COMPLETE STREETS IMPLEMENTATION PLAN

CITY OF DEERFIELD BEACH

COMPLETE STREETS IMPLEMENTATION PLAN

May 2012 Complete Streets Committee formed

Customized the Broward Guidelines for the Deerfield Beach context

Guidance for design treatments and decision-making

Extensive community outreach

DEERFIELD BEACH COMPLETE STREETS GUIDELINES

PREVIOUS COMPLETE STREETS EFFORTS

COMPLETE STREETS IMPLEMENTATION PLAN

WHICH CORRIDORS TO IMPROVE FIRST?

NETWORK VISION3

Destinations

Transit Access

High Pedestrian Crashes

Gaps in Sidewalk

Challenging Crossings

Speeding Issues

Slow Speed Roadways

High Truck Volumes

Average Annual Daily Traffic Volumes

High Bike Crashes

No Bike Lanes

Opportunities for Redevelopment

City Jurisdiction of Right-of-Way

DATA-BASED ANALYSIS TO IDENTIFY KEY CORRIDORS

4

COMPLETE STREETS IMPLEMENTATION PLAN

NORTHEAST 20TH AVENUE

PHASE 1 CORRIDOR RECOMMENDATIONS

5PHASE 1 CORRIDOR RECOMMENDATIONS

Narrow pavement

25 mph speed limit

Sidewalks on west side

No bicycle facilities

Slow vehicle speeds

Pull-in parking

Pedestrians frequent

EXISTING CONDITIONS

COMPLETE STREETS IMPLEMENTATION PLAN

NORTHEAST 20TH AVENUE

PHASE 1 CORRIDOR RECOMMENDATIONS

6

No change to

pavement width

Add street trees and

enhanced

landscaping

Fill in sidewalk gaps

along NE 20th Ave

and NW 4th Court

Install pedestrian-

scale lighting along

NE 20th Ave and

NW 4th Court

Phase out pull-in

parking

ENHANCEMENTS

PHASE 1 CORRIDOR RECOMMENDATIONS

COMPLETE STREETS IMPLEMENTATION PLAN

NORTHEAST 20TH AVENUE

PHASE 1 CORRIDOR RECOMMENDATIONS

7

Install speed table with

crosswalks at NE 20th Ave

& NE 4th Court as a

gateway feature

Stripe crosswalks at NE 4th

Court & A1A

ENHANCEMENTS

PHASE 1 CORRIDOR RECOMMENDATIONS

Speed Table: Elevated Intersection with Pavement Design

Planning-Level Cost

Estimate:

$293,000

Potential Funding Source:

Community

Redevelopment Agency

Funds

COMPLETE STREETS IMPLEMENTATION PLAN

SOUTHWEST 3rd AVENUE (MARTIN LUTHER KING JR. AVENUE)

PHASE 1 CORRIDOR RECOMMENDATIONS

8PHASE 1 CORRIDOR RECOMMENDATIONS

4 lane undivided roadway

30 mph speed limit

Low traffic volumes (6,000

AADT)

No bike lanes

BCT & Community Bus

stops

Sidewalks on both sides with

grassy buffer

Faded crosswalks

Large curb return radii at

intersections

EXISTING CONDITIONS

COMPLETE STREETS IMPLEMENTATION PLAN

SOUTHWEST 3rd AVENUE (MARTIN LUTHER KING JR. AVENUE)

PHASE 1 CORRIDOR RECOMMENDATIONS

9

‘Road Diet’

One vehicle travel

lane in each

direction

Buffered on-street

bicycle lanes

Raised median with

landscaping

No difference in

edge-to-edge

pavement width

ENHANCEMENTS

PHASE 1 CORRIDOR RECOMMENDATIONS

COMPLETE STREETS IMPLEMENTATION PLAN

SOUTHWEST 3rd AVENUE (MARTIN LUTHER KING JR. AVENUE)

PHASE 1 CORRIDOR RECOMMENDATIONS

10

Extend median nose

across crosswalks to

create pedestrian refuges

Enhance existing

pedestrian crossings

Add new crosswalk to

Deerfield Park Elementary

Reduce curb return radii

ENHANCEMENTS

PHASE 1 CORRIDOR RECOMMENDATIONS

Pedestrian median refuge design

Planning-Level Cost Estimate:

$1,130,000

Potential Funding Source:

Broward Metropolitan Planning

Organization Transportation

Improvement Program Funds

COMPLETE STREETS IMPLEMENTATION PLAN

LOOP CORRIDOR: CRYSTAL LAKE DR, NW 45TH ST, AND MILITARY TRAIL

PHASE 1 CORRIDOR RECOMMENDATIONS11

• 2.3 miles long• Military Trail from Sample Rd to NW 45th Street

• NW 45th Street from Military Trail to Crystal Lake Drive

• Crystal Lake Drive from NW 45th Street to Military Trail

W SAMPLE RD

COMPLETE STREETS IMPLEMENTATION PLAN

LOOP CORRIDOR: CRYSTAL LAKE DR, NW 45TH ST, AND MILITARY TRAIL

PHASE 1 CORRIDOR RECOMMENDATIONS

12PHASE 1 CORRIDOR RECOMMENDATIONS

Military Trail

4 lane divided roadway

40 mph speed limit

High traffic volumes (18,500 AADT)

No bike lanes

BCT bus stops

Sidewalks on both sides with grassy buffers

Faded crosswalks

NW 45th St & Crystal Lake Drive

2 lane roadway

25 mph speed limit - slow speeds

Narrow thoroughfare

Intermittent sidewalks

Few shade trees

EXISTING CONDITIONS

Military Trail looking north to Eastridge

NW 45th Street just east of Crystal Lake Drive, looking eastCrystal Lake Drive looking northwestPull-in parking along Crystal Lak eDrive just west of Military Trail

COMPLETE STREETS IMPLEMENTATION PLAN

LOOP CORRIDOR: CRYSTAL LAKE DR, NW 45TH ST, AND MILITARY TRAIL

PHASE 1 CORRIDOR RECOMMENDATIONS

13

Expand sidewalk to

provide a 10-ft wide

shared use path on

east side

No changes to

vehicle lane

configuration

Utilize existing

pavement pull-outs

for future bus

service (Broward

MPO 2040 LRTP

unfunded project)

ENHANCEMENTS

PHASE 1 CORRIDOR RECOMMENDATIONS

COMPLETE STREETS IMPLEMENTATION PLAN

LOOP CORRIDOR: CRYSTAL LAKE DR, NW 45TH ST, AND MILITARY TRAIL

PHASE 1 CORRIDOR RECOMMENDATIONS

14

Fill in sidewalk gaps

Implement shared

lane markings (aka

‘sharrows’)

Add street trees and

enhance

landscaping

ENHANCEMENTS

PHASE 1 CORRIDOR RECOMMENDATIONS

COMPLETE STREETS IMPLEMENTATION PLAN

LOOP CORRIDOR: CRYSTAL LAKE DR, NW 45TH ST, AND MILITARY TRAIL

PHASE 1 CORRIDOR RECOMMENDATIONS

15

Construct sidewalk

along north side

Implement shared

lane markings (aka

‘sharrows’)

Install raised

crosswalks at select

locations

ENHANCEMENTS

PHASE 1 CORRIDOR RECOMMENDATIONS

COMPLETE STREETS IMPLEMENTATION PLAN

LOOP CORRIDOR: CRYSTAL LAKE DR, NW 45TH ST, AND MILITARY TRAIL

PHASE 1 CORRIDOR RECOMMENDATIONS

16PHASE 1 CORRIDOR RECOMMENDATIONS

Planning-Level Cost Estimate:

$833,000 exclusive of moving utility

boxes and poles at intersections.

Potential Funding Sources:

• City Road and Bridge Funds

• Grant Funds

COMPLETE STREETS IMPLEMENTATION PLAN

Incorporate the specific projects into the Capital Improvement Plan

Explore funding partnerships with other agencies

Broward MPO

Broward County

FDOT

Apply methods and criteria to future corridors (Phase 2 and beyond)

WHAT’S NEXT?

17