consolidation settlement examples 4_solutions-2
TRANSCRIPT
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
1/18
Consolidation Settlement – Examples 4
1. An airfeld pavement is to be constructed on a large area o sot clay,
8.0m thick, overlying a heavily fssured sandstone. In order to provide
a stronger ormation or the runways, current ground level is to be
raised by .0m o granular fll, compacted to a bulk unit weight o
18k!"m#. $he phreatic surace is at current ground level% the
saturated unit weight o the clay is 0k!"m#.
$he ollowing results were obtained rom an oedometer test carried
out on a sample o the clay over the pressure range &0'100k!"m.
(sing these data, determine the coe)cient o compressibility,
consolidation and permeability. By considering the stress changes at the centre
of the clay layer, calculate the total consolidation settlement of the layer and the time
required to achieve 90% consolidation. (0.897m2/!" 0.8#$m2/yr" 7.#$&0'# m/yr"
28mm" &.7 years).
$ime *mins+
ample $hickness
*mm+
0 18.0&
0.& 1-.
1 1-.0/
.& 1-.81
/ 1-.81#
1-.-
1 1-.
& 1-.&/&
# 1-.&08
/ 1-./
/ 1-.//
/ hours 1-./
&
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
2/18
. $he results o a consolidation test on a sample o clay or the
pressure range 00'#00 k!"m are shown below. rom these data
determine,
*a+ determine the coe)cients o permeability, compressibility and
consolidation
*#./210'# m"yr% 0./1m"3!% 0.81&m"yr+.
*b+ determine the time re4uired or an 8m thick layer o this clay
to reach 805 primary consolidation i it is drained rom both
upper and lower boundaries and sub6ected to the same stress
changes *10.- years+.
$ime *mins+ ample
$hickness*mm+
0 1-.0
0.& 1-.1#
1 1-.8/
.& 1-.81
/ 1-.--#
1-.8#
1 1-.&0
& 1-.&0
# 1-./
/ 1-./#
/ 1-./10
/ hours 1-.0/
2
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
3/18
#. * #.2m thic+ clay layer is su-ected to a uniform increase in effective vertical stress
from 80+!/m2 to &$0+!/m2. rainage of the clay layer can ta+e lace vertically
uards and donards. 1areful monitoring of the consolidation settlement of the
layer gave the folloing results
3ime (years) 0.04 0.2$ 0.$ 0.94 &.0 2.&8 #.02 $.#& 4.$ 9.0
5ettlement (mm) & #0 $ 4& 74 9& &07 &22 &$4
(a) *ssuming &'dimensional conditions revail, calculate,
(i) the coefficient of consolidation, c6 (in m2/year).
(ii) the coefficient of volume comressiility, m6 (in m2/!).
() * 2.m layer of similar clay is su-ected to a change in effective stress from
70+!/m2 to &20+!/m2. f this layer has drainage from the to surface only, calculate the time
required to achieve 47mm consolidation.
*ns (a)(i) 0.##m2/yr" (a)(ii) 0.78m2/!" () 7.#4 years
/. A clay layer o thickness &.8m is underlain by an impermeable layer
o hard shale and overlain by a moderately permeable granular layer.
$he loading will be such that the e7ective stress in the clay layer will
be increased uniormly over its whole thickness over a wide area.
In a laboratory oedometer test a specimen o the clay o thickness
0mm, sub6ect to the same e7ective stress, showed a change in void
ratio rom 0.8- to 0.80. It was observed that ater #0 minutes hadelapsed, &5 o the primary consolidation had taken place.
#
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
4/18
*a+ calculate the epected consolidation settlement o the layer
*Ans9 -mm+%
*b+ plot the primary settlement versus time curve or the layer
*time at which 105, 05, #05 etc. consolidation settlement is
achieved+% *continued over+
*c+ obtain the ecess pore water pressure *as a percentage o the
original ecess pore water pressure at the beginning o
consolidation+ at the centre o the layer at &05 and -&5
consolidation *Ans9 &&5% -5+.
. * layer of clay eneath a uilding of large lan area has consolidated and careful
monitoring has shon that a settlement of &mm has resulted in the initial #00 days
since the structure ecame oerational. *ccording to the results from laoratory
consolidation tests, this corresonds to aroimately #% consolidation of the
ultimate consolidation settlement of the layer. ou are required to rovide the
settlement versus time curve for the initial 7'year eriod *time at which &5,
105, 1&5, 05, #05 etc. consolidation settlement is achieved+.
*ssume that drainage of the layer can occur in one direction only (i.e. single'drainage
conditions) and neglect any settlement during construction.
$
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
5/18
SOLUTIONS
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
6/18
4
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
7/18
7
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
8/18
8
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
9/18
9
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
10/18
&0
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
11/18
&&
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
12/18
&2
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
13/18
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
14/18
&$
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
15/18
&
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
16/18
&4
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
17/18
&7
-
8/21/2019 Consolidation Settlement Examples 4_Solutions-2
18/18
&8