continuing care management, llc - boibord.com · 04 7300 simulated stone veneer 4 division 05 -...

31
Division 17 Notice For this project, selected MasterFormat 2004 specifications may be displayed in Division 17000. Applicable Divisions are outlined in the Table of Contents Division 17000-Other: May contain one or more of the following MasterFormat 2004 Divisions: Division 21 Fire Suppression Division 22 Plumbing Division 23 Heating, Ventilating, and Air Conditioning Division 25 Integrated Automation Division 26 Electrical Division 27 Communications Division 28 Electronic Safety and Security Division 31 Earthwork Division 32 Exterior Improvements Division 33 Utilities Division 34 Transportation Division 35 Waterway and Marine Construction Division 40 Process Integration Division 41 Material Processing and Handling Equipment Division 42 Process Heating, Cooling, and Drying Equipment Division 43 Process Gas & Liquid Handling, Purification, & Storage Equipment Division 44 Pollution Control Equipment Division 45 Industry-Specific Manufacturing Equipment Division 48 Electrical Power Generation If you have any questions about content or technical matters, please contact Customer Care. Contact Customer Care: 1-800-393-6343 [email protected] Thank you for using Dodge Data & Analytics!

Upload: vuongdiep

Post on 01-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Division 17 Notice

For this project, selected MasterFormat 2004 specifications may be displayed in Division

17000.

Applicable Divisions are outlined in the Table of Contents

Division 17000-Other: May contain one or more of the following

MasterFormat 2004 Divisions:

Division 21 Fire Suppression

Division 22 Plumbing

Division 23 Heating, Ventilating, and Air Conditioning

Division 25 Integrated Automation

Division 26 Electrical

Division 27 Communications

Division 28 Electronic Safety and Security

Division 31 Earthwork

Division 32 Exterior Improvements

Division 33 Utilities

Division 34 Transportation

Division 35 Waterway and Marine Construction

Division 40 Process Integration

Division 41 Material Processing and Handling Equipment

Division 42 Process Heating, Cooling, and Drying Equipment

Division 43 Process Gas & Liquid Handling, Purification, & Storage Equipment

Division 44 Pollution Control Equipment

Division 45 Industry-Specific Manufacturing Equipment

Division 48 Electrical Power Generation

If you have any questions about content or technical matters, please contact Customer Care.

Contact Customer Care:

1-800-393-6343

[email protected]

Thank you for using Dodge Data & Analytics!

Specifications

FOR

CONTINUING CARE MANAGEMENT, LLC 1 LYMAN STREET, WESTBOROUGH, MA 01581

508-898-3416

BY

318 MAIN STREET – SUITE 210 NORTHBOROUGH, MA 01532 508-877-4444

PROJECT NO. 1413

BID AND PERMIT APRIL 15, 2016

ADDENDUM NO. 1 April 27, 2016

1413 TABLE OF CONTENTS Page 2 Whitney Place - Sharon, MA 4/15/2016

TABLE OF CONTENTS Invitation to Bid Instruction to Bidders (AIA 701– 1997) Proposal Form – General Contract CSI Tabulation Form Standard Form of Agreement Between Owner and Contractor (AIA 101 – 2007) General Conditions of the Contract for Construction (AIA 201 – 2007) Change Order (AIA G701 – 2001) Application and Certificate for Payment (AIA G702 – 1992) Application and Certificate for Payment – Continuation Sheet (AIA G703 – 1992) Certificate of Substantial Completion (AIA G704 – 2000) Contractor’s Affidavit of Release of Liens (AIA G706A – 1994) Consent of Surety to Final Payment (AIA G707 – 1994) Work Changes Proposal Request (AIA G709 – 2001) Construction Change Directive (AIA G714 – 2007) Request for Information (AIA G716 – 2004) Transmittal Letter (AIA G810 – 2001) Punch list (CSI Form 14.1A) (AIA Documents and are included by reference only, physical copies are not included within the Specifications)

(REFER TO STRUCTURAL DRAWINGS FOR STRUCTURAL SPECIFICATIONS FOR CONCRETE, MASONRY, METALS, AND WOOD FRAMING)

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 3100 AVAILABLE PROJECT INFORMATION 1 Soils Report – dated 10/9/15 by McPhail Associates, LLC 30 Phase I Environmental Site Assessment – dates 03/20/15 by CHA 156 Asbestos Survey Report – dated 11/10/15 by American

Environmental Consultants, LLC 49

Sharon Wetlands Protection By-Laws 14 Notice of Decision – Major Site Plan Approval, Salmon Health and

Retirement Senior Community – Case No. 1771 20

Notice of Decision – Special Permit – Section 4535 Impervious Material Coverage, Salmon Health and Retirement Senior Community – Case No. 1771

8

00 5000 CONTRACTING FORMS AND SUPPLEMENTS 1 00 7200 GENERAL CONDITIONS 1 DIVISION 01 - GENERAL REQUIREMENTS 01 1000 SUMMARY 2 01 2000 PRICE AND PAYMENT PROCEDURES 3 01 3000 ADMINISTRATIVE REQUIREMENTS 6 01 4000 QUALITY REQUIREMENTS 4 01 5000 TEMPORARY FACILITIES AND CONTROLS 2 01 5813 TEMPORARY PROJECT SIGNAGE 2 01 6000 PRODUCT REQUIREMENTS 3 01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 6 01 7800 CLOSEOUT SUBMITTALS 3 DIVISION 02 – EXISTING CONDITIONS

02 3219 Exploratory Excavations 02 4119 Selective Demolition

DIVISION 03 – CAST IN PLACE 03 5400 SELF LEVELING UNDERLAYMENT 2 DIVISION 04 - MASONRY

04 7300 SIMULATED STONE VENEER 4 DIVISION 05 - METALS 05 5213 PIPE AND TUBE RAILINGS 2

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 1000 ROUGH CAPENTRY 4 06 1600 SHEATHING (ZIP SYSTEM SHEATHING) 4 06 2000 FINISH CARPENTRY 3 06 4216 WOOD-VENEER PANELING 3 06 6500 SIMULATED WOOD TRIM 10 DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 2100 THERMAL INSULATION 2 07 2119 FOAMED-IN-PLACE INSULATION 2 07 2500 WEATHER BARRIERS 3 07 3113 ASPHALT SHINGLES 4 07 4633 PLASTIC SIDING 2 07 5400 THERMOPLASTIC MEMBRANE ROOFING 5 07 6200 SHEET METAL FLASHING AND TRIM 4 07 7200 ROOF ACCESSORIES 3 07 8400 FIRESTOPPING 2 07 9200 JOINT SEALANTS 4 DIVISION 08 - OPENINGS 08 1113 HOLLOW METAL DOORS AND FRAMES 4 08 1416 FLUSH WOOD DOORS 3 08 1613 FIBERGLASS DOORS 1 08 3100 ACCESS DOORS AND PANELS 2 08 3513.23 FOLDING FIRE DOORS 2 08 4229 AUTOMATIC ENTRANCES 2 08 4313 ALUMINUM-FRAMED STOREFRONTS 4 08 5313 VINYL WINDOWS 2 08 0671 DOOR HARDWARE SCHEDULE 2016-4-14 08 7100 DOOR HARDWARE 2016-4-5 08 8000 GLAZING 2 08 9100 LOUVERS 1 DIVISION 09 - FINISHES 09 2116 GYPSUM BOARD ASSEMBLIES 4 09 3000 TILING 4 09 5100 ACOUSTICAL CEILINGS 3 09 6500 RESILIENT FLOORING 3 09 6800 CARPETING 3 09 6813 TILE CARPETING 2 09 7200 WALL COVERINGS 2

09 7733 GLASS FIBER REINFORCED PLASTIC PANELS 1 09 9113 EXTERIOR PAINTING 2 09 9123 \PLAIN\RTLCH\AF1\AFS20\ALANG0\AB\LTRCH\F1\FS20\LANG0\LA

NGNP0\LANGFE0\LANGFENP0 INTERIOR PAINTING 4

DIVISION 10 - SPECIALTIES 10 2113.19 PLASTIC TOILET COMPARTMENTS 1 10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 2 10 3100 MANUFACTURED FIREPLACES 2 10 4400 FIRE PROTECTION SPECIALTIES 2 WALL MOUNTED STANDARDS AND SHELVING 2 10 7500 FLAGPOLES 2 DIVISION 11 - EQUIPMENT 11 3100 RESIDENTIAL APPLIANCES 2 DIVISION 12 - FURNISHINGS 12 3530 RESIDENTIAL CASEWORK 2 12 3600 COUNTERTOPS 3 DIVISION 14 - CONVEYING EQUIPMENT 14 2400 HYDRAULIC ELEVATORS 5 DIVISION 21 - FIRE SUPPRESSION 21 0500 COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 0523 \PLAIN\RTLCH\AF1\AFS20\ALANG0\AB\LTRCH\F1\FS20\LAN

G0\LANGNP0\LANGFE0\LANGFENP0 GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING

21 0553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

21 1100 FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING 21 1300 FIRE SUPPRESSION SPRINKLERS 21 3000 FIRE PUMPS DIVISION 22 - PLUMBING 22 0519 METERS AND GAGES FOR PLUMBING PIPING 22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 22 0719 PLUMBING PIPING INSULATION 22 1005 PLUMBING PIPING 22 1006 PLUMBING PIPING SPECIALTIES 22 3000 PLUMBING EQUIPMENT 22 4000 PLUMBING FIXTURES DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) 23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 23 0516 EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING 23 0519 METERS AND GAGES FOR HVAC PIPING 23 0533 HEAT TRACING FOR HVAC PIPING 23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 0713 DUCT INSULATION

23 0716 HVAC EQUIPMENT INSULATION 23 0719 HVAC PIPING INSULATION 23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC 23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC 23 0993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 23 2113 HYDRONIC PIPING 23 2114 HYDRONIC SPECIALTIES 23 2123 HYDRONIC PUMPS 23 2500 HVAC WATER TREATMENT 23 3100 HVAC DUCTS AND CASINGS 23 3300 AIR DUCT ACCESSORIES 23 3423 POWER VENTILATORS 23 3600 AIR TERMINAL UNITS 23 3700 AIR OUTLETS AND INLETS 23 3813 COMMERCIAL-KITCHEN HOODS 23 5100 BREECHINGS, CHIMNEYS, AND STACKS 23 5233.13 FINNED WATER-TUBE BOILERS 23 6213 PACKAGED AIR-COOLED CONDENSER CHILLERS UNITS 23 7413 PACKAGED OUTDOOR CENTRAL-STATION AIR-HANDLING

UNITS

23 7433 PACKAGED OUTDOOR HEATING AND COOLING MAKE-UP AIR UNITS

23 8101 TERMINAL HEAT TRANSFER UNITS 23 8127 SMALL SPLIT-SYSTEM HEATING AND COOLING DIVISION 26 – ELECTRICAL SPECIFICATIONS 26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND

CABLES

26 0520 UNDERCARPET CABLES 26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 0534 CONDUIT 26 0535 SURFACE RACEWAYS 26 0537 BOXES 26 0540 UNDERFLOOR DUCTS 26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 0573 POWER SYSTEM STUDIES 26 0914 ELECTRICAL SENSING AND MEASUREMENT 26 0916 ELECTRIC CONTROLS AND RELAYS 26 0919 ENCLOSED CONTACTORS 26 0923 LIGHTING CONTROL DEVICES 26 2100 LOW-VOLTAGE ELECTRICAL SERVICE ENTRANCE 26 2413 SWITCHBOARDS 26 2416 PANELBOARDS 26 2419 MOTOR-CONTROL CENTERS 26 2717 EQUIPMENT WIRING 26 2726 WIRING DEVICES 26 2813 FUSES 26 2817 ENCLOSED CIRCUIT BREAKERS 26 2818 ENCLOSED SWITCHES 26 2913 ENCLOSED CONTROLLERS 26 2923 VARIABLE-FREQUENCY MOTOR CONTROLLERS 26 3213 ENGINE GENERATORS 26 3600 TRANSFER SWITCHES 26 4300 SURGE PROTECTIVE DEVICES

26 5100 INTERIOR LIGHTING 26 5600 EXTERIOR LIGHTING DIVISION 27 – LOW VOLTAGE SYSTEMS 27 1005 LOW VOLTAGE SYSTEMS DIVISION 28 – FIRE DETECTION AND ALARM 28 3100 FIRE DETECTION AND ALARM

DIVISION 31 – EARTHWORK

311000 Site Clearing 312000 Earth Moving 312319 Dewatering 312319.10 Well Point System for Dewatering 312333 Trenching and Backfilling 312500 Erosion and Sedimentation Controls 315000 Excavation Support and Protection

DIVISION 32 – EXTERIOR IMPROVEMENTS

320535 Surface Restoration and Repair 321116 Subbase Courses 321216 Asphalt Paving 321313 Concrete Paving 321613-16 Cast-In-Place Concrete Curbing 321613-26 Pre-Cast Concrete Curb 321613-53 Granite Curbs 321630 Concrete Sidewalks 321723 Pavement Marking 329113 Soil Preparation 329200 Turf and Grasses 329223 Sodding 329300 Plantings

DIVISION 33 – UTILITIES

330500 Common Work Results for Utilities 330513 Manholes and Structures 330514 Precast Sanitary Structures 331113-13 Ductile Iron Pipe 331120 Water Services 331216 Water Distribution Valves 331219 Water Utility Distribution Fire Hydrants 333110 Sanitary Utility Sewerage Piping 334100.20 High Density Polyethylene Pipe 334115 Reinforced Concrete Pipe

Contractor Initials __________ 0915 Proposal Form - 1

PROPOSAL FORM – GENERAL CONTRACT

NAME OF BIDDER:

PROJECT NAME: Whitney Place PROJECT LOCATION: 667 South Main Street DATE OF BID RECEIPT: Wednesday, April 27, 2016 TIME OF BID RECEIPT: 2:00 P.M. local time PLACE OF BID RECEIPT: Dario Designs, Inc. TO: David Ehrhardt

Dario Designs, Inc. 318 Main Street, Suite 210

Northborough, MA 01532

I have received the following documents all as prepared by Dario Designs Inc. or as otherwise noted:

Title: Whitney Place Dated: April 15, 2016 Drawings: See Index on Sheet C0.1 Project Manual: See Index therein.

Addendum No. __1___ Dated __04/27/16_______ Addendum No. ______ Dated ________________ Addendum No. ______ Dated ________________ Addendum No. ______ Dated ________________

In submitting this Proposal Form, I agree to the following:

1. To include all the provisions of the above documents. 2. To having examined all the documents and site conditions. 3. To accept all conditions of the Information to Bidders. 4. That this Proposal Form shall remain in effect for sixty (60) calendar days from this date. 5. To start the Work on the project no later than two (2) working days after date of Contract signing. 6. To accomplish the work all in accordance with the Contract Documents. 7. To have the work Substantially Complete within (450) Calendar Days after date of Contract signing.

No later than September 1, 2017.

I If awarded a contract on the basis of this Proposal Form I will enter into and execute the amended Standard Form Agreement Between Owner and Contractor (AIA 101 – 2007) included in the Project Manual. I have received and reviewed this document prior to receiving the Invitation to Bid.

BASE BID/LUMP SUM: (Please include both a written and numerical amount.) Dollars and Cents $____________________________________ CHANGE ORDER MARK-UP: (Please indicate the maximum mark-up to be included with change orders) General Conditions (%) Fee (%) ALLOWANCES: AMOUNT Allowance No. ONE: Winter Conditions $ Allowance No. THREE: Resident Rest RM Dr Jamb light $ 500each/ $44,000 total

Contractor Initials __________ 0915 Proposal Form - 2

ALTERNATES: ADD/DEDUCT Alternate No. ONE: Deduct - Plastic Lam. Counters $ in units in lieu of Solid Surface Alternate No. TWO: Add - Performance bond $ Alternate No. THREE: Add – Radon Active Relief System $ Alternate No. FOUR: Deduct – Remove Entire Radon Relief System (Passive & Active) $ UNIT PRICES: 1. Remove/replace unsuitable soil $ (cy) 2. Carpet tile $ (sf) 3. Cultured stone wall $ (sf) 4. Toilet room wall tile $ (sf) These amounts include materials in place, all overhead, profit, and insurance cost of all Subcontractors and Contractor. Amounts should reflect that the owner is a tax-exempt organization and therefore not subject to paying sales tax. SUBCONTRACTORS AND MAJOR MATERIAL SUPPLIERS LIST List here the name of each major subcontractor who will perform work or labor or render services or furnish materials to the undersigned for the work described in the drawings and specifications. Include the dollar value for that category. Forward the detailed Subcontractor and Major Material Suppliers List on the provided sheet following the bid submittal.

Work to be Performed Subcontractor Dollar Value Division 02 Demolition Division 03 Concrete Division 04 Masonry Division 05 Structural Steel Division 05 Misc Metals Division 06 Rough Carpentry Division 06 Millwork Division 07 Insulation Division 07 Roofing Division 08 Doors and Frames Division 08 Windows Division 08 Glass and Aluminum Division 09 Gyp Board Division 09 Ceilings Division 09 Flooring Division 10 Specialties Division 11 Equipment Division 12 Casework Division 12 Counter tops Division 14 Elevator Division 21 Fire Protection

Division 22 Plumbing

Contractor Initials __________ 0915 Proposal Form - 3

Division 23 HVAC Division 31 Earthwork Division 32 Paving Division 32 Landscaping Division 33 Site Utilities General Conditions Fee TOTAL SCHEDULE OF VALUES The Schedule of Values will be provided in the form of the CSI Tabulation Sheet following the bid submittal. Additional cost breakdowns will be provided by the Bidder as requested by the Owner. PROJECT CONSTRUCTION SCHEDULE Attach to this Proposal Form a preliminary project construction schedule. Note: include in project schedule a pre-construction meeting with the Owner and Architect. The successful bidder’s project manager and superintendant will be required to attend the pre-construction meeting.

NAME OF FIRM (Bidder) CORPORATION, PARTNERSHIP, OR SOLE PROPRIETORSHIP

ADDRESS

CITY STATE ZIP

NAME (Printed)

SIGNATURE

TITLE

STATE OF INCORPORATION

DATE STATE OF MASSACHUSETTS LICENSE NUMBER

No bid is valid unless signed by the person making the bid. State whether your organization is a corporation, a partnership, or a sole proprietorship. If the bidder is a corporation, indicate State of incorporation, and affix corporate seal; if a partnership, give full name and residential addresses of all partners; and if a sole proprietorship, give residential address if different from business address. CORPORATE SEAL:

ARCHITECTURE DESIGN PLANNING CONSULTING

318 MAIN STREET, SUITE 210, NORTHBOROUGH, MA 01532 508-877-4444 FAX 877-4474 WWW.DARIODESIGNS.COM [email protected]

5-1-2015

SALMON GROUP - SHARON, MA ASSISTED LIVING, MEMORY CARE FACILITY

SIGNAGE NARRATIVE The new Assisted Living (AL) /Memory Care (MC) facility will be a three story building for residents with an attached single story building for common spaces, such as dining and kitchen areas.

Sheet #1 Monumental Sign This is a two sided sign that will be illuminated by a decorative Hubbell flood light. This flood light will have a visor which will restrict the illumination only to the sign. There will be two of these signs. One will be located by the South Main Street Entrance and one will be located at the future Old Post Road entrance. Sheet #2 Typical Wayfinding Sign This will be the standard signage for the rest of the site. It complements the large monumental sign by mimicking the crown moulding on a smaller scale.

o 0

0

:E z-

0~~

_

0--~

~

CE

2

20 E

w 2

2~-

0

1C

2 E

x

W

q. a

EM

u

z

0J

*--E~

<<

rAz

to

~to in

rl -

-n.c

-'

-J 0)

0)

5--

R

(1 0

-i

Cj

17" 0) 8-

-n 42)

p0d

) *) .4

0cr

oc

P-

0,-

*0

I

C

~ ~

.5~

5->

.20

41 E

E o

u

-o

<

<. E

.0*

12~

~~~: E

V

~~.2

~~ 2

020*n0E

ae'~0o

4~ ig

~.-0

L~2acd

0r. ~'

V.

* *iI!M

'

)

4~1

01 ~

~ LU;2o

V2

41

0 0

00

Co to

12 0-

0 II ~

C~

C14

2 00

~C

ID

05

0,0, z

00

00 0C

~

2.2

FLL LEDDECORATIVE FLOOD

ORDERING INFORMATION

DIMENSIONS

PRODUCT IMAGE(S)SPECIFICATIONS

CERTIFICATIONS/LISTINGS

Intended Use:Large LED flood with wide beam NEMA 6 x 6 distribution for lighting applications such as safety/security, facade, area, or signs; operating tempera-ture of -35˚C to 40˚C

Construction:• Rugged die-cast aluminum housing with dark bronze finish• Tempered glass lens protects LEDs and allows for cleaning/debris removal• Vented housing isolates LED module from driver, maximizing product life and performance• Visor, louver and vandal accessories available

LED:• 28 high powered LEDs deliver 8054 lumens• 5000K CCT, 67 CRI

Optical/Electrical • Wide flood NEMA 6 x 6 distribution for general purpose flood and facade lighting• 120-277V operation, 50/60Hz, 100w, 1050mA, 80.5 LPW

Installation:• Heavy duty steel yoke with adjustable stainless steel hardware, mounting holes for one center - 3/4” bolt or two side - 3/8” bolts• 3’ SEOOW cord included• Visor, louver and vandal shield accessories available

Listings:• IP65 fixture, driver RoHS compliant and IP66• Listed to UL1598 for use in wet locations• EPA = 1.0ft2

Warranty:For more information visit:http://www.hubbelloutdoor.com/resources/warranty/

Hubbell Outdoor Lighting • 701 Millennium Boulevard • Greenville, SC 29607 • Phone: 864-678-1000Due to our continued efforts to improve our products, product specifications are subject to change without notice.© 2015 HUBBELL OUTDOOR LIGHTING, All Rights Reserved • For more information visit our website: www.hubbelloutdoor.com • Printed in USA FLL-SPEC 4/15

SHIPPING INFORMATION

Cat.#

Approvals

Job Type

Catalog Number Mount Max Candle Power Beam Pattern Wattage Drive Current Voltage Color Temperature Lumens LPWWeight lbs. (kg)

FLL-28L Yoke 5508 Wide 100w 1050mA 120-277V 5000K 8054 80.5 20.6 (9.3)

Catalog Number

G.W(kg)/CTN

Carton Dimensions

Length Inch (cm)

Width Inch (cm)

Height Inch (cm)

FLL-28L (Single carton 1 pc.) 25 (12.3) 17.72" 13.0" 9.45"IP65Carton dimensions for shipping purposes only

Yoke Mount

HFG

ACCESSORIES - Order Separately

Catalog Number DescriptionFLL-VISOR-DB Top visor (Tap holes in lens frame for field installation)93058186 96w, 120-277V Dimming driver, 1050mA (1 Qty)FLL-LOUVER-BL Black adjustable louverARF-SPC Polycarbonate vandal shield4024C Steel slipfitter for 2" pipe, 2 3/8" OD yoke mount, bronze finish4040 Heavy-duty steel wall/pole bracket; bronze Lektrocote®

A B C D E F Weight

15" 5.5" 6.0" 7.0" 6.24" 3.3" 20.6 lbs. 378 mm 140 mm 152 mm 177 mm 158 mm 84 mm 9.3 kg

B

A C

D

E

F

G H I

17/32” 3-1/8” 7/8” 14mm 79mm 22mm

FLL-LOUVER-BL

FLL-VISOR-XX

ARF-SPC

Hubbell Outdoor Lighting • 701 Millennium Boulevard • Greenville, SC 29607 • Phone: 864-678-1000Due to our continued efforts to improve our products, product specifications are subject to change without notice.© 2015 HUBBELL OUTDOOR LIGHTING, All Rights Reserved • For more information visit our website: www.hubbelloutdoor.com • Printed in USA FLL-SPEC 3/15

PHOTOMETRICS For additional photometric information and IES downloads, visit our web site at www.hubbelloutdoor.com

PERFORMANCE DATA LUMINAIRE AMBIENT TEMPERATURE FACTOR (LATF)

ELECTRICAL DATAPROJECTED LUMEN MAINTENANCE

AMBIENT TEMPERATURE LUMEN MULTIPLIER0°C 32°F 1.0210°C 50°F 1.0120°C 68°F 1.0025°C 77°F 1.0030°C 86°F 1.0040°C 104°F 0.99

Use these factors to determine relative lumen output for average ambient temperatures from 0-40°C (32-104°F).

36‘

36‘

18‘

18‘

18‘18’

36‘

54‘

72‘

54‘

54‘

2fc

1fc

.5fc

5fc

5K(5000K nominal, 67 CRI)

# OF LEDS

DRIVE CURRENT

(MILLIAMPSSYSTEM WATTS

DISTRIBUTION TYPE NEMA

FIELD ANGLE Hˆ X V˚ LUMENS LPW

MAX BEAM CANDLEPOWER

28 1050mA 100W W 6 x 6 107˚ x 107˚ 8054 80.5 5508Lumen values are from photometric tests performed in accordance with IESNA LM-79-08. Data is considered to be representative of the configurations shown. Actual performance may differ as a result of end-user environment, application and inherent performance tolerances of the electrical components.

OPERATING HOURSAMBIENT

TEMP. 0 25,000 50,000

1TM-21-11 60,000 100,000

Calculated L70(HOURS)

25°C / 77°C 1.00 0.94 0.91 0.88 0.79 >149,000

40°C / 104°F 1.00 0.92 0.90 0.87 0.76 >132,000

# OF LEDSNUMBER OF

DRIVERSDRIVE CURRENT

(mA)INPUT VOLTAGE

(V)CURRENT (Amps)

SYSTEM POWER(W)

28 1 1050mA120 0.82 100277 0.36 100

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 1 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 1

I. General Contractor RFI Questions and Answers: General: 1. Questions: Please confirm the project is not Tax Exempt. The Proposal Form - 2 has it listed as being tax exempt.

Answer: Project is not Tax Exempt

2. Questions: Are we to include building permit costs? Answer: No, Owner applied for permit and will pay balance.

3. Questions: What is the process and outline for submission of questions related to these documents? Answer: Questions via email to Architect are acceptable.

4. Questions: What is substitution process for project? Answer: Refer to specifications 01 6000-2, Part 3 Execution, 3.01 Substitution Procedures. The intent is for “or equal” substations to be considered wherever possible. Please note that substitutions are accepted only during the bid period.

5. Questions: The Bid Form calls for the Radon System to be Allowance Item #3 . The Radon System detail shown on drawing P1.17 calls for the underground portion to be included in the Base Bid and the risers are to be included as Alternate #1. Please clarify. Answer: The base bid is to include the underground perforated piping (passive portion of the system). Once tested and Radon is evident the Alternate #3 is to include the vertical piping and venting (active system), if not, the underground pipes are to be capped. In addition to this Alternate #4 is a deduct Alternate to remove the Radon system completely (passive and active systems)

6. Questions: Unit Price #2 Carpet Tile: Which specified tile should this unit cost represent? Answer: CPT-10 Mannigton Commercial Style: BarkII, Color: Sumac 52075.

7. Questions: Unit #3 Exterior Wall Cultured Stone: Should this be a SF unit cost and not a LF unit cost as stated?

8. Answer: Correct, SF cost.

9. Questions: Are wall mounted TVs by the Owner?

Answer: Purchased and Installed By General Contractor, Basis of design Samsung LEDJ620D Series Smart TV – 50”.

10. Questions: The specifications contents do not match that listed in table of contents please review and revise.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 2 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 2

Answer: Specifications have been Modified and updated.

11. Questions: Proposal Form 0915 a. Question: Confirm bid date as May 11, 2016 2:00 PM and correct bid date on Bid Form.

Answer: That is correct.

b. Question: Provide value for Allowances One. Answer: Please provide your number for winter conditions.

c. Question: Provide value for Allowances Three. Answer: Allowance three will now be Alternate three and is to include the vertical piping and venting, if Radon is present.

d. Question: Will a spec section Allowance be provided. Answer: Allowances are addressed in the General Conditions Section 3.8.

e. Question: Please confirm Alternates are either Add or Deduct or provide a write up to outline each.

Answer: Updated on Proposal Form.

f. Question: Some listed items may overlap in subcontractor’s trade scopes can list be modified to suit this overlap? Answer: Yes but please identify any overlaps.

g. Is an Excel version of this sheet available or can we insert a contractor generated sheet for this effort? Answer: Yes,

h. Question: Provide detailed outline of preconstruction services implied in Bid Form Construction Schedule paragraph. Answer: Please refer to 01 3000 Administrative Requirements.

12. Questions: Will or equals be accepted for the product outlined in specs?

a. Question: 07 4633 Plastic Siding – Only lists Georgia Pacific.

Answer: Basis of design is Georgia Pacific, or equals accepted. The intent is for “or equal” substations to be considered wherever possible.

b. Question: 08 3513.23 Folding Fire Door – Only lists Won-Door.

Answer: No.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 3 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 3

c. Question: 08 5313 Vinyl Windows – Only lists Paradigm with applied exterior trims. Answer: Basis of design is Paradigm, or equals accepted. The intent is for “or equal” substations to be considered wherever possible.

d. Question: 11 3100 Residential Appliances – Varies on appliance type but only lists – Frigidaire, GE, Bosch

and LG. Answer: Manufacturer for each appliance is basis of design, or equals accepted. The intent is for “or equal” substations to be considered wherever possible.

e. Question: 14 2400 Hydraulic Elevator, only Otis listed. Answer: Basis of design is Otis Elevators, or equals accepted. The intent is for “or equal” substations to be considered wherever possible.

13. Questions: Are we to include builders risk insurance cost? Answer: Review General Conditions

14. Who provides site security and is there a spec outline for this? Answer: General Contractor, Refer to Spec Section 01500 Temporary Facilities and Controls

15. Questions: Are we to include performance and payment bond premium cost? Answer: Yes, separate line item on updated bid sheet.

16. Questions: Do finish specs part 1 and part 2 and finish cut sheets issued define and limit product to be used on this project? If so this should be cataloged and listed in the specification as content. Answer: No, some items prescriptive specifications and a few items are specified on the drawings.

17. Questions: In drawings we received two ID Building Finish Schedules prepared by Currier & Associates, 950_160415_BID SET_ID FINISH SPEC & SCHEDULES. Confirm we are to use to more recent issue of 04/15/2016 and disregard earlier issue. Answer: The 04/15/2016 ID Set is to be considered part of the contract documents.

18. Question: Do ID drawings in architectural set coordinate with the aforementioned separate schedule of materials? Answer: Yes.

19. Questions: Could a drawing list be provided in specification separate from drawings? Answer: list has been added to the specifications.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 4 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 4

20. Question: Could fire protection drawings (FP) have their own title and be separated from plumbing? Answer: Cover sheet has been modified to break out the Fire Protection Drawings.

21. Question: Previous estimate instructions directed the GC to handle the excess fill as loading trucks supplied by others. Should there be an add alternate listed on the bid form for hauling and disposing of the surplus material. Answer: The new plan is to have the General Contractors load and haul the dirt, at their expense and with their trucks to the Sharon North Site.

22. Question: The Bid form calls for the bid to sealed (assuming to be hand delivered). Will an electronic bid be acceptable with a hard copy to follow. Answer: Yes.

23. Question: Can the CSI Tabulation form be made available in Excel and the Subcontractors and Major Material Suppliers List in Word? Answer: Yes.

Civil: Questions: Trees are currently being removed from the site. What condition will the site be left? Will the GC be responsible for removing stumps? Is the erosion control barrier in place? Answer: Tree clearing has occurred on-site, trees have been cut, stumps remain. The contractor is responsible for removing stumps within the limit of work. Erosion control measures are in place; however the Contractor is responsible for removing and replacing any damaged erosion control measures, and is responsible for maintaining erosion control barriers throughout construction. Please refer to the plans and project specifications.

24. Questions: Drawing C-101 shows a sound enclosure wall around the generator. Is this required? If so, can a detail be provided?

Answer: Not required and has been removed from the drawings.

25. Questions: Specs for interior and exterior signage (including the 2 Whitney Place entrance signs listed on C-101) are not in the specifications. Are they Owner furnished and installed?

Answer:Furnished and installed by Contractor (see signage specifications. The interior signs are FF&E.

26. Questions: Is the demolition and abatement of the existing residential wood structures to be included in the bid?

Answer: Yes, please refer to updated specification section 024119 Selective Demolition

27. Questions: The 3000 lf of forced main to the treatment plant appears to be outside of the scope. Please confirm.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 5 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 5

Answer: Correct, responsibility is as indicated on Civil Utility Plan and specifications.

28. Question: Are protective bollards required around the generator and transformer?

Answer: There are only protective bollards required around the transformer as shown on the plan. The bollards will be positioned inside of the fence.

29. Questions: Has scope been further defined and outlined on plan for the following civil items: a. Question: 312319.10 Well Point System for Dewatering.

Answer: Contractor is responsible for performing the work in accordance with the Contract Documents. Specifications have been included should dewatering be necessary.

b. Question: 315000Excavation Support and Protection Answer: Contractor is responsible for executing the work in accordance with theContract Documents. Contractor shall furnish, install and maintain excavation support, as needed, to facilitate the work.

Architectural: 30. Questions: Can Spec Section 06100 – Rough Carpentry be made available?

Answer: Please refer to Structural Drawings. Questions: Is the roof insulation fully tapered or cricketed? Answer: Tapered

31. What is the minimum thickness and R-Valued required? Answer: 5”- R25

32. Questions: Note #12 on Drawing A1.3 indicates window shades to be selected by the Owner/Architect. Are these to be furnished and installed by the GC? If so, can a schedule be provided?

Answer: No, they are part of FFE.

33. Questions: Is the equipment in the Beauty and Barber Shops by the Owner?

Answer: Yes, by Owner.

34. Questions: Is weather barrier shown on drawing A5.21&A5.22 on sections 1 and 3 required?

Answer: Yes, additional layer of weather barrier is required under simulated stone product.

35. Questions: Specs for residential casework calls for Kraftmaid or Wellborn. What is the basis of design for each line?

Answer: Refer to ID Building Finish Specifications.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 6 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 6

36. Questions: Are interior doors in residential units a residential grade product? Provide corresponding specification. Answer: Intent is that the interior residential doors are pre-hung hollow core doors, basis of design - Masonite Doors.

37. Questions: Will in wall blocking be required for future HC modification in bathrooms or other location (drawing A0.6)

Answer: Yes

38. Question: Provide specification for ¾” gypsum underlayment detail 12 on drawing A0.7.

Answer: 03 5400 Self Leveling Underlayment Spec has been added to the specifications.

39. Question: Who provides Dining 1006 chandelier light shown in elevations on drawing A6.2 Answer: All light fixtures are to be purchased and installed by the General Contractor.

40. Question: Are stairs carriages wood or steel. Answer: Wood.

41. Question: Provide detailed or section that defines tread, riser and stringer construction. Answer: Please refer to sheet A6.22.

42. Question: Confirm special bullnose block is required at hollow metal door openings as shown in details 6 & 7 drawing A7.1. Answer: Yes.

43. Confirm windows will have wood extension jambs, and casing trims around four sides of openings per details on drawing A7.3. Answer: Correct.

Structural: 44. Questions: Drawing S0.10 detail #16 indicates optional heating ducts under the freezer slab. What system does this

connect to?

Answer: Optional heating duct not required

45. Questions: Please verify top of foundation wall grades on the foundation plans. There are many areas where the bottom of footing is called out to be (-4’/0” and -3/0”’). With the TOW called out to be Elevation 0’/0”, proper frost coverage will not be achieved. Please verify grading.

Answer: All perimeter footings to be -4’-8” with the exception of approximately two thirds of the west wing where the grade is at 263.0’ and where pipes cross the building perimeter. Refer to revised Structural Drawings

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 7 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 7

Questions: There are many interior continuous footings that are to be 3’ and 4’ below grade (WF-2, detail 2 on S0.10). Can these footings for interior bearing walls be raised to be just under the SOG? Answer: No. The interior footing depths were established from the inverts shown on the Plumbing drawings.

46. Question: Note 3f on drawing S0.00 indicates that Barrier One may be included in the design mix. Please confirm that we are to include Barrier One in the SOG mix for moisture mitigation. Answer: Yes, Barrier One is to be included.

47. Questions: Column and Post Footing Schedule on sheet S0.11 F3.0 is shown on the schedule as a 3’x3’x3’ - Should this be 3’x3’x1’. Answer: Yes. It will be revised to 3’x3’x1’

Mechanical: 48. Questions: Divisions 21, 22, and 23 are not included in the specifications. Please provide.

Answer: Divisions have been added to Specifications. Electrical: 49. Questions: The Subcontractors and Major Materials Suppliers List does not have the Electrical Sections listed. Are these

to be included? Answer: Yes, they will be included.

Kitchen Consultant Drawings: 50. Questions: Please confirm that all commercial kitchen equipment and commercial laundry equipment is furnished and

installed by others and that the GC is only responsible for the residential equipment.

Answer: GC is responsible to purchase and install all commercial equipment.

II. Specifications: 1. Cover Sheet

a. Added Addendum No. 1 Date 2. Updated Table of Contents

a. Added notes to refer to Structural Drawings for Concrete, Masonry, Metals and Wood Framing. b. Indicated AIA Documents are included by reference only, Physical copies are not included within the

Specifications. 3. 00 0915 Proposal Form

a. Added Addendum No. 1 Date b. Modified Allowances c. Modified Alternates

4. 02 4119 Selective Demolition a. 1.06 Project Conditions - updated to include abating, coordinating with Fire Department, and Demolition of Red

house.

Laraine
Highlight
Laraine
Highlight

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 8 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 8

5. 03 5400 Self Leveling Underlayment – Section added in its entirety 6. 06 1000 Rough Carpentry – Section added in its entirety 7. 06 6500 Simulated Wood Trim – Section added in its entirety 8. 08 4313 Aluminum Framed Storefront

a. Modified color to be selected by Architect from manufacturer's standard range. 9. 09 2116 Gypsum Board Assemblies.

a. Added note for Mold Resistance to be USG Sheetrock Brand – Mold Tough Panels or Equal. b. Added note that Mold Resistant board is required in all restrooms and wet areas.

10. 12 3530 Residential Casework a. Modified 2.01 A. to Read: Residential Casework: Basis of Design - Manufacturer - Kraftmaid. Refer to

Interior Design Book for styles and colors. 11. 09 6813 Tile Carpeting

a. Modified 2.01 A. to Read: Carpet Tile: As scheduled in Interior Design Book, 12. Division 21 – Fire Suppression – Division added in its entirety 13. Division 22 – Plumbing – Division added in its entirety 14. Division 23 – Heating, Ventilation, and Air Conditioning (HVAC) – Division added in its entirety

III. Drawings

CIVIL 1. Sheet C-101 Layout & Materials Plan

a. Removal of acoustic wall surrounding generator. Determination was made that the GC should not include the wall in the bid pricing.

b. Addition of Electric Vehicle Charging Station pedestal location and signage. c. Addition of two (2) bicycle racks along south face of building. d. Revised location of edge of reinforced concrete at receiving/dumpster location to meet corner of wall. e. Clarification callout added regarding 6’ on center control joint scoring pattern in sidewalks surrounding 1-

story portion of building. f. Callout added regarding wooden stockade fence along East property line to be field coordinated with

existing tree line. g. Addition of bollard locations at transformer.

2. Sheet C-201 Grading and Drainage Plan

a. Clarification on locations of inspection ports for underground systems.

3. Sheet C-301 Utilities Plan a. Clarification callout added for scope of work for sewer force main. Contractor to connect to sewer manhole

in Old Post Rd. b. Pipe type for force main called out as SDR21.

4. Sheet C-501 Photometrics Plan

a. Revised light locations along building columns, west and south side.

5. Sheet C-701 Construction Details a. Updated SC-740 Inspection Port Detail per manufacturer’s recommendation to 10” dia ports. Note added for

5 per system minimum.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 9 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 9

6. Sheet C-702 Construction Details a. Updated notes on Concrete Sidewalk detail to reflect 6’ on center scoring along 1-story portion of building.

7. Sheet C-704 Construction Details

a. Updated 5’ High Aluminum Fence without Decorative Insert detail note 3, “Color: Black”. b. Updated 42” High Aluminum Fence Decorative Fence Guardrail detail note 4, “Color: Black c. Added Transformer Pad Screening detail for transformer, trans cabinet, and meter enclosure. d. Added 5-Bike Capacity Bicycle Rack detail.

ARCHITECTURAL 8. Sheet C0.1

a. Revised drawing index

9. Sheet A0.3 a. Added walls types b. Revised Code Safety Legend

10. Sheet A0.4

a. Added walls types b. Revised Code Safety Legend

11. Sheet A0.5

a. Added walls types b. Revised Code Safety Legend

12. Sheet A0.7

a. Revised note on exterior wall type

13. Sheet A1.0 a. Revised notes on wall sections b. Revised notes on exterior stairs c. Revised notes on site plan

14. Sheet A1.1

a. Revised notes on guardrail section b. Revised notes on column elevation/section c. Added light and guardrail post details d. Revised notes on First Floor Overall Plan e. Added callout on First Floor Overall Plan

15. Sheet A1.2

a. Removed note from Floor Plan General Notes b. Revised trellis detail c. Revised note on Column @ Trellis d. Revised notes on First Floor Common

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 10 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 10

e. Added callouts on First Floor Common f. Revised sidewalk on First Floor Common g. Added note #12

16. Sheet A1.3 a. Removed note from Floor Plan General Notes b. Resolved graphic issue on First Floor West c. Added note #12

17. Sheet A1.4

a. Removed note from Floor Plan General Notes b. Added note #12

18. Sheet A1.5

a. Relocated room tag

19. Sheet A1.6 a. Removed note from Floor Plan General Notes b. Revised notes on Second Floor West c. Added note #12

20. Sheet A1.7

a. Removed note from Floor Plan General Notes b. Added note #12

21. Sheet A1.9

a. Removed note from Floor Plan General Notes b. Revised notes on Third Floor West c. Revised balcony guardrail d. Added note #12

22. Sheet A1.10

a. Removed note from Floor Plan General Notes b. Revised notes on 3rd Floor Plan c. Added note #12

23. Sheet A2.1

a. Added note to Ceiling Plan General Notes b. Added notes to Reflected Ceiling Plan Legend c. Added light fixtures to RCP First Floor Common d. Revised notes on RCP First Floor Common

24. Sheet A2.2

a. Added note to Ceiling Plan General Notes b. Revised note on Ceiling Plan General Notes c. Added notes to Reflected Ceiling Plan Legend

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 11 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 11

d. Revised notes on RCP First Floor West

25. Sheet A2.3 a. Added note to Ceiling Plan General Notes b. Revised note on Ceiling Plan General Notes c. Added notes to Reflected Ceiling Plan Legend

26. Sheet A2.4

a. Added note to Ceiling Plan General Notes b. Revised note on Ceiling Plan General Notes c. Added notes to Reflected Ceiling Plan Legend

27. Sheet A2.5

a. Added note to Ceiling Plan General Notes b. Revised note on Ceiling Plan General Notes c. Added notes to Reflected Ceiling Plan Legend

28. Sheet A2.6

a. Added note to Ceiling Plan General Notes b. Revised note on Ceiling Plan General Notes c. Added notes to Reflected Ceiling Plan Legend

29. Sheet A2.7

a. Added note to Ceiling Plan General Notes b. Revised note on Ceiling Plan General Notes c. Added notes to Reflected Ceiling Plan Legend d. Added elevator shaft vent

30. Sheet A2.8

a. Revised Balcony Soffit Detail

31. Sheet A3.1 a. Revised notes

32. Sheet A3.2

a. Revised notes on Roof Drain Detail

33. Sheet A4.2 a. Added light fixtures above doors b. Added dimensions to Elevations c. Added trim profile type

34. Sheet A4.3

a. Added light fixtures above doors b. Revised exterior elevations

35. Sheet A4.4

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 12 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 12

a. Added light fixtures above doors b. Added dimensions to Elevations c. Revised notes on North Elevation

36. Sheet A4.5

a. Added notes to Elevations b. Revised columns throughout c. Revised light fixtures throughout

37. Sheet A5.1

a. Added tapered rigid insulation throughout

38. Sheet A5.2 a. Added tapered rigid insulation throughout

39. Sheet A5.14

a. Revised notes on Wall Section b. Added Parging Mix

40. Sheet A5.21

a. Revised notes on roof details b. Revised notes on wall details c. Adjusted soffit on Low Roof Detail & Dormer Detail d. Adjusted stone veneer on Masonry Wall Detail e. Removed detail

41. Sheet A5.22

a. Revised notes on roof details b. Revised notes on wall details c. Adjusted stone veneer on Masonry Wall Detail d. Adjusted rigid insulation on Roof Detail @ Stair

42. Sheet A6.1

a. Removed note from Floor Plan General Notes b. Added notes to Restroom Notes c. Revised dimensions on Typical Mounting Heights d. Revised notes on kitchenette e. Revised window on Typ. Memory Care (MC) Studio f. Added wall types

43. Sheet A6.4

a. Revised reception desk plans, elevations and sections

44. Sheet A6.10 a. Revised elevations b. Added new elevations and section

45. Sheet A6.15

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 13 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 13

a. Revised elevation

46. Sheet A6.17 a. Revised notes on FEC Elevation b. Revised Balcony Handrail

47. Sheet A6.19

a. Added metal flashing on Cupola Elevation & Roof Ridge Detail

48. Sheet A6.20 a. Added notes to Restroom Notes b. Revised doors in ADA accessible stalls

49. Sheet A6.21

a. Revised Elevator Roof Det. b. Revised notes on Stair Section & Elevator Section c. Added callout for Detail 8/A6.22

50. Sheet A6.22

a. Added Guardrail Detail b. Added callout for Detail 8/A6.22 c. Revised note on Stair B Section

51. Sheet A6.23

a. Added callout for Detail 8/A6.22 b. Revised note on Stair C Section

52. Sheet A6.24 a. Revised roof stair section b. Revised guardrail sections

53. Sheet A7.1

a. Revised door and glazing notes

54. Sheet A7.2 a. Revised door and glazing notes

55. Sheet A7.3

a. Revised detail and glazing notes

STRUCTURAL 1. GENERAL

a. Added north arrow to plans. b. Clarified typical bottom of exterior footings to (-4’-8”). c. Clarified steel required in elevators on plans as necessary.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 14 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 14

2. Sheet S0.10 a. Revised details to provide corrected/additional information.

3. Sheet S0.11

a. Added pier schedule. b. Added and removed sections. c. Corrected/clarified schedules.

4. Sheet S0.12

a. Clarified/corrected sections. 5. Sheet S1.10

a. Added footing information b. Revised footing elevations c. Added section cuts. d. Revised pier and sidewalk details. e. Enhanced post details at covered walk. f. Revised post and footing details at retaining wall.

6. Sheet S1.11

a. Added/revised footing steps. b. Clarified footing elevations. c. Corrected section cuts.

7. Sheet S1.12 a. Added/revised footing steps. b. Clarified steel in elevators. c. Added piers at steel columns. d. Clarified footing information.

8. Sheet S2.10 a. Clarified covered walk framing. b. Added wind design information. c. Removed trellis/portico references.

9. Sheet S2.11

a. Clarified wood mansard framing. b. Revised porte cochere. c. Removed references to trellis as required. d. Added section cuts.

10. Sheet S2.12

a. Clarified wood beam sizes. b. Clarified steel column sizes. c. Corrected section cuts.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 15 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 15

11. Sheet S2.13 a. Clarified wood beam sizes. b. Clarified wood post sizes. c. Corrected/added section cuts. d. Enhanced plan notes and legend.

12. Sheet S3.10

a. Clarified wood beam sizes. b. Clarified shear wall designations. c. Enhanced steel column information.

13. Sheet S3.11

a. Clarified wood post sizes.

14. Sheet S4.10 a. Added wind design information. b. Clarified bearing wall locations. c. Clarified linework on plan.

15. Sheet S4.11

a. Added wind design information. b. Clarified linework on plan.

16. Sheet S5.10

a. Revised column bases and footing elevations at covered walk. b. Revised fastener details. c. Clarified steel truss information.

17. Sheet S5.11

a. Revised handrail sections per new information. b. Removed trellis information. c. Clarified sections.

ELECTRICAL 56. Sheet E0.10

a. Added car charging station specification, location and circuiting to electrical site plan, keyed note #11.

57. Sheet E1.10 a. Relocated type ‘OE’ fixture on exterior column at South elevation b. Added exterior emergency egress lighting to main entry door and café door.

58.

59. Sheet E1.11 through E1.16 a. Added general note #6 to refer to unit plans for lighting within units. b. Added exterior emergency egress light to courtyard door on sheet E1.11.

Whitney Place Project No. 1413 Assisted Living Residences April 27, 2016 Sharon, Massachusetts Dario Designs Inc. 4/15/16 Bid Set - Addendum 1 Page 16 The Bidders are hereby informed that the Bid Documents dated April 15, 2016 for the referenced project are hereby modified, changed and/or supplemented as specified, described and set forth in this addendum. Receipt of this addendum shall be noted on the Proposal Form and any associated costs shall be included in the Bid. Upon its issue, the addendum shall become part of the contract documents.

Dario Designs Inc. 318 Main Street, Suite 210 Whitney Place Assisted Living Residences, Sharon MA Northborough, MA 01532 Project Number 1413 T: (508) 877-4444 F: (508) 877-4474 Addendum No. 1 – PAGE 16

60. Sheet E4.10

a. Added general note #8 to refer to sheet E5.11 for light fixture schedule.

61. Sheet E5.11 a. Added wall sconce light fixture, type ‘OG’ at café doors, fixture specification TBD. b. Added chandelier fixture at main entry doors, type ‘OH’, fixture specification TBD.

62. Sheet E5.16

a. Added two 40A/2P breakers for car charging station to panel PA circuits 36, 38 and 40, 42.