connect our future – project update sushil nepal, project manager
TRANSCRIPT
![Page 1: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/1.jpg)
CONNECT Our Future – Project Update
Sushil Nepal, Project Manager
![Page 2: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/2.jpg)
Process Map – where are we?
We Are Here
![Page 3: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/3.jpg)
Work Group Deliverables
Preferred Growth Concept
Multi-alternative fuel station feasibility study
Neighborhood Energy Profiles Study
Local Government Renewable Energy Assessment
Food Systems Assessment and Action Plan
Climate Change Planning Assessment
Diesel Black Carbon Assessment & Feasibility Study
Comprehensive Economic Development Strategy (CEDS)
Brownfield/Greyfield Redevelopment Tool
Comprehensive Housing Assessment
Public Health Disparities Assessment
0%10%
20%30%
40%50%
60%70%
80%90%
100%
Percent Complete
CON
NEC
T Pr
oduc
ts/D
eliv
erab
les
Completed as scheduled
On Target for Completion as scheduled
![Page 4: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/4.jpg)
Preferred Growth concept Affirmation
Major (re)investment in walkable downtowns, mixed-use activity centers, walkable neighborhoods & major transit corridors
More housing choices, travel choices, open space/farmland preservation & job centers
Smaller service areas for providing local government services
Affirmed by CONNECT
Consortium on July 29,
2014
![Page 5: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/5.jpg)
Preview of Framework Structure
![Page 6: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/6.jpg)
Regional Framework Products: Goals
User-friendly, graphically rich Engaging user experience Use and boost the “brand” Celebratory, promotional,
informational and educational Easy to update
Tools that assist communities to implement the Preferred Growth
Concept and Strategies
![Page 7: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/7.jpg)
Framework Document Encapsulates the story of CONNECT Primary user: all. Needs to engage the
“expert” as well as the casual reader NOT a traditional report magazine
style Serves as a teaser - Provide enough to
interest the reader in getting more information directs readers to the website (use of QR codes, links, etc.)
Implementation Guide or User Manual NOT A Report
![Page 8: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/8.jpg)
Framework Document Outline
Magazine StyleFrom the EditorSpotlightFaces of CONNECT (interspersed)The CONNECT Essentials• About CONNECT• The Region• Our Future• Who Participated?• What’s Online
Features• One each about the
priorities: • Why is this a
priority• Making it happen• Here’s why it works• What you can do• Ideas from around
here and thereTools (interspersed)The Future of CONNECT
![Page 9: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/9.jpg)
Framework Website
![Page 10: CONNECT Our Future – Project Update Sushil Nepal, Project Manager](https://reader036.vdocuments.site/reader036/viewer/2022062803/56649c875503460f9493faae/html5/thumbnails/10.jpg)
What’s Next?
• Sept 18th Program and Policy Forum meeting to review, discuss and comment on content/structure of Framework
• Approval of Final Framework at November Program and Policy Forum meetings
• Influence local policies and policies at State and Federal Level (handout for reference)