CONSTRUCTION DOCUMENTS

STUDENT: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204 MATERIALS AND COLOR

FALL 2012

THE LAFAYETTE HOTEL

391 WASHINGTON STREET, BUFFALO, NEW YORK, 14203

GENERAL NOTES:1. WE CERTIFY TO THE BEST OF OUR KNOWLEDGE, INFORMATION AND BELIEF THAT THE DESIGN OF THIS PROJECT COM-PLIES WITH THE APPLICABLE PROVISIONS OF THE REQUIREMENTS.2 ALL EXITS ARE TO BE OPERATED FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE.3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS FOR SIZE, LOCATION, AND COMPATIBILITY WITH PROPOSED NEW CONSTRUCTION. IN CASE OF DISCREPANCY, THE ARCHITECT SHOULD BE NOTI-FIED IMMEDIATELY.4. UPON COMPLETION OF THE PROJECT, THE REGISTERED ARCHITECT/ ENGINEER SHALL CERTIFY IN WRITING THAT TO THE BEST OF HIS KNOWLEDGE, THE BUILDING OR STRUCTURE HAS BEEN COMPLETED IN ACCORDANCE WITH THE DESIGN AND APPLICABLE CODES, OR HE WILL SIGN AN AIA CERTIFICATE OF SUBSTANTIAL COMPLETION, FORM G-704.5. THE CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES AS ESTABLISHED BY THE ERIE COUNTY.6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL TRADES AND METHODS OF CONSTRUCTION AS REQUIRED FOR COMPLETION OF THIS PROJECT IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS.7. EACH SUB CONTRACTOR IS TO VERIFY ALL EXISTING CONDITIONS AT THE SITE AND BE RESPONSIBLE FOR PROTECT-ING AND/OR REMOVING AND REPLACING EXISTING SITE IMPROVEMENTS AS REQUIRED TO PERFORM THE INTENDED WORK.8. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF ALL UTILITIES PRIOR TO EXCAVATION. THE CONTRACTOR SHALL CAP ALL ABANDONED UTILITIES AND SHALL REPLACE ALL ACTIVE UTILITIES THAT ARE DAMAGED.9. ALL REMOVED MATERIALS AND ALL CONSTRUCTION DEBRIS SHALL BE LEGALLY DISPOSED OF BY THE CONTRACTOR. KEEP AREA BRROM CLEAN.10. AREAS AND ITEMS TO REMAIN THAT ARE DISTURBED/DAMAGED DURING CONSTRUCTION SHALL BE RESTORED TO MATCH ADAJACENT MATERIALS WHETHER OR NOT SPECIFICALLY INDICATED ON THE DOCUMENTS.11. DIMENSIONS SHOWN ON THE DRAWINGS ARE TAKEN FROM THE PROPERTY LINE, THE FACE OF STREET CURBS, THE CENTERLINE OF COLUMNS, AND THE FACE OF CONCRETE, MASONRY, OR STUDS UNLESS OTHERWISE NOTED ON THE DRAWINGS.

CODE STUDY-CLASSIFICATION ASSEMBLY- OCCUPANCY A2TOTAL GROSS AREA 3,357 SFALLOWABLE AREA PER OCCUPANT 11 GROSSMAX TRAVEL DISTANCE 200’MAX TRAVEL DISTANCE PROVIDED 168’MIN. DOOR WIDTH 42”MIN. DOOR WIDTH PROVIDED 60”NO. OF LAVATORIES REQUIRED 2NO. OF LAVATORIES PROVIDED 4NO. OF WC’ REQUIRED 4NO. OF WC’ PROVIDED 6

TABLE OF CONTENTS:TITLE SHEET TI.0CODE STUDY ID1.0GROUND FLOOR PLAN ID2.0TAP ROOM DEMOLITION PLAN ID2.1TAP ROOM FLOOR PLAN ID2.2TAP ROOM REFLECTED CEILING PLAN ID2.3SECTIONS ID4.0WALL TYPES ID5.0DOOR SCHEDULE ID6.0INTERIOR ELEVATIONS ID7.0

TAP ROOM FLOOR PLANNOT TO SCALE

N

154

15442

42

84

84

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

TITLE SHEET

SHEET: T1.0

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

GROUNDFLOOR PLAN

SHEET: ID2.0

GENERAL NOTES:1. CONTRACTOR IS RESPONSIBLE FOR SECTIONING OFF TAP ROOM FROM REST OF BUILDING DURING AND BEFORE CONSTRUCTION.2. FOR DEMOLITION PLAN OF SCOPE OF WORK SEE SHEET ID2.1.

1 2 3

16’-10” 21’-6” 17’-7”

4 5 613’-0” 19’-10” 17’-8”

7 812’-10” 29’-4”

9 10

18’-11” 20’-4”

11 12 13 14 1516’-0” 19’-2” 22’-8” 18’-6”

A

24’-1

1”

B

C

D

18’-0

”15

’-4”

E

F

G

15’-0

”15

’-3”

15’-3

”22

’-11”

20’-0

H

I

GROUND FLOOR PLANSCALE = 1/16”=1’-0”

N

CRYSTAL DINING ROOM KITCHEN

AUTO CLUB (ANNEX)

BALLROOM

FOYER

PEACOCK ALLEY

COAT CHECK

CRYSTAL DINING ROOM

DUTCH GRILL

MAIN LOBBY LOUNGE

FLORIST

TUX SHOP

MAIN LOBBY

COFFEE SHOP

LAFAYETTE TAP ROOM

1

KEY NOTES:1. LAFAYETTE TAP ROOM IN SCOPE OF WORK, SEE SHEET ID2.2 FOR DETAILS.

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

TAP ROOM DEMOLITION PLAN

SHEET: ID2.1

KEY NOTES:1. WALLS AND DOORS TO BE DEMOLISHED.2. WALLS TO BE BUILT TO CLOSE-OUT GAP FOR DEMOLISHED DOOR.3. WALLS TO BE DEMOLISHED TO ACCOMMODATE FOR NEW DOUBLE DOOR. REFER SHEETS.4. NEW DOUBLE DOOR ADDED. REFER SHEETS.5. SALAVAGE ALL DOORS, WINDOWS AND HARDWARE.

8 9 10 11 12 13 14 15

A

B

1

1

1

5

4 5

2

2

543

4

11

1

51

2

29’-4” 18’-11” 20’-4” 16’-0” 19’-2” 22’-8” 18’-6”

24’-1

1”

TAP ROOM DEMOLITION PLANSCALE = 1/8”=1’-0”

N

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

TAP ROOMFLOOR PLAN

SHEET: ID2.2

KEY NOTES:1. 1’-6” CHASE WALL, SEE PLUMBING DRAWINGS FOR DETAIL.2. FOR WALL TYPES, SEE SHEET ID5.03. TILE FLOORING, FOR DETAILS SEE FFE PACKET.4. TERAZZO FLOORING, FOR DETAILS SEE FFE PACKET

1

3

4 2

GENERAL NOTES:1. FURNITURE FOR REFERENCE ONLY2. FOR RESTROOM DETAILS, SEE SHEET 7.0 AND MILLWORK DRAWINGS.

TAP ROOM FLOOR PLAN SCALE = 1/8”=1’-0”

N

TAP ROOM REFLECTED CEILING PLANSCALE = 1/8” = 1’-0”

N

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

TAP ROOM REFLECTED CEILING

PLAN

SHEET: ID2.3

GENERAL NOTES:1. ALL DIMENSIONS ARE CENTER-LIN UNLESS OTHERWISE SPECIFIED.2. LOCATIONS OF ALL CEILING ACCESS PANELS TO BE APROVED BY DESIGNER PRIOR TO ROUGH-IN.3. SEE FIXTURE LEGEND FOR PENDANT MOUNTING HEIGHT.4. CEILING GRIDS ARE CENTERED IN UNLESS OTHERWISE SPECIFIED.

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

TAP ROOM SECTIONS

SHEET: ID4.0

14’-0

”14

’-0”

17’-0

2’-0

”3’

-6”

9’-0

”5’

-6”

1’-0”

2’-0

1’-0”

2’-0

”1

FOR DETAILS SEE SHEET ID70.

SECTION 1SCALE = 1/8”=1’-0”

SECTION 2SCALE = 1/8”=1’-0”

SECTION 3SCALE = 1/8”=1’-0”

2

KEY NOTES:1. PORCELAIN TILE, 3’ X 2’ TILES. FOR MORE DETAIL REFER TO FFE.2. NEW GWB ADDED3. FURNITURE: FOR DETAILS SEE FFE.

GENERAL NOTES:1. FOR FINISHES REFER TO FFE PACKET.

3

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

WALL DETAILS

SHEET: ID5.0

TYPE 1 - DRYWALL TYPE 2 - DRYWALL W/ PLASTER TYPE 3- MASONRY WALL W/ DRYWALL

HEAD DETAILSCALE = 1/2”=1”

HEAD DETAILSCALE = 1/2”=1”

HEAD DETAILSCALE = 1/2”=1”

PLAN DETAILSCALE = 1/2”=1”

PLAN DETAIL SCALE = 1/2”=1”

PLAN DETAILSCALE = 1/2”=1”

BASE DETAILSCALE = 1/2”=1”

BASE DETAILSCALE = 1/2”=1”

BASE DETAILSCALE = 1/2”=1”

3 5/8”

5/8”

3 5/8”

5/8”

3 5/8”

5/8”

3 5/8”

5/8”

3 5/8”

5/8”

3 5/8”

5/8”

8”

7/8” 8”

8”

16”

7/8”

8”

7/8”

8”

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

DOOR SCHEDULE

SHEET: ID6.0

DOOR PLANSCALE = 1/4”=1’-0”

DOOR ELEVATIONSCALE = 1/4”=1’-0”

DOOR PLANSCALE = 1/4”=1’-0”

DOOR ELEVATIONSCALE = 1/4”=1’-0”

D1

D1

D2

D2

TAP ROOM FLOOR PLANNOT TO SCALEFOR REFERENCE ONLY

N

DOOR NUMBER

DOOR TYPE

1

2

D1

D2

DOOR FRAMEHEIGHT WIDTH MATERIAL THICKN’S

9’-0”

9’-0”

2 X 3’-0”

2 X 3’-0”

W’D / GLASS

W’D

1 3/4”

1 3/4”

FINISH MATERIAL

SS

SS

W’D

W’D

HARDWARE

LOCKSET/CLOSER

LOCKSET/CLOSER

DOOR SCHEDULE

INSIDE

OUTSIDE

6’-0” 6’-0”

1’-0

1’-0

INSIDE

OUTSIDE

9’-0

8’-6

6’-0

9’-0

8’-6

8’-0

D1

D1

D2

BATHROOM FLOOR PLANSCALE = 1/4”=1’-0”

N

ELEVATION GSCALE =1/4”=1’-0”

ELEVATION FSCALE = 1/4”=1’-0”

ELEVATION ESCALE = 1/4”=1’-0”

ELEVATION HSCALE = 1/4”=1’-0”

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

TAP ROOM ELEVATIONS

SHEET: ID7.0

MENS RESTROOM

WALL TREATMENT STALL ACCESSORIES

NORTH

SOUTH

EAST

WEST

P.T-1

P.T-1

P.T-1

P.T-1

C.V-1

C.V-1

C.V-1

C.V-1

G.W.B-1

G.W.B-1

G.W.B-1

G.W.B-1

S.T-1

S.T-1

M-1

D-1

L-1

P.T-1 = PORCELAIN TILE: ASIAN BLACK PORCELAIN TILE FROM DALETILEC.V-1 = COVE BASE: ASIAN BLACK PORCELAIN TILE FROM DALETILEG.W.B-1 = PAINTED GYPBOARDG.W.B-2 = GYPBOARDS.T-1 = BATHROOM STALLM-1 = MIRROR: KOHLER 24” BATHROOM MIRRORD-1 = DOORL-1 = LIGHTS: 4 LIGHT HOMESTEAD BATHROOM LIGHT, RUBBED BRONZE

1. MIRROR: KOHLER 24” BATHROOM MIRROR2. PORCELAIN TILE: 6”X6”, ASIAN BLACK MUSKOGEE FROM DALETILE3. PAINTED GYPBOARD4. GRANITE COUNTERTOP5. TOILET PARTITION6. COVE BASE: 6”X12” ASIAN BLACK MUSKOGEE PORCELAIN TILE FROM DALETILE

KEY NOTESKEY LEGEND

BATHROOM FLOOR PLANSCALE = 1/4”=1’-0” N

ELEVATION ASCALE =1/4”=1’-0”

ELEVATION BSCALE = 1/4”=1’-0”

ELEVATION CSCALE = 1/4”=1’-0”

ELEVATION DSCALE = 1/4”=1’-0”

MERGLER

HOTEL LAFAYETTE

DESIGNER: KAITLIN MERGLER

INSTRUCTOR: BHAKTI SHARMA

IDE 204MATERIALS AND

COLOR

FALL 2012

TAP ROOM ELEVATIONS

SHEET: ID7.0

WOMENS RESTROOM

WALL TREATMENT STALL ACCESSORIES

NORTH

SOUTH

EAST

WEST

P.T-1

P.T-1

P.T-1

P.T-1

C.V-1

C.V-1

C.V-1

C.V-1

G.W.B-1

G.W.B-1

G.W.B-1

G.W.B-1

S.T-1

S.T-1

M-1

D-1

L-1

KEY LEGEND KEY NOTES

P.T-1 = PORCELAIN TILE: ASIAN BLACK PORCELAIN TILE FROM DALETILEC.V-1 = COVE BASE: ASIAN BLACK PORCELAIN TILE FROM DALETILEG.W.B-1 = PAINTED GYPBOARDG.W.B-2 = GYPBOARDS.T-1 = BATHROOM STALLM-1 = MIRROR: KOHLER 24” BATHROOM MIRRORD-1 = DOORL-1 = LIGHTS: 4 LIGHT HOMESTEAD BATHROOM LIGHT, RUBBED BRONZE

1. MIRROR: KOHLER 24” BATHROOM MIRROR2. PORCELAIN TILE: 6”X6”, ASIAN BLACK MUSKOGEE FROM DALETILE3. PAINTED GYPBOARD4. GRANITE COUNTERTOP5. TOILET PARTITION6. COVE BASE: 6”X12” ASIAN BLACK MUSKOGEE PORCELAIN TILE FROM DALETILE