  • 7/25/2019 Continuity - Level III 9TH DEC2015

    1/2

    CAMFIL

    CONTINUATION REPORT- Level III

    Date Activity

    16-02-09 : Preparation and Approval of NDE Procedures1. NDE/WP- 01 !evision 00

    2. NDE/P- 02" !evision 00

    ". NDE/P- 02# !evision 00#. NDE/P- 02$ !evision 00$. NDE/P- 026 !evision 00

    6. NDE/P- 02% !evision 00

    0$-0"-09 to 0%-0"-09 : &'- (evel )) 'rainin* +ourse

    09-0"-09 , 10-0"-09 : P'- (evel )) 'rainin* +ourse

    1"-0"-09 to 2"-0"-09 : !'- (evel )) 'rainin* +ourse

    ead/ualit

    CAMFIL

  • 7/25/2019 Continuity - Level III 9TH DEC2015

    2/2

    CONTINUATION REPORT- Level III

    Date Activity

    20-12-2011 !evie of NDE Procedures it 2011a Addenda of A&E +odes.

    21-12-2011 !evision of NDE Procedures

    NDE/WP-01 !ev. 0"

    21-12-11 to 0$-01-12 'rainin* and +ertification of Personnel in !'

    13-01-2012 De4onstration of P' Procedure P-02" !ev. 01 to A)

    19-01-2012 De4onstration of &' Procedure P-02# !ev. 01 to A)

    09-02-12 to 11-02-12 'rainin* and +ertification of Personnel in P'

    1$-02-12 to 13-02-12 'rainin* and +ertification of Personnel in &'

    2"-0#-2012 Participation in te revie/Audit of NDE docu4ents 5 A).

    06-0$-2012 Participation in te revie/Audit of NDE docu4ents 5 A).

    7

    ead/ualit