Dek with Factory – Closed Ends
m/E/P riser Block-out
negative reinforcementas required
m/E/P Chaseway — Created by Versa-Floor™ [Hr] Panels(See detail page 6)
Versa-Floor™ [Hr] Prefabricated Panel
Versa-Floor™ [Hr] Panel to Column Connection(See detail page 6)
Spandrel Beam Assembly
Versa-dek® Composite at Corridors
m/E/P riser Block-out in Floors Below
normal or light Weight Concrete
Welded Wire Fabric
Versa-Floor™ [HR] panel cut section
at reinforced spandrel beam
Versa-Floor™ [HR] panel-to-column connection
(Deep-Dek® Composite section partially removed & opposite channel shown for clarity)
Versa-Floor™ [HR] panels forming M/E/P chase way
6
7
Versa-Floor™ [HR] panels create aligned lineal chase ways, which simplify M/E/P installation.
Flush spandrel beam condition allows floor-to-ceiling glass curtain wall.
Versa-Floor™ [HR] creates unobstructed ceilings without filler beams.
Versa-Floor™ [HR] has no post-tension strands to hinder M/E/P installation.
Custom EnginEErEdCompositE Floor systEm
dESign FlExiBilitY
main office: 650 rosewood drive » Columbia, sC 29201
phone (888) 335-3746 » www.metaldek.com
versafloor.com
Contact the Versa-Floor™ [HR] Design Team for design and technical assistance.
main office: 1730 West reno » oklahoma City, oK 73106
phone (405) 235-3621 » www.wwsteel.com
©2009 metal dek group v07.09