SAPPHIRE RESIDENCESPROJECT PROGRESS REPORT

SEPTEMBER 2019

[email protected]

WWW.BLUEWATERLAGOS.COM

+234 (0) 908 543 2100+234 (0) 908 543 2101

FACEBOOK: bluewaterlagos INSTAGRAM: bluewaterlagos TWITTER: @bluewaterlagos LINKEDIN: @bluewaterlagos

Page 2: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

PROJECT PROGRESS UPDATE

THE PROJECT IS ON SCHEDULE WITH OCCUPATIONDUE JANUARY 2020.

1. Foundation – Grade Slab at 98%2. Shell & Core – Lift Shafts & Floor Slab at 100%3. Block Work – 100% up to 18th Floor4. External Plastering – 90% up to 18th Floor5. Internal Plastering – 90% up to 15th Floor6. MEP – 80% up to 12th Floor7. Floor Tiling – 90% up to 15th Floor8. Painting – 25% up to 14th Floor

Page 3: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

LAGOS BUSINESS SCHOOL AND LAGOS STATE MINISTRY OF WATERFRONT INFRASTRUCTURE, BLUE WATER SITE VISIT

Page 4: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

COMPLETION OF BASEMENT COVER CASTING

Page 5: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

SANITARY FITTINGS INSTALLATION

Page 6: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

CASTING: BASEMENT GRADE SLAB AND DRAINAGE

Page 7: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

ERECTION OF PLANTERS IN RECREATIONAL PARK AREA

Page 8: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

TENNIS COURT PREPARATION BASEMENT STAIRCASE COVER

Page 9: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

INTERIOR FLOOR TILING MEP INSTALLATIONS IN MEP SERVICE SHAFTS

Page 10: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

ERECTION OF MAIN ENTRANCE STAIRCASE

ERECTION OF PERIMETER FENCE

ERECTION OF ENTRANCE RAMP FROM THE MAIN GATE

Page 11: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019

TEN

TENLIVING

THE ULTIMATE LIFESTYLE COMMUNITYContemporary Luxury ApartmentsTop Brand Shopping & Leisure MallExclusive Resident ’s Park

EXCELLENT LOCATION:Lekki Phase 1, 2nd Roundabout, Lekki Epe Expressway, Off Remi Olowude Street towards the Atlantic Coast

NOW SELLING SAPPHIRE RESIDENCES:1, 2 & 3 Bedroom Luxury Apartments available for initial deposit as low as N8.3m Additional parking available for purchase

THE ULTIMATE LIFESTYLE DESTINATION:Restaurants, shopping, entertainment and leisure facilities conveniently located within walking distance of your home

WATERFRONT LIVING:Experience beautiful views of the sea, and soothing breeze

APARTMENT FEATURESLuxury Kitchens and Bathrooms Fantastic Sea ViewsSecure & Ventilated Underground Parking Gymnasium & Club HouseSwimming Pool & Terrace Guaranteed Electrical & Water Supply Satellite TV& Internet ServicesOn Site Facility Manager

EASY PAYMENT PLANS:20% Down Payment with subsequent balance paid in quarterly instalments over the construction period by December

PRICE FROM:1 BEDROOM – STARTING AT N42.2m2 BEDROOM – STARTING AT N61.7m3 BEDROOM – STARTING AT N85.1m

DELIVERY:Available for occupation – January 2020

DEVELOPERS:ELALAN GROUP ‐ Developers of luxury builds such as No. 4 Bourdillon, Tango Towers, Olympic Towers, Crest View Towers and Elias Towers

AFRICAN CAPITAL ALLIANCE (ACA) ‐Leading pan‐African investment firm sponsoring funds and managing investments of over $1billion

OVER

Page 12: CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi€¦ · Microsoft PowerPoint - CONSTRUCTION PROGRESS REPORT - AUGUST 2019 - Bunmi Author: ELALAN-BUNMIPC Created Date: 11/1/2019