Company Profile of VHPC (1) Company Profile of VHPC (1)
Hitachi Ltd. (Japan)
Hitachi Plant Technologies, Ltd (Japan) (HPT)
HPC Venezuela C.A. (VHPC)
68%: Shareholder
100%: Shareholder
3
Company Profile of VHPC (2)Company Profile of VHPC (2)
Affiliate company of Hitachi Plant Technologies Ltd, Japan (HPT):100% shareholder Project Execution Experience from 1978 (as HPT, Japan)
Establishment date of VHPC: January 1988Execution Experience:
- Hydroelectric Power(Guri, Macagua, Caruachi)- Thermal Power (CADAFE,TACOA, ELEVAL)- Direct Reduction plant(OPCO, ORINOCO IRON)- Pellet Plant (FMO)- Railway Project-DEPOT (IAFE)
4
Company Profile of VHPC (3)Company Profile of VHPC (3)
Paid-in capital: 240,000,000 BolivarsTotal Sales (from 1979 to present) : more than 600 MUS$
Main Bank: The bank of Tokyo Mitsubishi UFJ ltd / Banco Provincial Venezuela
“Accumulated Local Management Know-how”
“Advanced Technology Transferred from HPT Japan”
5
History of VHPCHistory of VHPC
HPC Venezuela, C.A. was established in January 1988
1978 1988
Guri Dam Macagua Dam
Hitachi Plant Technologies ,Ltd(Former: Hitachi Plant Engineering and ConstructionCo., Ltd)
HPC Venezuela, C.A
6
Location: Venezuela, Puerto OrdazLocation: Venezuela, Puerto Ordaz
VHPC is located in Puerto Ordaz, Bolivar State of Venezuela
Puerto Ordaz
Caracas
7
Fabrication &
Manufacturing
Business Area of HPTBusiness Area of HPT
Public and municipal/
industrial Systems
Mechatronics
Industrial Plant
Systems
Air conditioning
Systems
Energy systemsBusinessBusiness
DomainDomain
● Large-size pumps
● Water treatment systems and equipment
● Compressor
● Converters
● LC transport systems
● LC
manufacturing
● Printed board printer
● Cranes
equipment
● Chemical/Pharmaceutical plants
● Food Plants
● Chemical equipment
● Enviromental
Preservation systems
● Air conditioning/clean room
● Air conditioning for building
for industrial factory
● Nuclear power plant
● Thermal power plant
● Dust collection system
ConstructionConstructionDesign
EngineeringR&D
● Hydropower plant
8
Business Area – Construction businessBusiness Area – Construction business
Installation work of Mechanical equipmentPiping work Electrical workInstrumentation workInsulation work, Panting, Ducting workSupply of auxiliary equipmentSupply of materials (e.g. piping, cable, tray, conduit)Inland transportation and unloading workFoundation work (civil work)Supply of Steel FabricationMaintenance work etc
9
CanadianHitachi Plant(Saskatchewan)
HPC Venezuela C.A.(Estado Bolivar)
Egypt Branch(Alexandria)
Head OfficeTokyo
HPC Thailand(Bangkok)
PHPC Co.Ltd.Inc.(Manila)
HPC Australia Pty.Ltd.(Brisbane)
Indonesia Rep.Office(Jakarta)
Singapore BranchAsia Middle East Branch Office
HPC Engineering(M)(Kuala Lumpur)
GuatemalaHitachi Plant
HPT China(Shanghai)(Suzhou)(Shenzhen)
HPTNew York Office(New York)
UAE. Office(Dubai)(Abu Dhabi)
Vietnam Office(Ho Chi Minh)
: Head Office: Branch Office: Project Office: Subsidiary
Global Network: Offices & SitesGlobal Network: Offices & Sites
UK Branch(London)
Sri Lanka Office
IndiaOffice
TaiwanBranch.
Qatar Office
10
VHPC’s Human ResourcesVHPC’s Human Resources
As of 2008 Peak time
Japanese (permanent): 5 p. 5 p.
Japanese (for construction) : 5 p. 50 P.
Management staff : 10 p. 50 P.
Engineers: 20 p. 50 P.
Supervisory staffs: 50 p. 100 P.
Workers: 200 p. 3,000 P
Total: 290 p. 3,255 P
*The number of personnel depends on construction volume
11
VHPC
Guri Hydro
Macagua Hydro
Caruachi Hydro
ELEVAL / CADAFE
Thermal Power
Caracas IAFE Railway DEPOT
Project Site Location MapProject Site Location Map
OPCO / Orinoco Iron / FMO Plants
Tacoa Thermal Power
Tocoma Hydro
12
CADAFE Thermal PlantCADAFE Thermal Plant
1978– 1984
PLANTA CENTRO THERMAL POWER STATION UNITS 3 & 4, and Unit 5
Owner: COMPAÑÍA ANONIMA DE ADMINISTRACION Y FOMENTO (CADAFE)
Unit:3 & 4: Installation of Two 1400 Ton/Hour Boilers and Associated equipment for 400 MW generating Units No 3 & 4, AFE including erection of Steel Structures of the Boilers.
Unit 5: Installation of 1,400 Ton/Hour
boiler for 400 MW generation unit.
13
Guri II Hydro Power (1)Guri II Hydro Power (1)
1978 - 1986
GURI HYDRO ELECTRIC POWER STATION STAGE II
Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)
Installation of 10 units of 730 MW water turbine and 805 MVA ACgenerators including associated utility system. Supply and/or installation of auxiliary equipment which included 42 transformers, 9 overhead cranes, 38 vertical pumps, 10 sets of insulated phase bus ducts, 5 units of 765 KV SF-6 gas insulated bus duct, 6 elevators, 3 diesel engine generators, structure bridge for discharge canel, complete set of electrical panels, instrumentation, piping, cabling, illumination and painting work.
14
Guri II Hydro Power (2)Guri II Hydro Power (2)
Total generating capacity 10,300MW Guri,Venezuela
15
OPCO HBI plantOPCO HBI plant
1987 - 1989
“OPCO” HOT BRIQUETTED IRON PLANT
Owner: OPERACIONES AL SURDEL
ORINOCO (OPCO)
Installation of 800,00 Ton/Year
Hot Briquetted Iron Plant.
Work involved dismantling, removal and refurbishing the (OPCO) old plant and constructing a new plant system. Erection in all phase of mechanical, electrical and instrumentation work wereundertaken.
16
Macagua Hydro Power (1)Macagua Hydro Power (1)
1988 - 1998
MACAGUA II AND III HYDRO ELECTRIC POWER STATIONS
Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)
MACAGUA II: Installation of 12 units of 216 MW FRANCIS type water turbines and 250 MVA generators.
MACAGUA III: Installation of 2 units of 86 MW KAPLAN type turbine and 102 MVA generators.
17
Macagua Hydro Power (2)Macagua Hydro Power (2)
MACAGUAMACAGUA
ⅡⅡ Hydropower StationHydropower Station((Venezuela)Venezuela)
18
Orinoco Iron HBI plant (1)Orinoco Iron HBI plant (1)
1998 - 2000
HOT BRIQUETTED IRON PLANT (FINMET PROCESS)
Owner : ORINOCO IRON, C.A.
Hot Briquetted Iron Plant. The work was the complete Mechanical Installation of the Core Plant which consisted of the Process Plant (Reactor and Briquetting), Gas Generation Plant, Structure Buildings, Pipe Racks, Pipings, Utilities, Insulation, Refractory, Painting and all Main and Auxiliary Equipment related there do.In Addition Pipe Rack Fabrication and Partial Piping Pre-Fabrication was carried out. The Total Weight Installation was 46,000 Tons.
19
Orinoco Iron HBI plant (2)Orinoco Iron HBI plant (2)
20
Guri II Hydro Power: 5 units First stageGuri II Hydro Power: 5 units First stage
Construction period: 2002 - 2005
Project name: GURI No.2 HYDRO ELECTRIC POWER STATION STAGE I – 5 units
Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)
Client: GE Hydro (NORCAN)
HPT & VHPC’s scope
- Disassembly, Refurbishment
and Reassembly work
21
Caruachi Hydro Power (1)Caruachi Hydro Power (1)
Construction period: 2000 - 2006
Project Name: CARUACHI HYDRO ELECTRIC POWER STATION 281MW x 12 units
Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)
Client: GE Hydro (KENSA)
HPT & VHPC Scope
- Installation and Testing of KAPLAN Type Water Turbines and Generators.
- Installation and Testing of the excitation systems, Transformers (7 Units) and Power House Bridge Cranes (3 Units)
22
Caruachi Hydro Power (2)Caruachi Hydro Power (2)
23
Tacoa DCS Thermal Power plant (1)Tacoa DCS Thermal Power plant (1)
Construction period: 2004-2005
Project Name: Tacoa Power plant unit 7, 8 & 9 - DCS (Distributed digital controls) project
Owner: La Electricidad de Caracas (EDC)
Client: Toshiba Corporation (Mitsui & Co., ltd)
Site: Caracas
HPT & VHPC’s scope
- Installation and electrical works
- Supply of cables & materials
24
Tacoa DCS Thermal Power plant (2)Tacoa DCS Thermal Power plant (2)
25
ELEVAL H25 Power plant (1)ELEVAL H25 Power plant (1)
Construction period: 2005-2006
Project name: ELEVAL H25 GTG x 1 units
Owner : ELEVAL
Client: Hitachi Ltd (Mitsui & Co., ltd)
Site: VALENCIA, Venezuela
HPT & VHPC’s scope
- Installation and electrical works
- Foundation work
- Inland transportation and material supply
26
ELEVAL H25 Power plant (2)ELEVAL H25 Power plant (2)
27
Caracas Railway: DEPOT facilityCaracas Railway: DEPOT facility
Construction period: 2006-2007Project name: Caracas Railway project / DEPOTOwner : IAFEClient: Kawasaki Plant systemsSite: CharallaveHPT & VHPC’s scope
- Installation of DEPOT Equipment
28
FMO Pellet plant Expansion FMO Pellet plant Expansion
Construction period: 2006-2007
Owner : CVG FERROMINERA ORINOCO, C.A. (FMO)
Client: Kobe Steel, Ltd Japan / Venezuela
Site: Matanzas Industrial Area
HPT & VHPC’s scope
- Installation and electrical works
29
Guri II Hydro Power: No.15 GeneratorGuri II Hydro Power: No.15 Generator
Construction period: 2006 - 2007
Project name: GURI HYDRO ELECTRIC POWER STATION STAGE II – Rehabilitation work of No.15 generator
Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)
Client: ALSTOM Hydro Venezuela S.A.
VHPC’s scope
- Rehabilitation of site work
30
Guri Hydro Power: Overhead CraneGuri Hydro Power: Overhead Crane
Construction period: 2006 - 2009
Project name: GURI No.2 HYDRO ELECTRIC POWER STATION–Renovation of overhead crane
Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)
Client: ALSTOM Hydro Venezuela S.A.
VHPC’s scope
- Renovation of site work
Under Construction
31
Guri Hydro No.1 Power 4units RehabilitationGuri Hydro No.1 Power 4units Rehabilitation
Construction period: 2007 - 2010
Project name: GURI HYDRO ELECTRIC No.1 POWER STATION Unit #7- #10 (4units) Renovation project
Owner : C.V.G. ELECTRIFICACION DEL CARONI C.A (EDELCA)
Client: ALSTOM Hydro Venezuela S.A.
HPT & VHPC’s scope
- Site field work
- Material supply Under Construction
32
Guri No.1 &2 Control system RenovationGuri No.1 &2 Control system Renovation
Construction period: 2008 - 2010
Project name: GURI HYDRO ELECTRIC No.1 &2 POWER STATION, Control system renovation
Owner : ELECTRIFICACION DEL CARONI C.A (EDELCA)
Client: Asea Brown Boveri (ABB) Venezuela S.A.
HPT & VHPC’s scope
- Site field work
Under Construction
33
Tocoma Hydropower projectTocoma Hydropower project
Construction period: 2008 - 2014
Project name: Tocoma Hydropower project (216MW x 10 units)
Owner : ELECTRIFICACION DEL CARONI C.A (EDELCA)
Client: IMPSA
HPT& VHPC’s scope
- Site field work
- Material supply
- Warehouse, temporary facility
Under Construction
34
Guri II Hydro Power: 5 units Second stageGuri II Hydro Power: 5 units Second stage
Construction period: 2008 - 2012
Project name: GURI No.2 HYDRO ELECTRIC POWER STATION STAGE II – 5 units
Owner : ELECTRIFICACION DEL CARONI C.A (EDELCA)
Client: Consorcio EURO-BRAS Guri (VA tech & Voith-siemens)
HPT & VHPC’s scope
- Disassembly, Refurbishment
and Reassembly work
Under Construction
35
Pre-Engineering : Benefits to ClientPre-Engineering : Benefits to Client
Realization of EffectiveConstruction ScheduleReduction of Total Project Costby minimizing Erection CostReduction of DocumentationCostSmoothing Site work
Suggestion of Design foroptimizing Erection Work &Construction ScheduleIntroduction of AdvancedErection TechnologyAssistance of makingDocumentation forconstruction planningAdvice of site workconditions
Clinet: Engineering & Main Equipment SupplyClinet: Engineering &
Main Equipment Supply
VHPC: Pre-Engineering
Service
VHPC: ConstructionVHPC: Construction
VHPC: Feed-BackVHPC: Feed-Back
Benefits to Client
36
Our Advantages: Benefits to ClientOur Advantages: Benefits to Client
Wide Range of Work Scope Accumulated Project Knowledge & ExperienceAdvanced Construction Technology Global NetworksSkillful Human RecoursesPre-engineering Service
Advanced Project ManagementSystematic Schedule ManagementInterface management with Other Parties
MinimumCost
MinimumCost
On Time On Time
Long-term ExperienceSound financial backgroundQA/QC, Safety Policy
Total SatisfactionTotal Satisfaction
Our Advantages Benefits to ClientCost
Schedule
Reliability
37
ContactContact
UD-502 Calle Arboleda, Zona Industrial Matanzas, Puerto Ordaz Edo. Bolivar, Venezuela, Apdo. Postal #690
Tel:<58>(286)941174
Fax:<58>(286)942055
RIF: J-00262933-9
Webpage: http://www.vhpc.com.ve/