construction of a natural turf pitch and muga pitch phase 2 - case study

5
O’Brien Contractors Limited – Case Study www. obriencontractors.co.uk | Tel: 01926 423 918

Upload: obriencontractorsltd

Post on 13-Aug-2015

301 views

Category:

Business


3 download

TRANSCRIPT

O’Brien Contractors Limited – Case Study

www. obriencontractors.co.uk | Tel: 01926 423 918

www. obriencontractors.co.uk | Tel: 01926 423 918

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Project Profile:

Shaylor Strategic Alliance Phase 2 Case Study

O’Brien is confident to say, using its wealth of knowledge it is able to target each and every new contract with a smart approach, offering clients the best in quality and construction knowledge.

Client: Shaylor Strategic Alliance Project: HMP Featherstone Phase 2 Natural Turf & MUGA Pitches Location: Wolverhampton Value: £415K Contract Duration: 12 Weeks

www. obriencontractors.co.uk | Tel: 01926 423 918

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

About the Project:

Work carried out by O’Brien

Construction of a natural turf pitch and MUGA pitch.

Phase 2 involved the construction of the two new pitches:

MUGA PitchThe project involved the design and build of a 5 a-side sports pitch. The work included site clearance and reduced level dig with cut and fill. The underside of the playing surface was a “Finn” underground drainage system and free draining sub-base granular fill. The playing surface used was “Playrite Matchwinner” synthetic sports surface with shockpad, surrounded by a 3m high welded mesh fence.

Natural Turf Pitch The project involved the build of a natural turf rugby/football field. The underside of the natural pitch was made up from a number of layers which were supported by the lime stabilized formation in order to create the most level playing surface. The pitch consisted of a 125mm drainage layer of Viridor recycled glass and 175mm Rootzone 80/20 supplied by Tarmac Topsport. The “Sports Greenscape” turf was then laid to complete the natural turf pitch.

www. obriencontractors.co.uk | Tel: 01926 423 918

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Core Operations:

“O’Brien – Delivering a Smart Approach to Construction”

O’Brien Group offers expert teams across a diverse range of services. All five construction led services, Design and Build, Construction, Sports Pitches, Earthworks, Laser Levelling and Plant Hire operate highly skilled teams who aim to provide the best in construction knowledge and a smart approach to every aspect of our works.

• Bulk earthworks and site clearance• Ground stabilization• Reinforced concrete works including foundations, floors, retaining walls and external service yards• Roads and sewers• Drainage, pipework and associated works• External works including block paving and slabbing• Parking areas• Earthworks’ design and ground modelling facilities• Fine tolerance Laser Levelling and 3D machine control system

O'Brien Contractors Ltd Manor CottageChurch LaneLeamington SpaCV32 7JT