Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Upload: britton-copeland

Post on 19-Jan-2016

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Connecting Devon and Somerset

Superfast Extension Programme 04th December 2015

‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Page 2: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Today’s Agenda11.00 Welcome Address11.05 Local Political Perspective11.20 BDUK Commitment to the Programme11.35 Update on State Aid11.50 Coffee12.20 Current Thinking to move CDS Forward & Supplier’s Perspective13.10 Panel Q&A & Closing Remarks13.30 Networking & Lunch followed by

Supplier Sessions with CDS Team

Page 3: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Paula HewittCDS Board Member

‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Page 4: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Where we are now

• 225,000 premises fibre connected• Has averaged delivery of 7,000 premises a

month• On track to extend Superfast broadband to

around 90% of premises (270,000 in CDS programme)

Page 5: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Where we want to be • Phase 2 is all about SuperFast• To go to 95% and beyond• By the end of 2017• 4th utility• A robust and comprehensive solution to

benefit our communities

Page 6: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Challenges for the next Phase

• Widespread Intervention area • Areas of infill• Complex topography• Expectations• Your input

Page 7: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Introducing the CDS Team• Keri Denton – Programme Director• Phil Roberts – Programme Manager• Matt Ballard – Programme Manager

• Ken Singleton- Technical advisor• Martin Gerrish - Finance

• Sofie Francis – Communications• Iain Perkins - Procurement and Contracts

• Karen Bohan - Officer • Nathaniel Lucas – Officer

• Matt Barrow – Officer• Louise Jarman– Officer

• Katriona Lovelock Officer• Rem Noormohamed – Legal advisor

Page 8: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Councillor Andrew Leadbetter CDS Board Member

‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Page 9: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Positive impact of broadband• “Superfast broadband is rapidly becoming an

absolute necessity”• “ a massive plus”• “I’m delighted with it – it’s given me an extra

hour every day”• “We export to over 50 countries …I’m installing

the systems I’ve wanted to deploy for ages”• “we can now work remotely”

Page 10: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Importance to business in rural areas• 94% of SME’s think reliable internet connection

critical to their business• 67% agree reliance on internet will increase• 14% lack of reliable SFBB the main barrier to growth

(FSB research)

• Daily contact from businesses asking when they will be connected.

• Experience of strong take up in rural areas.• 20 Additional Business Parks covered

Page 11: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Councillor David HallCDS Board Member

‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Page 12: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Important region• CDS Phase 2 an important opportunity• Significant economy• Large population• Good take up

Page 13: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

All about Growth• GVA below national average• Local understanding of need for and

commitment to growth• Centres of excellence; aerospace, marine,

nuclear, big data, agri-tech etc.• Need for cost effective technologies

Page 14: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Financial and political commitment

• Testing economic times• Significant support from authorities across the

region• Joint approach with private sector

Page 15: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

What we hope to achieve today…. Provide information about the current position• Obtain a clear understanding of

– any concerns of potential bidders– What we can do to make bidding attractive for you– Factors which may influence desire to engage in

bidding.– Opportunity for networking within sector to enable

collaborative working and innovative solutions

Page 16: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Chris Townsend CEO, BDUK.

‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Page 17: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

1. Superfast broadband coverage to 90% of UK by early 2016

2. Universal 2Mbps standard broadband access by end of 2015

3. Superfast broadband to 95% of UK by 2017

4. Developing options to extend superfast broadband coverage beyond 95%

5. Provided over 50,000 connection vouchers to SMEs

Delivering superfast broadband to the UK

Page 18: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & SportFinal 0.5-1.0% likely to require high-speed satellite

BT superfast coverage only(incl. commercial & non-BDUK)

Proportion of UK premises able to receive superfast speeds

BT and Virgin premises

Virginonly

BDUK Phase 1£1.2bn public funds

95%90.8%75%

4.2m

BDUK Phase

2Up to

£500m

9%

21.6m12.9m

45%

100%

1.1m

25.8m 26.9m

28m

2.7m

Number of premises

99%

20172015

Extending coverage

Page 19: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Current position

• Superfast broadband is available to 83 per cent of UK premises

– up from 45 per cent in 2010 •(Ofcom’s Strategic Review of Digital Communications discussion document, July 2015)

• Average broadband speed in the UK has more than quadrupled since 2010 – from 5.2Mbps in May 2010 to 28Mbps in June 2015

(Ofcom Infrastructure Report, 2014)

• 99 per cent of premises are able to access speeds of 2Mbps or above by end of 2015 and USC will offer option for the remaining 1%

(Ofcom European Broadband Scorecard, February 2015)

• Superfast broadband coverage (over 83%) and take-up per household (over 27%) in the UK is highest among EU5 countries

Page 20: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Phase 1 & 2 - 95% of the UK

£1.2bn total public investment with £530 million from BDUK to reach 90% of UK premises by 2016

44 projects across the UK

3.3 million premises passed

4 million by spring 2016

4.2 million additional premises by June 2016

£250m BDUK funding plus local match funding to reach 95% of UK by end of 2017

44 contracts signed

3 Contracts to be signed

1 million additional premises by December 2017

Phase 1 superfast roll-out Phase 2 superfast roll-out

Page 21: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Broadband Fund for the South West

• The new Digital Communications Infrastructure Strategy outlines an ambition for Ultrafast Broadband for nearly all of the UK

• This fund extends the support already being provided through the superfast programme

• The south west has some of the most difficult topography in the UK for fixed broadband rollout

• The fund will prioritise bids which provide ultrafast speeds of at least 100Mbps.

• £5m available in each of 16/17 and 17/18

Page 22: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

£8m market test pilots exploring options for going beyond 95%

7 pilots being taken forward into deployment Suppliers have now published their feasibility reports live services available

over 700 customers connected

Phase 3 - the final 5%Phase 3 superfast roll-out

Page 23: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

• Demonstrated the viability of alternative approaches in the Final 5%

• Flexibility has created cost savings in deployment.

• Working successfully with local authorities

• Exploring the options for community funding models

• Ways of overcoming difficulties in relation to planning permission

Market Test Pilots:Initial Findings

Page 24: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Market Test Pilots

Supplier Location Technology

Satellite Internet Exmoor, Devon & Somerset

Superfast capable satellite

Callflow Hampshire Hybrid FTTP, FTTC and FWA

Avanti Scotland & Northern Ireland

Superfast capable satellite

AB Internet Monmouthshire Hybrid fibre and wireless

Airwave North Yorkshire Fixed Wireless

Quickline North & North East Lincolnshire

Fixed Wireless

Cybermor Northumberland Hybrid fibre and wireless

Page 25: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Market Test Pilots: Wireless

AB Internet - Fixed Wireless

Superfast

Airwave – Next Generation Wireless

Quickline - Superfast Wireless Network.

Page 26: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Market Test Pilots: Hybrid

Cybermoor – FTTP in a Challenging Environment.

Call Flow – Hybrid Approach

Page 27: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Market Test Pilots: Satellite

Satellite Internet - Superfast Capable

Satellite

Avanti - Superfast Capable Satellite

Page 28: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Market Test Pilots:What are customers saying?

• 92% of respondents thought there were benefits to the new broadband.

• The three most popular benefits of new broadband identified by respondents

were speed, reliability and cost.

• Only 2% of respondents do not intend to keep their new broadband at the end of the pilot period, if the price remains the same.

BDUK Survey – September 2015

Page 29: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

Growth in non-BT projects

June 2013Rural Community Broadband Fund (~£1m) Fibre Garden (ITS) Tove Valley Northmoor (Gigaclear)

June 20147 x Market Test Pilots (£8m) AB Internet Airwave Avanti CallFlow Cybermoor Quickline Satellite Internet

2015Phase 2 Procurements (£20m) Airband Callflow Cotswold (ITS) Gigaclear x3 UK Broadband

Page 30: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Department for Culture, Media & Sport

BDUK Commitment

• BDUK Funding has been ring fenced for delivery of the project

• BDUK are committed to supporting CDS with senior management support, project management and value for money advice

• BDUK are committed to finding a State Aid solution that will work for the CDS Phase 2 Procurement

Page 31: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Matt AgarCommercial Lead BDUK

‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Page 32: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Page 32

• Rules designed to regulate the use of public sector resources so as to avoid distortions of competition in EU

– Can include Subsidies, Grants, Loans, Guarantees, Benefits in Kind

• The specific State aid rules for the deployment of broadband networks are referred to as the Broadband Guidelines.

State aid rules do not generally apply to:• Aid which satisfies the Market Economy Operator principle (formerly “MEIP”)

– The public body must be behaving in the same way as a private investor in similar circumstances.

– E.g. pari passu loans and equity, appropriately priced guarantees

• Aid to compensate for Services of General Economic Interest (SGEI)– Relates to beneficiaries entrusted with clearly defined public service

mission

What is State aid?

Page 33: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Page 33

• BDUK approach to State aid is to progress a twin-track process to a flexible approach for local bodies to either:- – Pursue an ‘umbrella’ Notification: A process where the Commission examines how the

scheme conforms to the 2013 Broadband Guidelines and whether any derogations are necessary; and – as an alternative

– Support General Block Exemption Regulation II (GBER II) Article 52: For smaller schemes and projects (schemes less than €150 million or projects less than €70 million).

• GBER compliant projects do not require notification, but are subject to strict criteria regarding the deployment of broadband, in particular, requiring the provision of full open access.

• BDUK is aligning the two approaches as much as possible, incorporating recent best practice, as well as reflecting on our conversations with the Commission, to make both options as practicable as possible• E.g. balancing Commission’s expectation for smaller procuring smaller areas with

the market’s requirement for a minimum scale of network and expectation of low ‘transaction costs’

BDUK Approach to State aid

Page 34: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Page 34

• The full requirements of the Broadband Guidelines flow through to any procurements seeking to utilise GBER II as their State aid ‘approval’ route.

• The key requirements for procurements under GBER II is that they will need to provide full open access and where targeted to provide NGA services:-– Fibre to the Premise – duct access, dark fibre, physical unbundling and bitstream.– Fibre to the Cabinet – duct access, dark fibre, sub-loop unbundling and bitstream– Fixed Wireless Access – mast, antennae, backhaul and bitstream

• Key principle is that access is not limited to broadband uses and that other forms of access e.g. mobile has to be provided subject to reasonableness test.

Use of GBER II

Page 35: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Page 35

• The Guidelines and GBER II leave some uncertainty upon the requirements for open access and how in the practical terms this can be delivered by operators.

• We have engaged with market to practically define access and will be presenting the outcome of this to the Commission very soon.

• BDUK will have completed engagement and defined open access will be available prior to when bidders need to begin to prepare formal bids

Use of GBER II

Page 36: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Page 36

State Aid – Role of the National Competence Centre• BDUK’s NCC will provide oversight upon any newly notified scheme or

GBER II

• OMR – Request for Information to broadband operators

• Support local Bodies in analysis and assessment responses (coverage and technology)

• Considers assessment of alternative delivery model

• NCC validates, supplier evaluation and state aid mapping

Open Market Review

Public Consultation

• Ensures transparency as to where aid targeted.

• Seeks feedback from stakeholders (residents, businesses, suppliers).

• Confirms legal basis of targeted areas

• Requests infrastructure sharing

• NCC confirms Local Body intervention area

• Open, transparent, non discriminatory tender.

• Technology neutral.• NGA qualifying and

target appropriate white areas

• Makes use of existing assets/infrastructure.

• Step change - significant new investment in new infrastructure and doubling speeds.

• NCC confirms compliant process and provides confirms state aid compatibility

Sourcing In Life

• Wholesale access available and wholesale access requests.

• Transparency of the deployed infrastructure.

• Clawback implemented

• Price benchmarking.

• NCC monitor on-going compliance

Pre-Procurement Procurement and Contracting

Page 37: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Page 37

State aid – Key Messages for Suppliers

• Co-operate with Local Body when they are developing mapping and respond with information requested.– We don’t want to spend money where it is not required– Similar approach to development of mapping but encourage premise level

mapping– Evidence technical capability of networks as qualifying NGA Technology (e.g.

FTTC/P, cable (DOCSIS 3.0), advanced wireless technologies)

• In submitting bids – Understand your financial models and be able to demonstrate financial viability.– Evidence NGA technology compliance. – Demonstrate how wholesale access requirements will be met.

• NCC is happy to engage in direct dialogue with Suppliers on how to evidence NGA compliance for State aid approval

Page 38: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Page 38

Reference Material

• Broadband Guidelines– http

://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:C:2013:025:0001:0026:EN:PDF)

• General Block Exemption Regulation– http://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?

uri=CELEX:32014R0651&from=EN

• BDUK State aid pages– https://www.gov.uk/government/publications/state-aid-advice

Page 39: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Page 39

THANK YOU• For any questions please contact us:

– Matt Agar [email protected]– The National Competence Centre at [email protected]

Page 40: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Phil Roberts & Ken Singleton

CDS Programme Team

‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Page 41: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Current thinking on moving CDS forward: Topics to be covered:– EME intelligence– Solution layers and costs– Outline coverage requirements– Areas for further exploration– Possible scenarios– Information to assist Bidders

Page 42: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Current Thinking for CDS to move forward: • Biggest Digital Infrastructure build opportunity for rural

communities in England• EME Intelligence has helped CDS to:

– Understand Industry ‘s business development cycles & internal business case drivers to bid for an opportunity of this scale

– Understand the scope, capabilities and commercial direction of Suppliers through Early Market Engagement

– Recognise the solution layers that need to be considered during ITT development

– Capture the solution features that need to be considered in the ITT– Recognise the need to offer the catchment area in ways that allow

industry to deliver an optimum solution

Page 43: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

EME Intelligence• Understanding the scope of Companies in EME the stage , we have engaged in the

following Sector:• Fibre Operators & Providers• Wireless Operators & Providers• Main Contractors• Industry OEM’s

• And have covered the following range of topics and USP’:• Wholesale Access Network Operator• Delivery contractor / sub contractor experience• Whole Area Level or Smaller Lots• Private funding & Leverage• Alternative Business Models• Technical solution expertise

Page 44: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Illustration of Solution layers and unit costs

£ 200 £1700£ 600 £1000

Best Practice Network Solution

Technology vs Network Solution vs Unit Cost

--------------VDSL------------------>Best Practice Technology

Fit

--------------Wireless------------>

-----------------Fibre------------>

SUPERFASTAlt Net Sub Loop Unbundling

FTTC

Alt Net Fixed Wireless AccessLicensed Spectrum - LTE

Unlicensed FWASUPERFAST

ULTRAFASTAlt Net Fibre based Rural Ethernet

GPON

*All figures are indicative estimates only and should not be relied upon to make any decisions.

<------------------------------Coverage Requirements------------------------------>

Page 45: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Illustration of Solution layers and costs

£ 200 £1700

Unit Costs vs Funding Leverage

£ 600 £1000

Unit costs per

premise to LB after varying

Leverage examples Low CAPEX Leverage in order of 20%

£ 480 £ 800 £1530£ 160

High CAPEX Leverage in order of 50% and above

£ 100 £ 500 £ 850

*All figures are indicative estimates only and should not be relied upon to make any decisions.

£ 300

Page 46: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Coverage requirements• Very rural; sparsely populated; difficult terrain• No large clusters of unserved premises• Spread across entire Programme Area• Probably the largest number of unserved premises in

the UK• BUT significant pent-up demand from poor speed areas

Page 47: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Connecting Devon and Somerset

Page 48: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

National Parks

Page 49: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Postcodes with NGA White Premises

Page 50: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Heat Map showing density of NGA White Premises

25

0.5

Average of NGA White Premises per km2

7 6 5

Page 51: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Example of Possible Zones

Page 52: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

19,000

14,000

24,000

19,000

15,000

19,000

NGA White Premises(ref Feb 15 OMR currently in revision)

Page 53: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

7

11

12

15

11

25

NGA White Premises per km2

Page 54: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Heat Map overlaid with postcode locations

Page 55: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Heat Map of NGA White Premises

25

0.5

Average of NGA White Premises per km2

7 6 5

Page 56: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Heat Map of NGA White Premises

25

0.5

Average of NGA White Premises per km2

7 6 5

Page 57: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Heat Map of NGA White Premises

25

0.5

Average of NGA White Premises per km2

7 6 5

Page 58: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Heat Map of NGA White Premises

25

0.5

Average of NGA White Premises per km2

7 6 5

Page 59: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Heat Map of NGA White Premises

25

0.5

Average of NGA White Premises per km2

7 6 5

Page 60: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Heat Map of NGA White Premises

25

0.5

Average of NGA White Premises per km2

7 6 5

Page 61: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Predicted Geographical Coverage at the end of Phase 1 Contract

Yellow – one superfast providerBlue - no superfast provision

Page 62: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Phil RobertsCDS Programme Team

‘The biggest Digital Infrastructure build opportunity for rural communities in England’

Page 63: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Scope of the ChallengeOpen Market Review

– New OMR issued 9th November – closing date 7 Dec– Requested premise level information in Intervention

Area– Review will update on

• Current NGA deployment• Anticipated deployment over next 3 year period

– We want to cover what’s left!

Page 64: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Getting a head startInformation currently available

– Local authority Assets: http://www.connectingdevonandsomerset.co.uk/phase-ii-superfast-extension-programme/ ....

– CDS can access Property database of County & District Asset locations for Devon, Somerset, Police, Fire & Rescue, Exeter University

– CDS can help identify potential assets in ‘difficult’ locations– CDS can help identify areas of likely future development– Also on CDS website access to OMR data from Feb 2015 (NB Actual

Intervention Area will have increased (new sites/postcodes, Multiple Occupancy dwellings)

Page 65: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

What we have supplied in the past - What was helpful?Locations /assets• Building locations & other enabling infrastructure • Mobile and other phone masts & aerial locations• Wind farms

Page 66: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

What we have supplied in the past - What was helpful?Highways• Civil works on roads plans• General restrictions on road access (e.g. no-go

periods due to holiday traffic)• Planned Local Authority street lighting works• Street furniture

Page 67: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

What we have supplied in the past - What was helpful?Opportunities/ restrictions• Employment land – current, planned & future areas• Conservation, wildlife and woodland areas owned

by LA’s* NB Backhaul EME suggested some useful alternatives in the SW region

Page 68: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Local Authority/Public Asset Info– What further information would be useful?– How can CDS help to simplify your planning process

with respect to public assets?Areas to think about:– What can suppliers offer in return for ‘free’ or

nominal cost for way leaves?– What are the arrangements with landowners,

farmers etc. for power (if required for deployed solution)?

Page 69: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Areas CDS would like to explore with Suppliers• Business model options?• Customer take-up assumptions?• State Aid requirements; e.g. Open Access &

Wholesale pricing?• Coverage capabilities for different technologies?• Catchment area: one ‘superlot’ and/or sub Lot

areas?• Addition of requirement for ‘Ultrafast’

broadband?

Page 70: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

‘The biggest Digital Infrastructure build opportunity for rural

communities in England’

Connecting Devon and SomersetConnecting Devon and Somerset

‘The biggest Digital Infrastructure build opportunity for rural

communities in England’

Connecting Devon and Somerset

• Todays Presentation • Q&A

Can be found at:www.supplyingthesouthwest.org.uk

Page 71: Connecting Devon and Somerset Superfast Extension Programme 04 th December 2015 ‘The biggest Digital Infrastructure build opportunity for rural communities

Questions & Answer Session