Rio Canoas Energia – Works Status
2
Rio Canoas Energia – Garibaldi HPP
CANAIS QUE CONTROLAM A VAZÃO DA ÁGUA.
3
Beginning of tunnel
excavation in MAY 2012
Rio Canoas Energia – May 2012
4
Rio Canoas Energia – December 2012
Conclusion of tunnel
excavation in DECEMBER 2012
5
Rio Canoas Energia – Works Status
6
Rio Canoas Energia – Works Status
7
Rio Canoas Energia - Concession
Garibaldi HPP (SC)
Installed capacity –192 MW;
Current assured energy – 83.1 MWh;
70% of energy sold in ANEEL auction;
Bid in July 2010;
Location – Abdon Batista (SC) and Cerro Negro (SC)
Concession period: 35 years
Capex of R$565 million through September 2012