    Construction Documents

    Review Questions

  • 8/12/2019 Construction Documents Review Ver010712

    2/38

    1. The procurement (bidding) requi rements are

    a. a part of the construction documents, butnot the contract documents.

    b. a part of the project manual.c. a part of the construction documents but

    not the project manual.d. in the same part as the contract

    modifications.

  • 8/12/2019 Construction Documents Review Ver010712

    3/38

    1. The bidding requi rements are

    a. a part of the construction documents, butnot the contract documents.

    b. a part of the project manual.c. a part of the construction documents but

    not the project manual.d. in the same part as the contract

    modifications.

  • 8/12/2019 Construction Documents Review Ver010712

    4/38

    2. Procurement (Bidding) documents are

    a. Legally enforceable requirements which become part of the signed contract.

    b. Include all of the construction documents exceptthe bidding requirements.c. Defined as all the construction documents issued

    to bidders before the signing of an owner-

    contract agreement.d. Only the documents bound in a three ringnotebook.

  • 8/12/2019 Construction Documents Review Ver010712

    5/38

    2. Bidding documents are

    a. Legally enforceable requirements which become part of the signed contract.

    b. Include all of the construction documents exceptthe bidding requirements.c. Defined as all the construction documents issued

    to bidders before the signing of an owner-

    contract agreement.d. Only the documents bound in a three ringnotebook.

  • 8/12/2019 Construction Documents Review Ver010712

    6/38

    3. EJCDC 1910-16 is a document whi ch

    a. Is also called A521 by the AIA. b. Is used to coordinate between construction

    documents.c. Suggests the primary location for specific

    information in the constructiondocuments.

    d. All of the above

  • 8/12/2019 Construction Documents Review Ver010712

    7/38

  • 8/12/2019 Construction Documents Review Ver010712

    8/38

    4. The Procurement (Bidding) Requi rementsinclude

    a. The invitation to bid, bid forms, and theagreement.

    b. The instruction to bidders, the invitation to bid and the bid form.c. The information to bidders, the payment

    bond and the bid security forms.d. The bid security forms, the information to

    sub-contractors and the agreement.

  • 8/12/2019 Construction Documents Review Ver010712

    9/38

    4. The Bidding Requi rements include

    a. The invitation to bid, bid forms, and theagreement.

    b. The instruction to bidders, the invitation to bid and the bid form.c. The information to bidders, the payment

    bond and the bid security forms.d. The bid security forms, the information to

    sub-contractors and the agreement.

  • 8/12/2019 Construction Documents Review Ver010712

    10/38

    5. The Contr act Documents include

    a. The contract forms, the bid forms, thespecifications and addenda.

    b. The drawings, the specifications and theinformation to bidders.

    c. The conditions of the contract, the drawingsand specifications.

    d. Everything except the contract modifications.

  • 8/12/2019 Construction Documents Review Ver010712

    11/38

    5. The Contr act Documents include

    a. The contract forms, the bid forms, thespecifications and addenda.

    b. The drawings, the specifications and theinformation to bidders.

    c. The conditions of the contract, the drawingsand specifications

    d. Everything except the contract modifications.

  • 8/12/2019 Construction Documents Review Ver010712

    12/38

  • 8/12/2019 Construction Documents Review Ver010712

    13/38

    6. The Contract F orms include

    a. The agreement. b. The performance and payment bonds.c. The certificates.d. All of the above.

  • 8/12/2019 Construction Documents Review Ver010712

    14/38

    7. The Conditions of the Contract include

    a. The General Conditions. b. The Supplementary Conditions.c. The Conditions to the Bidders.d. All of the above.

    e. A and B only.

  • 8/12/2019 Construction Documents Review Ver010712

    15/38

  • 8/12/2019 Construction Documents Review Ver010712

    16/38

    8. Addenda are

    a. Changes to the contract documents beforethe agreement is signed.

    b. Changes to the contract documents at anytime.

    c. Changes to the contract documents afterthe agreement is signed.

    d. None of the above.

  • 8/12/2019 Construction Documents Review Ver010712

    17/38

    8. Addenda are

    a. Changes to the contract documents beforethe agreement is signed.

    b. Changes to the contract documents at anytime.

    c. Changes to the contract documents afterthe agreement is signed.

    d. None of the above.

  • 8/12/2019 Construction Documents Review Ver010712

    18/38

    9. The Project M anual Concept

    a. Was originated by CSI to replace thetitle specifications.

    b. Provides an organizational format andstandard location for all documentsinvolved.

    c. Includes only the specifications in the bound manual.d. Uses the UniFormat system.

  • 8/12/2019 Construction Documents Review Ver010712

    19/38

    9. The Project M anual Concept

    a. Was originated by CSI to replace thetitle specifications.

    b. Provides an organizational format andstandard location for all documentsinvolved.

    c. Includes only the specifications in the bound manual.

    d. Uses the UniFormat system.

  • 8/12/2019 Construction Documents Review Ver010712

    20/38

    10. What are the three components of projectdesign team coordination?

    a. Duplication, omissions and discrepancies. b. Division One, Division Two, and Division

    Three.c. General, Products and Execution.d. Organization, Execution and Quality

    Assurance.

  • 8/12/2019 Construction Documents Review Ver010712

    21/38

    10. What are the three components of projectdesign team coordination?

    a. Duplication, omissions and discrepancies. b. Division One, Division Two, and Division

    Three.c. General, Products and Execution.d. Organization, Execution and Quality

    Assurance.

  • 8/12/2019 Construction Documents Review Ver010712

    22/38

    11. The general clauses that establ ish how theproject is to be administered are known as:

    a. Conditions of the Contract. b. General Conditions.c. Supplementary Conditions.d. Addenda.

  • 8/12/2019 Construction Documents Review Ver010712

    23/38

    11. The general clauses that establ ish how theproject is to be administered are known as:

    a. Conditions of the Contract. b. General Conditions.c. Supplementary Conditions.d. Addenda.

  • 8/12/2019 Construction Documents Review Ver010712

    24/38

    12. On most projects, all of the following

    are pr incipal enti ties EXCEPT:a. Contractor.

    b. Ownerc. Electrical Consultantd. Architect/Engineer

  • 8/12/2019 Construction Documents Review Ver010712

    25/38

    12. On most projects, all of the followingare pr incipal enti ties EXCEPT:

    a. Contractor. b. ownerc. Electrical Consultantd. Architect/Engineer

  • 8/12/2019 Construction Documents Review Ver010712

    26/38

    13. F or engineer ing projects, an Archi tect servesas a consultant to the Engineer :

    a. Never. b. Sometimes.c. Always.d. Partially.

  • 8/12/2019 Construction Documents Review Ver010712

    27/38

  • 8/12/2019 Construction Documents Review Ver010712

    28/38

  • 8/12/2019 Construction Documents Review Ver010712

    29/38

    14. In 1964, the term Project Manual wasintroduced by the:

    a. American Bar Association b. American Institute of Architectsc. Construction Specifications Instituted. Department of Defense

  • 8/12/2019 Construction Documents Review Ver010712

    30/38

    15. As part of the __________, the Agreement isconsidered a Contract Document:

    a. Contract Conditions b. Contract Formsc. Bidding Requirementsd. Specifications

  • 8/12/2019 Construction Documents Review Ver010712

    31/38

    15. As part of the __________, the Agreement isconsidered a Contract Document:

    a. Contract Conditions b. Contract Formsc. Bidding Requirementsd. Specifications

  • 8/12/2019 Construction Documents Review Ver010712

    32/38

    16. The Procurement (Bidding) Documentsinclude al l of the fol lowing EXCEPT:

    a. Procurement (Bidding) Requirements b. Contract Modificationsc. Project Manuald. Drawingse. Addenda

  • 8/12/2019 Construction Documents Review Ver010712

    33/38

  • 8/12/2019 Construction Documents Review Ver010712

    34/38

  • 8/12/2019 Construction Documents Review Ver010712

    35/38

    17. Project specifications shoul d be directed towhich of the following:

    a. The Owner. b. The Contractor.c. Contractors, Subcontractors and material

    suppliers.d. The Owners legal counsel

  • 8/12/2019 Construction Documents Review Ver010712

    36/38

    18. The term Contract Documents typicallyincludes:

    a. Contract Forms. b. Drawings.c. Specifications.d. All of the above.

  • 8/12/2019 Construction Documents Review Ver010712

    37/38

    18. The term Contract Documents typicallyincludes:

    a. Contract Forms. b. Drawings.c. Specifications.d. All of the above.

  • 8/12/2019 Construction Documents Review Ver010712

    38/38

    Answers

    1. a 2. c 3. c

    4. b 5. c 6. d 7. e 8. a 9. b

    10. d 11. b 12. c

    13. b 14. b 15. b 16. b 17. b 18. d