Construction Management Trainingby
Building Site Simulation
B. de Vries, S. Verhagen,
A.J Jessurun
What is the BMSC
• Training Center
• Construction Management
• User Interaction
• Full Scale Model
BMSC
Construction Management Changes
• More emphasis on planning instead of controlling
• More pre-active instead of re-active construction management
Construction Management Training
• Not adequate for the new type of construction manager
• On the building site
• Dependent on the project and on the trainer
• Difficult to measure acquired knowledge and expertise
BMSC system architecture
CourseSystem
Building siteSimulation
Course System:Project data
Project
ScoreRule
ExercisesTransition
TypeActivity
Transitions
• Transition types (7) : Project independent• Activities (100) : Project dependent• If All(Activity) = Fulfilled then
Transition = OK• If Activity(i) = Fulfilled then
Activity(j,k,..)=OK• Scores : Ranges
Course System:Trainee data
ScoreRule
Trainee SessionLog
Record
System Requirements
• Minimal data entry effort
• Maximal data reliability
• Maximal data accuracy
• Minimal trainer’s interference
BMSC course system
• Building site
• Site office
• Control room
BMSC floor plan
User interaction
• Communication console (PC)
• VR model on parabolic screen
• Actors: role play of truck driver, etc.
Student interface
Teacher interface
• Log record of trainees’ actions
• Scenario for actors
• Television monitors
Training evaluation
• Building as ‘would have been’• Transition types > Activities• Evaluation aspects: Time, Cost,
Quality, Organization, Information > Scores
• Construction knowledge > Expert• Management knowledge > Expert
First Experiences
Pro• High level of
realism• Intense courses• Toolkit is very
generic
Con• Communication
console in no substitute for phone
• Unforeseen actions are missing
Pictures & Panorama
To Conclude