Page 1: contractors - Metal Dek Group® — A unit of … · Design assistance provided for ... » Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Safety

ENGINEER ED SOLUTIONS™

c o n t r a c t o r s

Page 2: contractors - Metal Dek Group® — A unit of … · Design assistance provided for ... » Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Safety

2

EnginEErEd SolutionS™

From

Design assistance provided for Versa-Floor™ [HR]* projects

*patents pending

Custom Engineered Floor System for mid- and High-rise Structures

» Long-Span Metal Dek and structural steel floor assembly» Prefabricated panels •Onepanelcancoverupto1,200sq.ft. •Panelscanclearspanupto35ft.» Performance tested •Fire •SoundandImpact •Vibration •Structural» Built-in lineal chase way»Uniqueassemblyusingtraditionalconstuctiontechniques

and materials

Page 3: contractors - Metal Dek Group® — A unit of … · Design assistance provided for ... » Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Safety

3

Custom EnginEErEdCompositE Floor systEm

» Reduce project schedule by up to 50%*

» Double or triple floor installation speed* (15,000 sq. ft. per crane per day)*

» Enhance jobsite safety*» Reduce workforce

*Compared to CIP construction

SPEEd + SAFEtY = monEY

Mid- & High-Rise Structures» Decreases weight of structure •Reducesfoundationrequirements •Lessensseismicimpact» Reduces column footprint •Facilitatesspaceplanning •Produces2%moreuseablefloorspace» Provides flexibility •Allowsforcoredrillingwhereneeded •Offersoptionsforsuspendingcomponents •FinisheswithpaintedDekorgypsumceilings

Panelization» Creates vertically aligned lineal chase way for M/E/P» Creates flush spandrel beam condition

(Allowsfloor-to-ceilingglasscurtainwall)

Safety with Panelization»Assemblesatgradelevel» Carries welded wire fabric and rebar bundles

when lifted» Includes fall protection before lifting

Vertical Transportation of Panels» Needs fewer crane picks» Carries additional materials when lifted» Reduces burden on man lifts

Production» Provides for controlled output»Facilitatesqualitycontrol»Allowsforpanelinspectionbeforelifting» Installs with limited to no shoring»Allowstimelyaccesstotrades

EngInEErIngPErFOrmancE» Gravity and shear load

tested

»UL2-hourunprotected fire rating

» Sound Transmission classupto57dB

»ImpactInsulation classupto57dB

» Vibration conforms to aIScDesignguide11

Floor SYStEm BEnEFitS JoBSitE BEnEFitS

Page 4: contractors - Metal Dek Group® — A unit of … · Design assistance provided for ... » Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Safety

4 5

Custom EnginEErEdCompositE Floor systEm

InSTallaTIon PRoCESS1.Setmulti-storystructuralsteelcolumns2.InstallVersa-Floor™ [HR] panelized sections3.Installtemporaryshoringbeams,ifrequired4.InstallVersa-Dek® at corridors and balconies5.Blockoutchasewayswhereopeningsarerequired

6.Installweldedwirefabric7.Installnegativereinforcement,ifrequired8.Installspandrelbeamsystematperimeter9.Pournormalorlightweightconcrete

reinforced Spandrel Beam (See detail page 6)

multi-Story Structural Steel Column

Seat Angle for Versa-Floor™ [Hr] Panel

deep-dek® Composite

Floor Dek with Factory – Closed Ends

m/E/P riser Block-out

negative reinforcementas required

m/E/P Chaseway — Created by Versa-Floor™ [Hr] Panels(See detail page 6)

Versa-Floor™ [Hr] Prefabricated Panel

Versa-Floor™ [Hr] Panel to Column Connection(See detail page 6)

Spandrel Beam Assembly

Versa-dek® Composite at Corridors

m/E/P riser Block-out in Floors Below

normal or light Weight Concrete

Welded Wire Fabric

Page 5: contractors - Metal Dek Group® — A unit of … · Design assistance provided for ... » Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Safety

Versa-Floor™ [HR] panel cut section

at reinforced spandrel beam

Versa-Floor™ [HR] panel-to-column connection

(Deep-Dek® Composite section partially removed & opposite channel shown for clarity)

Versa-Floor™ [HR] panels forming M/E/P chase way

6

Page 6: contractors - Metal Dek Group® — A unit of … · Design assistance provided for ... » Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Safety

7

Versa-Floor™ [HR] panels create aligned lineal chase ways, which simplify M/E/P installation.

Flush spandrel beam condition allows floor-to-ceiling glass curtain wall.

Versa-Floor™ [HR] creates unobstructed ceilings without filler beams.

Versa-Floor™ [HR] has no post-tension strands to hinder M/E/P installation.

Custom EnginEErEdCompositE Floor systEm

dESign FlExiBilitY

Page 7: contractors - Metal Dek Group® — A unit of … · Design assistance provided for ... » Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Safety

main office: 650 rosewood drive » Columbia, sC 29201

phone (888) 335-3746 » www.metaldek.com

versafloor.com

Contact the Versa-Floor™ [HR] Design Team for design and technical assistance.