concluding remarks

20
Concluding Remarks Dongchul Son Center for High Energy P hysics Kyungpook National Unive rsity

Upload: sanaa

Post on 12-Jan-2016

55 views

Category:

Documents


0 download

DESCRIPTION

Concluding Remarks. Dongchul Son Center for High Energy Physics Kyungpook National University. Examples of Leading Questions National Research Council Committee on Physics of the Universe report. 1.  What is dark matter ? 2. What is dark energy ? - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Concluding Remarks

Concluding Remarks

Dongchul SonCenter for High Energy Physics

Kyungpook National University

Page 2: Concluding Remarks

Examples of Leading QuestionsNational Research Council Committee on Physics of the

Universe report

1. What is 1. What is dark matterdark matter? ?

2. What is 2. What is dark energydark energy??

3. How were the 3. How were the heavy elements from iron to uraniumheavy elements from iron to uranium made? made?

4. Do 4. Do neutrinos have massneutrinos have mass??

5. Where do 5. Where do ultra-energy particlesultra-energy particles come from? come from?

6. Is 6. Is a new theory of light and mattera new theory of light and matter needed needed to explain what happento explain what happens at very high energies and temperatures?s at very high energies and temperatures?

7. Are there 7. Are there new states of matternew states of matter at ultrahigh temperatures and den at ultrahigh temperatures and densities? (Quark-Gluon Plasma State)sities? (Quark-Gluon Plasma State)

8. Are 8. Are protons unstableprotons unstable??

9. What is 9. What is gravitygravity??

10. Are there 10. Are there additional dimensionsadditional dimensions??

11. 11. HowHow did the did the Universe beginUniverse begin??

Page 3: Concluding Remarks
Page 4: Concluding Remarks

ILC, the Door to a Scientific Revolution

• Findings in the past years still lead us to many leading questions (suggesting low SM higgs mass, TeV Scale Physics, possibly with SUSY, dark matter, dark energy, extra dimensions, etc.)

• While we have many remarkable theoretical models, we need more comprehensive understanding of what we observe

• We need the experimental tools now or in the near future to make the discoveries

• In 2007 LHC will turn on. With its great discovery potential, the LHC probably lay the foundation of our understanding

• The LHC alone will not suffice to unlock all the mysteries. ILC will take additional tools to make the complementary discoveries needed to sharply and fully understand our Universe

Page 5: Concluding Remarks

ILC: the Energy Frontier Machine

Page 6: Concluding Remarks

Enormous Strides toward ILC

• The HEP community has made enormous strides this past year, both in the accelerator and detector arenas, towards realizing a unified, international design for the ILC

– ICFA (with ACFA, ECFA, US) established ILCSC in 2002

– We have a Very Active ILCSC• Concepts of GDE/GDI/Organization• LC Parameters (Sep 2003)• Cold Technology (ITRP, Aug 2004)• 1st ILC Workshop (Nov. 2004)• GDE Director (Feb, 2005)

Page 7: Concluding Remarks

Global Design Effort (GDE)• On March 18, 2005 Barry

Barish officially accepted the position at the opening of LCWS 05 meeting at Stanford

• Barry reported the GDE plan at this ACFA workshop

• Now we also have a new ILCSC Chair, Prof. Sin-ichi Kurokawa.

• Congratulations !

Page 8: Concluding Remarks

From Governments and Funding Agencies side

• OECD – Global Science Forum launched th Consultative Group on HEP and accepted its report on HEP Roadmap, etc. (2002)

• OECD Ministerial Meeting (Jan 2004) adopted statements on LC as a next collider machine, emphasizing the importance of global R/D efforts, manpower raising-up, and early discussions among government agencies

• Funding Agencies for LC(FALC) meetings began 2003 and started discussion on MoU and Site Selection– Asia partners (Japan, Korea, India) joined (2004)– FALC established FALC-Resource Group (Feb. 2005)

• Expect More Activities in coming years

Page 9: Concluding Remarks

GDE Director’s View and Plan

• Near Term Plan– Staff the GDE

Total staff size about 20 FTE (2005-2006)– Organize the ILC effort globally

• First Step --- Appoint Regional Directors within the GDE, Make Website, coordinate meetings, coordinate R&D programs, etc

– R&D Program• Coordinate worldwide R & D efforts, (Proposal Driven to

GDE)

Technically Driven Schedule

Page 10: Concluding Remarks

Near Term Plan (GDE)

• Schedule• Begin to define Configuration (Aug 05) • Baseline Configuration Document by end of 2005-----------------------------------------------------------• Put Baseline under Configuration Control (Jan 06) • Develop Reference Design Report by end of 2006

• Three volumes -- 1) Reference Design Report; 2) Shorter glossy version for non-experts and policy makers ; 3) Detector Concept Report

Page 11: Concluding Remarks

• The Machine

• Accelerator baseline configuration will be determined and documented (BCD) by the end of 2005

• R&D program and priorities determined (proposal driven)

• Baseline configuration will be the basis of a reference design done in 2006

• The Detector(s)

• Determine features, scope: one vs two, etc (same time scale)

• Measure performance of the baseline design

• Beam delivery system and machine detector interfaces

• Define and motivate the future detector R&D program

The GDE Plan

Page 12: Concluding Remarks

Now, ILC on its Vehicle• The results of studies presented and

summarized at this workshop will provide very sound inputs to the Global Design Efforts (especially to the 2nd ILC Workshop and Snowmass)

• This workshop also had discussions on accelerator / Machine Detector Interface (MDI) issues (new approach and very productive)

• GDE Director wants Detector/Physics staff in Central/Regional Teams

• Welcome this kind of very cohesive approach to ILC Design

Page 13: Concluding Remarks

ILC, a New Truly Global Project / Lab

• It is very important that not only the ILC efforts but also a (existing or new) Lab hosting ILC should be truly GLOBAL and INTERNATIONAL in order for the ILC to be realized TIMELY and SUCCESSFULLY

• So is the G(lobal) D(esign) E(fforts)• The Regional Efforts within Asia should be truly multi-laterally int

ernational• To be so, it is highly desirable to keep this spirit among us and t

o show it to public during the courses of efforts even though there are a very big gaps and differences in the levels of understanding and supports and wide range of rationale among Asian countries

• Nevertheless, we should NOT forget that ILC physics to be pursued should be emphasized with the highest priority among us and to the public

Page 14: Concluding Remarks

Messages from OC and Others

Page 15: Concluding Remarks

Plan of Activities in Asia

Let us make an MOU among Asian institutes and interested parties(for a realistic level, starting from groups in University, labs, etc)

Regarding regional activities for general aspects for ILCincluding physics and detector R&D, accelerator R&D and outreach to various societies and bodies.

This will be a basis to secure R&D budgets from many resources and governments.

Based on discussion among members of ACFA, ALCSC, ICFA, Asian Regional Team, and ACFA LC Workshop OC

Page 16: Concluding Remarks

Continue regular meeting among Asian members of

ACFA, ALCSC, ICFA, Regional team headquarters, ACFA OC.

A teleconference meeting before Snowmass,

then a face-to-face meeting at Snowmass.

Urgent tasks

1. A very urgent task is to identify active contact persons (3-4?) and outreach experts in each country.

2. An important target is to form the MOU above.

3. Draft to propose structure of regional GDE.

4. Draft to propose (request) what role, what to do, authority of regional director.

Long term—

5. Seek ways to get budgets and expand outreach.

Page 17: Concluding Remarks

Outreach group First task: GLC executive summary translate to each local language. Title GLCILC Translation of web page made by GDE. 1-2 page pamphlet.

An idea------ To Organize `Council` consisting of High level persons, discuss founding/human resource advice regional team, ACFA, Contact governments together with GDE, regional GDE, ALCSC, ACFA.

Next ACFA workshop------ China or Japan. Avoid too many meeting, but regional meetings are important. Hopefully to be decided by the time of Snowmass meeting.

Page 18: Concluding Remarks

The next ACFA LCWS1st 1998 Beijing

2nd 1999 Seoul

3rd 2000 Taipei

4th 2001 Beijing

5th 2002 Tokyo

6th 2003 Mumbai

7th 2004 Taipei

8th 2005 Korea This workshop

9th 2006 Japan or China

Page 19: Concluding Remarks

Advertisements• Don’t forget coming events!!!

– 8th ICFA Seminar• 28 September ~ 1 October, 2005• Kyungpook NU, Daegu, Korea• ILCSC (27 Sep), ICFA (29 Sep), FALC RG Meetings (1~2 O

ct morning) will be co-located• ACFA Plenery Meeting (2 Oct) at Pohang

– LCWS 2006• 9~14 March, 2006• Bangalore, India• GDE Meeting will be co-located

Page 20: Concluding Remarks

Thanks to LOC, Staffs, and Students

&

Thanks to all the speakers and participants