connect instantly prevent spills improve process efficient fuel … › themes › fasttest ›...

2
FasTest, Inc. 1646 Terrace Drive Roseville, MN 55113 Support: (800) 444-2373 Fax: (651) 645-7390 www.fastestinc.com CONNECT INSTANTLY PREVENT SPILLS IMPROVE PROCESS Features: z Instant push/pull connection improves throughput z Integrated stop valve prevents flow of fuel when disconnected z High flow design for optimal engine run testing z Improved safety and environmental conditions z Stainless steel components provide a robust, durable product The 70 Series Fuel Rail Advantage Efficient Fuel Rail Leak Testing 1/4” 5/16” 3/8” Fits SAE J2044 Standard Sizes: Hot engine run testing Cold engine leak testing Fuel rail component testing

Upload: others

Post on 27-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONNECT INSTANTLY PREVENT SPILLS IMPROVE PROCESS Efficient Fuel … › Themes › fasttest › Content... · 2016-07-27 · FasTest, Inc. 1646 Terrace Drive Roseville, MN 55113 Support:

FasTest, Inc. 1646 Terrace Drive Roseville, MN 55113 Support: (800) 444-2373 Fax: (651) 645-7390 www.fastestinc.com

CONNECT INSTANTLY PREVENT SPILLS IMPROVE PROCESS

Features:

z Instant push/pull connection improves throughput

z Integrated stop valve prevents flow of fuel when disconnected

z High flow design for optimal engine run testing

z Improved safety and environmental conditions

z Stainless steel components provide a robust, durable product

The 70 Series Fuel Rail Advantage

Efficient Fuel Rail Leak Testing

1/4”

5/16”

3/8”

Fits SAE J2044 Standard Sizes: Hot engine run testing

Cold engine leak testingFuel rail component testing

Page 2: CONNECT INSTANTLY PREVENT SPILLS IMPROVE PROCESS Efficient Fuel … › Themes › fasttest › Content... · 2016-07-27 · FasTest, Inc. 1646 Terrace Drive Roseville, MN 55113 Support:

FasTest, Inc. 1646 Terrace Drive Roseville, MN 55113 Support: (800) 444-2373 Fax: (651) 645-7390 www.fastestinc.com

Product Safety:

All FasTest products have been designed with safety in mind, however, it is the responsibility of the product users to design each process in such a way to avoid mishaps that can cause physical hazard or property loss. Secondary restraints such as safety chains, shields, cages or fixtures are all good choices depending on the application. FasTest can recommend or assist you in clarifying potential hazards of your application.

Sleeve Actuation

PartNumber

StopValve

SAE J2044Size

Seal Dia.

Bead Dia.

RatedPSI

Flow (Cv) (A) (B) Termination

Port (C)Repair

KitMain Seal

Pack

FRV7004041 Yes 1/4” .248”6.30 mm

.344”8.75 mm 200 .38 3.02”

76.71 mm.99”

25.15 mm 1/4” NPT R-FR04 S1106B70

FRV7005041 Yes 5/16” .310”7.89 mm

.432”10.98 mm 200 .45 3.02”

76.71 mm.99”

25.15 mm 1/4” NPT R-FR05 S1108B70

FRV7006061 Yes 3/8” .374” 9.49 mm

.509” 12.94 mm 200 .54 3.30”

83.82 mm1.18”

29.97 mm 3/8” NPT R-FR06 S1109B70

FR7004041 No 1/4” .248”6.30 mm

.344”8.75 mm 750 .69 3.02”

76.71 mm.99”

25.15 mm 1/4” NPT R-FR04 S1106B70

FR7005041 No 5/16” .310”7.89 mm

.432”10.98 mm 750 1.25 3.02”

76.71 mm.99”

25.15 mm 1/4” NPT R-FR05 S1108B70

FR7006061 No 3/8” .374” 9.49 mm

.509” 12.94 mm 750 1.46 3.30”

83.82 mm1.18”

29.97 mm 3/8” NPT R-FR06 S1109B70

Specifications:

Materials . . . . . . . . . . . . . Stainless steel sleeve and components Main seal. . . . . . . . . . . . . 70 Durometer Buna N/NitrileFits SAE J2044 standard fuel railInline NPT termination port

A

BC