![Page 1: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/1.jpg)
COMPANY UPDATEFEBRUARY 2017
![Page 2: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/2.jpg)
Presentation Contents:
• Funding Round Rationale
• Company Snapshot and Deal Flow
• Introduction
• Products
• Power-to-Gas Projects
• Clean Fuel Projects
£16.98m under contract | £1.37m in negotiation | £18.35m total*
0m
2m
4m
6m
8m
10m
12m
14m
16m
18m
20m
22m
24m
Contract Pipeline
Under Contract In Negotiation
COMPANY UPDATEFEBRUARY 2017
*As at 26th January 2017
![Page 3: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/3.jpg)
ACHIEVEMENTS IN CALENDAR YEAR 2016
HYDROGEN ENERGY SYSTEMS
![Page 4: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/4.jpg)
MAJOR TRANSACTIONS
HYDROGEN ENERGY SYSTEMS
TRANSITIONING FROM GRANTS TO SALES
• Only major transactions included (above £0.5M)
• 2014: First major transactions
• 2015: Dominated by grant income
• 2016: Transitioning from grant income to sales revenue
![Page 5: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/5.jpg)
POWER-TO-GASENERGY STORAGE
Stock image
![Page 6: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/6.jpg)
![Page 7: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/7.jpg)
WHY POWER-TO-GAS?
POWER-TO-GAS RATIONALE
Electricity cannot be stored easily | Hydrogen can be stored easily in the gas grid
Source: ITM Power plc
HYDROGEN ENERGY SYSTEMS
![Page 8: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/8.jpg)
ENERGY STORAGE | CLEAN FUEL
POWER TO GAS ENERGY STORAGE
Current Hydrogen Limits for Gas Grid InjectionCovered by a range of local laws and directives
Belgium
Volume | Molar %
0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% 11% 12%
Sweden
France
Germany
Switzerland
Austria
Italy
Spain
Czech Republic
Canada
USA
NZ
UK
![Page 9: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/9.jpg)
ENERGY STORAGE | CLEAN FUEL
ELECTRIFY HEAT?
![Page 10: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/10.jpg)
ENERGY STORAGE | CLEAN FUEL
ENERGY STORAGE TECHNOLOGIES
ENERGY STORAGE TECHNOLOGIES
Power-to-gas is efficient | long term | low energy cost
Source: ITM Power plc
![Page 11: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/11.jpg)
32MWH BATTERY | P2G COST COMPARISON
BATTERY | P2G COST COMPARISON
HYDROGEN ENERGY SYSTEMS
Lithium Ion System (6,300 sqft)
• Project will cost $53.5m
• 8MW with 4hr duration | 32MWh
• $6.7m/MW | $1.67m/MWh
Power-to-Gas System (3,530 sqft)
• Project will cost $21.6m
• 8MW with 4hr duration | 32MWh
• $2.7m/MW | $0.67m/MWh
• 8MW with 12hr duration | 192MWh
• $2.7m/MW | $0.22m/MWh
The Tehachapi Energy Storage Project features 604,832 lithium-ion battery cells, housed in
10,872 modules of 56 cells each, stacked in 604 racks arranged in rows.Tehachapi Energy Storage Project
![Page 12: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/12.jpg)
P2G PRODUCTS
Company image
![Page 13: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/13.jpg)
MARKET OFFERING
MARKET OFFERINGRapid Response | High Pressure | High Efficiency | MW scale
• Rapid response: less than 1s; for primary grid balancing
• High pressure: up to 80bar; for direct injection
• High efficiency: 77% measured by Thuga Group; 86% measured by RWE (with heat recovery)
• MW scale: 1MW modules available today
• Compliant: EU and USA
• Operations: 3yrs in the field
ENERGY STORAGE | CLEAN FUEL
Company image
![Page 14: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/14.jpg)
MARKET OFFERING
MARKET OFFERINGRapid Response | High Pressure | High Efficiency | MW scale
• Rapid response: less than 1s
• High pressure: up to 80bar
• High efficiency: 75% measured
• MW scale: 1MW modules
• Compliant: EU and USA
ENERGY STORAGE | CLEAN FUEL
New low cost, high performance stack technology |856 kg/day | 2.2MW
CAD image of actual product
![Page 15: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/15.jpg)
STANDARD PRODUCTS
MARKET OFFERING
83kg/day245kW
250kg/day693kW
536kg/day1.46MW
1,340kg/day3.62MW
ENERGY STORAGE | CLEAN FUEL
CAD images of actual product
![Page 16: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/16.jpg)
100MW DESIGN
100MW DESIGN
HYDROGEN ENERGY SYSTEMS
1MW to 10MW
• Bus refuelling stations
• Small P2G demonstrations
10MW to 60MW
• Large transport schemes
• Power-to-Gas installations
• Chemicals Industry
60MW to 100MW
• Power-to-Gas installations
• Chemicals Industry
• Refineries
The Tehachapi Energy Storage Project features 604,832 lithium-ion battery cells, housed in
10,872 modules of 56 cells each, stacked in 604 racks arranged in rows.Stock image
![Page 17: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/17.jpg)
Modular Design | Thermal Integration | Heat Recovery
• Avoids compounding container costs | Enables two storey construction
• Modular approach | wide capacity offering | Pathway to large scale without technology risk
• Qualified for grid balancing in UK and Germany
• Efficiency from 77% to 86% (measured by RWE)
• Integrated heat recovery
• Compact | modular | low noise
COMPLETE TURN KEY SOLUTION
HYDROGEN ENERGY SYSTEMS
100MW DESIGN | COMPLETE TURN KEY SOLUTION
CAD images using existing technologies scaled up
![Page 18: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/18.jpg)
Company image
![Page 19: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/19.jpg)
FUEL CELL VEHICLES
VEHICLES | ROLL OUT
WHAT IS A FUEL CELL VEHICLE?
An EV drive train that’s refuelled rather than recharged
• Refuel in 3 mins
• Range 300-420 miles
• Managed energy export
![Page 20: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/20.jpg)
FUEL CELL CAR ROLLOUT
1
ENERGY STORAGE | CLEAN FUEL
H2
H2H2
H2
H2
H2
H2
H2Company Diagram
![Page 21: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/21.jpg)
ITM POWER HRS SITES
ITM POWER HRS SITES
Four FCH JU projects that define UK hydrogen fuel
• Build | Own | Operate model
• 3 operational HRS by December 2016
• Siting collaboration with Shell
• Dispenser collaboration with BOC Linde
ENERGY STORAGE | CLEAN FUEL
![Page 22: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/22.jpg)
ENERGY STORAGE | CLEAN FUEL
HYFIVE | LONDON
HYFIVE | LONDON
FCH JU Project number: 621219
• NPL Teddington London Opened May 2016
• CEME Rainham London Opened Oct 2016
• Cobham M25 Shell forecourt Opening Feb 2017
NPL Teddington
CEME Rainham A13 Cobham M25
Company images
![Page 23: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/23.jpg)
ENERGY STORAGE | CLEAN FUEL
H2ME | UK
H2ME | UK
FCH JU Project number: 671438
• Beaconsfield M40 Shell Forecourt Opening Q2 2017
• Gatwick M23 Shell Forecourt Opening Q2 2017
• Forecourt integration with dispenser under the main canopy
Beaconsfield M40
![Page 24: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/24.jpg)
ENERGY STORAGE | CLEAN FUEL
H2ME2 | UK
H2ME2 | UK
FCH JU Project number: 700350
• H2ME2 1 Swindon Q4 2017
• H2ME2 2 Birmingham Q4 2017
• H2ME2 3 TBC Q2 2018
Johnson Matthey Swindon
Tyseley Energy Park Birmingham
TBC
![Page 25: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/25.jpg)
FCH JU Project number: 700092
Eday: Curtailed wind and tidal turbines
• 0.5 MW of electrolysis | 500kg storage
• Heating of school
Shapinsay: Curtailed wind
• 1MW of electrolysis
• Heating of school
Orkney Mainland:
• 75 kW FC: heat and power to marina
• H2 refuelling station | 10x Symbio FC vans
• Transport: 5x 250 kg tube trailers
ENERGY STORAGE | CLEAN FUEL
BIG HIT | ORKNEY
POWER-TO-GAS | ORKNEY
![Page 26: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/26.jpg)
ITM POWER | FUEL CONTRACTS
ITM POWER | FUEL CONTRACTSUK stations | £10/kg | dispensing 1tonne/day by the end of 2018
ENERGY STORAGE | CLEAN FUEL
![Page 27: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/27.jpg)
FUEL CELL BUSES
Company images34
![Page 28: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/28.jpg)
HYDROGEN BUSES
VEHICLES | ROLL OUT
HYDROGEN BUSES
An EV drive train that’s refuelled rather than recharged
• Refuel of 40kg in 6 mins
• Range 200 miles
• Managed energy export
![Page 29: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/29.jpg)
NEWBUSFUEL STUDY
ENERGY STORAGE | CLEAN FUEL
![Page 30: COMPANY UPDATE - ITM Power: Energy Storage | … UPDATE FEBRUARY 2017 *As at 26th January 2017 ACHIEVEMENTS IN CALENDAR YEAR 2016 HYDROGEN ENERGY SYSTEMS MAJOR TRANSACTIONS HYDROGEN](https://reader033.vdocuments.site/reader033/viewer/2022051508/5aa24bea7f8b9a84398cdca5/html5/thumbnails/30.jpg)
COMPANY UPDATEFEBRUARY | LONDON