continued process verification (cpv) automation perkin ......continued process verification (cpv)...
TRANSCRIPT
Continued Process Verification (CPV)
Automation
Perkin Elmer 2016
Data Analytics & R&D Informatics User Conference
Willy RIBUS Nov-3th 2016
2 Agenda
1. Lifecycle Process Validation Model
2. Continued Process Verification Program
i. Multi generation Plan
ii. Current status
iii. CPV Automation Phase 1
3. CPV Automation Phase 1 Demo session
4. Next steps
5. Q & A
4
1. Lifecycle Process Validation Model
2. Continued Process Verification Program
i. Multi generation Plan
ii. Current status
iii. CPV Automation Phase 1
3. CPV Automation Phase 1 Demo session
4. Next steps
5. Q & A
Agenda
6
LIMS Data
Legend:
Manual process
Automated process
Analytical data
Process data
Reporting
Data
Collection
Data
analysis
Data
Collection
Ref data
collection
Reference Data
Paper batch
records
Specs,
Control limits …
CPV Automation Phase 1 - Starting point
Reporting
Data
Collection
Data
analysis
Phase1 - Tibco-Spotfire User interface
LIMS Data
ENTERPRISE DATA WAREHOUSE
Statistical Analysis
Template SM
Template LM
Template FF
Analytical
data
Analytical &
Process
data
Data
Collection
Phase 1 - Manual Data Entry Module
Process
data Paper batch
records
Phase 1- Reference Data module
Ref data
Maintenance
Oracle DB
Reference data
CPV Automation Phase 1 - Modules 7
5. Data
analysis &
Reporting
4. Data Load
3. Product, Period, Attribute
& Parameter selection
1. Workflow Selection
2. Open existing CPV analysis
Start
NEW RESUME RENEW VIEW
Product selection
Attribute / Parameter selection
Period selection
Identify Batch qty per
selected parameter
• Generate temporary CPV report • Review temporary CPV Report • Generate final CPV report
Select & Open existing
CPV analysis
Batch quantity
OK?
Period Extension
CLONE
Load data for each selected parameter
Data analysis
Yes
No
Visual inspection
Distribution plot
Yes
Highly Non Normal Distr.?
Consult statistician
No
• Investigate control charts • Exclude data points • Insert comments on alerts
Reporting
Select & Open existing
CPV analysis
Reference data Management
• Link to module to maintain reference data
CPV Limits & Ppk indexes
• Calc. current CPV limits and Ppk • Comparison with fixed CPV limits
/ Ppk indexes
Executive Summary
• Insert references to investigations • Define if actions required
Data Export • Data export capability for non-
CPV applications
CPV Automation Phase 1 - Process Flow 8
Login
• Single sign-on
• Define users’ roles
Data
access
• EDW (Teradata)
• Ora DB
Selection process
• Workflow selection
• Parameters selection
• Period selection
Automated
analysis
• Statistical analysis
• Automatic generation of visualizations, feeding Persistence Layer
User
Interface
• Interactivity
• HTML custom panels
• Showing / Hiding Visualizations
Persistence
Layer
• Store metadata
• Store visualizations
Report
Generation
• Use data from Persistence Layer
• Use Report Templates
CPV Automation Phase 1 – Components
Re-use
analysis
• Re-use of analysis supported by different work flows
• Retrieval meta data from persistence layer
9
1. Lifecycle Process Validation Model
2. Continued Process Verification Program
i. Multi generation Plan
ii. Current status
iii. CPV Automation Phase 1
3. CPV Automation Phase 1 Demo session
4. Next steps
5. Q & A
Agenda 10
CPV Automation Phase 1 – Demo session
5. Data
analysis &
Reporting
4. Data Load
3. Product, Period, Attribute
& Parameter selection
1. Workflow Selection
2. Open existing CPV analysis
Start
NEW RESUME RENEW VIEW
Product selection
Attribute / Parameter selection
Period selection
Identify Batch qty per
selected parameter
• Generate temporary CPV report • Review temporary CPV Report • Generate final CPV report
Select & Open existing
CPV analysis
Batch quantity
OK?
Period Extension
CLONE
Load data for each selected parameter
Data analysis
Yes
No
Visual inspection
Distribution plot
Yes
Highly Non Normal Distr.?
Consult statistician
No
• Investigate control charts • Exclude data points • Insert comments on alerts
Reporting
Select & Open existing
CPV analysis
Reference data Management
• Link to module to maintain reference data
CPV Limits & Ppk indexes
• Calc. current CPV limits and Ppk • Comparison with fixed CPV limits
/ Ppk indexes
Executive Summary
• Insert references to investigations • Define if actions required
Data Export • Data export capability for non-
CPV applications
11
1. Lifecycle Process Validation Model
2. Continued Process Verification Program
i. Multi generation Plan
ii. Current status
iii. CPV Automation Phase 1
3. CPV Automation Phase 1 Demo session
4. Next steps
5. Q & A
Agenda 12
CPV automation - Next steps
1. CPV Automation Phase 2
Auto retrieval of Process data for integration within CPV analysis
2. CPV Automation Fine tune cycle
Improve and Extend current CPV automation functionality
13
14
Data
analysis
Phase1 - Tibco-Spotfire User interface
LIMS Data
ENTERPRISE DATA WAREHOUSE
Statistical Analysis
Template SM
Template LM
Template FF
Analytical
data
Analytical &
Process
data
Data
Collection
Phase 1 - Manual Data Entry Module
Process
data Paper batch
records
Phase 1- Reference Data module
Ref data
Maintenance
Oracle DB
Reference data
CPV Automation Phase 2
Phase 2 - PI Integrator
Global PI AF-EF
PI Historian
Automation
Level 1&2
PI integrator for business analytics
Interface
15
Improve and Extend current CPV automation functionality based on
• User feedback during received during 1st usage of application
• Add additional functionality not covered during phase 1 (Park lot)
• Anticipate on new business requirements as specified in ongoing update of
global SOP / WI
CPV Automation Fine tune cycle