Company Profile
DUMDUMA CONSTRUCTION &
TRADING CORPORATION
-
DCTC Profile Page 2
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
Introduction
DUMDUMA
CONSTRUCTION &
TRADING CORP.
(DCTC)
A dynamic construction company primarily catering to the needs of private
offices in the field of Architecture,
Engineering, Construction, Design, and
Planning.
Dumduma Construction and Trading
Corporation (DCTC) is involved in
Building Constructions, specializing in
Rebar Fabrication & Installation Works,
System Forms using Aluma Forms, Shin
Forms, and RMD Quick Forms, Masonry
Works, Stainless & Steel works as well as
Supervision and Project Design
Management related to structural works and
Allied Engineering.
The Companys most vital asset is its dynamic human resources highly skilled, experienced, and motivated people who
serve DCTC clients in various capacities.
The groups teamwork, professionalism, and commitment to integrity and excellence
have propelled DCTC to growth, success,
and recognition.
Safety of the public and its works quality is
of paramount importance in all DCTC
operations. In every construction activity,
the company aims for a high level of safety
and performance at par and beyond client
satisfaction.
In this age of fresh challenges and
technological changes, DCTC will continue
to expand, invest, and improve on its
technical competence and resources.
Dumduma Construction and Trading
Corporation (DCTC) builds much more than
buildings and facilities. It also seeks to build
lasting partnerships with clients , associates
and employees on a solid foundation of trust and reliability. The company is proud
to include most of countries leading developers and top names in the
construction industry in its pool of clients.
The Company
Vision
To actively contribute to national development by operating and managing a
full-service construction firm that will serve
the needs of both the government and
private sectors.
-
DCTC Profile Page 3
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
The Company
Mission
In every project, Dumduma Construction and Trading Corporation (DCTC) strives
to exceed its clients expectations and achieve project goals through service,
technology, and performance of the highest
quality.
In line with this company mission, DCTC
constantly aims for cost-effectiveness, work
efficiency, and increased productivity.
General Information
COMPANY NAME :
DUMDUMA CONSTRUCTION &
TRADING CORP.
(DCT Corp.)
BUSINESS ADDRESS :
1600 Espana Boulevard Cor.
Dos Castillas St. Sampaloc, Manila
TeleFax: 731 2164 ; 994-1176
Mobile No.: 0922-833936
0922-833938
Email Add:
REGISTRATION :
PDCGS
Founded
September 7, 2002
DTI Certificate Number 899190
(October 23, 2002 to October 23, 2006)
SSS Registration Number
33 1674255 - 4 Tax Identification number
207 537 627 000 Business Permit Number
15057
DCT CORP.
Founded
August 7, 2006
SEC Registration Number
CS200612398
SSS Registration Number
33 1674255 - 4 Tax Identification number
006-339-964
Business Permit Number
117-00-2004-004948
AUTHORIZED CAPITAL :
P 5,000,000.00(100%Filipino Owned)
BANK REFERENCE : Metro Bank Espana Branch
China Trust Rada Branch
DBP Commonwealth Br.
BDO Espana Br.
-
DCTC Profile Page 4
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
Primary Services
Offered Construction & Specialty Works Rebars Fabrication and Installation, System Formworks
Construction & Supervision General Building and Engineering
Masonry Works CHB Laying, Tiling, Plastering
Project Management
Cutting list Preparation & Optimization
Structural Works and Allied Engineering
Structural Steel Works
Design & Planning
Value Engineering
Quantity Surveying & Estimates
PreDesign Services
Mass Housing projects ( Low Cost Housing)
Stainless Steel Works
Bending & Fabrications
AN OVERVIEW OF THE SERVICES
WE OFFER
This includes a complete service for Project Studies, Consultation, Design, Estimate,
and Implementation of all phases in:
I. Architectural & Civil Works
1. Fabrication & Installation
of Reinforcing Steel Bars
2. System Formworks
(Aluma Forms, Shin Forms,
RMD Quick Forms)
3. Design, Estimate, & Supervision
of buildings and shop works
as required
4. Construction of Roads and Building
5. Renovation & Construction
of the following:
Residential Building Commercial Building Industrial Building School Building
II. Mechanical Works
1.Storm Drainage System
2.Water Distribution System
3. Sewer, Sanitary, and Vent System
4. Downspout System
5. Plumbing Fixtures & Installation
of Fire Protection System
III. Electrical Works
1. Complete installation from
Power Transformer to
Power Distribution.
-
DCTC Profile Page 5
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
2. Supply & Installation of all types of
building materials, equipment, lighting,
power, and auxiliary systems.
IV.General Services
1. Building & Ground Maintenance 2. Any kind of Painting Works 3. Masonry Works
CHB Laying Plastering Tiling Marble installation
4. Fabrication & Installation of Trusses, C-Purlins, and Open Web Purlins.
5. Installation of Gypsum Board Wall & Ceiling
V. Preventive Maintenance
This covers all phases of services and
maintenance work relative to projects
undertaken by DUMDUMA CONSTRUCTION & TRADING CORPORATION
Methodology
of Rebar Fabrication
& Installation
CUTTING LISTS
Cutting lists means producing shop drawings and
computations of rebar cut length
and bend taking into account a
minimum wastage on
commercial length. It also
means value engineering. For
shop drawings and
computations, it should be
based on the approved For Construction Drawings. It will be submitted for
correction/approval of the
client/s and designers. In these
computations of rebar cutting
lists, minimum wastage is to be
considered from each
commercial length that will be
used in the project.
Only approved materials complying with the standard
specifications & requirements
set by the designer, duly noted
by QA/QC inspector that it has
proper documentation and
passed a series of test
requirements indicating batch
file numbers of materials are to
be use in the fabrication and
installation.
FABRICATION
Cut and fabricate reinforcement bars needed for installation
using the approved rebar cutting
list and staking plan as the
basis. Prior to fabrication,
double check actual clear
lengths based on actual site
condition with respect to the
approved cutting list, make
adjustments as per actual
measurement if necessary.
The bar will be cut based on cut length from a commercial
length using a bar cutter. If the
bar needs to have a hook, it will
be bended using a bar bender
until the degree of bend will be
met. Note that each machine has
a maximum bar diameter to be
-
DCTC Profile Page 6
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
cut or bend. Bar diameter higher
than the allowable diameter of
the machine should not be cut
or bend on the machine to
prevent machine breakdown.
INSTALLATION
Haul fabricated bars from the fabrication area to the site for
installation.
It will be assisted by a mobile crane or a tower
crane. Hauling small items such as
ties and chair bars, an improvised basket
should be used.
Install necessary scaffoldings and lifelines prior to installation of rebar especially at
columns and perimeter beams and girders. Use
necessary personal protective
equipments such as safety harnesses and
gloves.
In installing reinforcement bars for mat footings, bottoms bars
are to be installed first then
chair bars are to be position in
place before the top bars are
installed.
For columns, a tie is tied on the footing as a guide in the
installation of starter bars. Once
the corner vertical bars are put
in place, a set of ties are to be
tied up to hold the vertical bars,
then the remaining vertical bars
are to be installed. After that,
ties will have to be completed.
Vertical bars are to be spliced
only at the splicing zone
required by the structural
designer. For columns, it should
be at the middle H/3 of the
column where H is the clear
height of column. Prior to
splicing, ties up to the next floor
level should be installed. Then
the vertical bars are to be
lapped, and fabricated concrete
spacers are to be put in place
before the forms are installed.
Same methodology with shear
walls and retaining walls.
For beams and girders, Top and bottom bars should be put in
place and tied up together at the
center of span for easier
placement of ties. Once the
required numbers of stirrups are
put in place, it will be tied up
with the main bar with correct
spacing based on the approved
cutting list. Rebars are to be
spliced only at the splicing zone
required by the structural
designer. For top bars, splicing
should be within the center but
will not go beyond L/4 of clear
span from the face of column.
And for the bottom bars, the
splice length center should be
0.22L from the face of the
column. Extra top bars should
go until L/4 from face of
column and whichever length is
larger from the adjacent span
will govern. Extra bottom bars
are placed 0.165L of clear span
from each column face. Stirrups
on splicing will have spacing
100mm or as it is stated on the
designers general notes. Shear bars of the same diameter of the
main bar is installed if there are
construction joints. To have a
correct concrete covering for
the bar, a fabricated concrete
spacers are tied to the bars.
-
DCTC Profile Page 7
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
For slabs, bottom bars are to be placed first. All necessary
embedment for electrical,
mechanical, fire protection, etc.,
are to be installed by the trades
in charge prior to the
installation of top bars. Then
concrete spacers are to be
placed between the bottom bars
and the slab forms. Also, a chair
bar will be place between the
bottom bars and the top bars.
QUALITY ASSURANCE
The fabrication and installation will be strictly under the
supervision of an appointed
rebar
supervisor/foreman/leadman to
implement a quality work. He
will implements monitor and
check fabrication and
installation considering
approved cutting lists, proper
housekeeping and safety.
If there are comments by the management on the work, it will
be immediately be rectified.
MASONRY
METHODOLOGY
CHB LAYING
Prepare area for layout of concrete hollow block ( CHB ) wall Layout
all CHB wall in accordance with the
approved plans and shop
drawings.Upon completion of all
layout, straightened all dowels or
drill vertical and horizontal starter
bars with epoxy if not provided.
Set out one layer of starter block on all laid out areas prior to
commencing of all CHB
laying,Areas with waterproofing and
with CHB wall pour 75mm thick
Upstand wall ( Zocallo ).After
completion of the starter block, start
laying the CHB and fill all cells as
per structural requirements.
Install Styrofoam at end of CHB wall between reinforced columns, beams
and walls, sealant with backer rod
follows after completion of CHB
wall.
Provision of stiffener beam above 3.00 meter high wall and stiffener
column wider than for 4.00 meters
width wall.
Recheck layout and plumbness of CHB wall in relation to door and
window openings.
Place all plastering guide and then request for approval with the concern
departments prior to plastering
works.With the approval proceed
with the plastering work.
Proposed Rectification Methodology of
Wall with Short Horizontal Dowels
Determine the area of chb wall to be cut ,were the rebar dowels is short.
With the used of a Grinder cut the
determined area of chb to be
removed.
Demolished the chb until the rebar is exposed.Clean the rebar, it must be
free of concrete littans.
Spliced the rebar with the standard length of splicing to meet the
required length for dowels.
Replaced the chb and fill it with mortar.
-
DCTC Profile Page 8
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
PLASTERING
Check all areas to be plastered base on latest FCD and approved
drawings.
Prepare all documents to be submitted/routed/signed/ by all
concern prior to commencing
plastering to insure all utilities are in-
placed.
After obtaining the approval, prepare plaster bases and substances for
direct application of plaster ,
removing loose materials and
substances which might impair the
work.
Immediately apply scratch coat on areas to be plastered to insure
maximum bonding of plastering to
CHB wall.
Provide concrete button or concrete guide strips to insure alignment and
plumbness of the finish plaster
following the surveyors layout and
set-out points.
Allow scratch coat to dry then apply the finish coat following the guide
buttons or strips using straight
aluminum bars to specified smooth
trowel finish.
Clean the area and moist cure the completed plastered surfaces.
Quality Assurance
Program
I. Jobsite Quality Control
Trained project Supervisor / General
foreman will supervise and control the
quality of works, monitor if the rebar
that have been installed meet the
technical requirements of the structural
supervisor and in compliance with all
the requirements appeared in the
approval of cutting list.
II. Monitoring and Control on/offsite activities
The fabrication in charge will check
the actual cut length to see if they
match in the cutting list and fabrication
requirement to avoid the confusion and
error during the installation of rebar.
III. Cutting and Fabrication
Fabricate desired diameters of rebar to
desired length using approved rebar
cutting list and structural framing plan
as the basis of fabrication. Double
check actual clear length of the are of
installation on site with respect to the
approved cutting list , make sure
adjustments as per actual measurement
if necessary. Also maximize the
materials such that the total length of
rebars is utilized and wastage is
minimized.
IV. Briefing of Installer & Steelman
In order to avoid the mistakes during
the installation, the steelman will be
advised of all the detailed
requirements, regarding rebar
installation. Also , they will be
provided a copy of approved cutting
list.
V. Installation
The installation works will be strictly
under the supervision of the appointed
site rebar supervisor/ general foreman,
to follow the details. Also, installed
rebar as per approved cutting list,
-
DCTC Profile Page 9
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
checking proper spacing, splicing and
tightening lateral ties and main bars
will be thoroughly given attention.
VI. Rectification
After the joint inspection with the
project management or general
contractor , we will rectify all the
defective areas until the final
acceptance by the project management
representative.
Management Safety
Commitment
SAFETY POLICY
- To protect the welfare of our worker through a safe and
healthy environment.
- To promote and propagate a culture of safety and health at
work.
SAFETY MISSION
- To promote awareness that everyone has a responsibility for
his or her own safety.
- To generate a safe and effective worker.
SAFETY MANAGEMENT PRINCIPLES
- Safety begins at the top. - Safety begins in the design stages - A proactive rather than a reactive
approach is best.
- Controls can be anticipated and implemented before exposure to
the hazard occurs.
- Assigning specific responsibility and accountability are key to
successful management.
- Safety pays.
PROFILE OF SAFE AND EFFECTIVE
WORKER
-
DCTC Profile Page 10
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
List of On-Going
Projects
AMVEL MANSIONS TOWER 3
Sucat Paranaque
AMVEL LAND DEVELOPMENT CORP
Rebar Fabrication &Installation
ARYA RESIDENCES
Global City , Taguig
DATEM INCORPORATED
Rebar Fabrication &Installation
ONE SHANGRILA
Pasig City
DATEM INCORPORATED
Rebar Fabrication &Installation
Php 8,041,000.00
THE MIRANTE
Global City , Taguig
MAKATI DEVT CORPORATION Rebar Fabrication &Installation
RHAPSODY RESIDENCES
Muntinlupa City
DMCI
Rebar Fabrication &Installation
STELLAR PLACE
Quezon City
DMCI
Rebar Fabrication &Installation
MARICIELO VILLAS
Las Pinas City
DMCI-HOMES
Rebar Fabrication &Installation
Php 2,318,543.98
MUSA (Residential Proj. )
Sampaloc Manila
DCTC
General Construction
ACCOLADE
Cubao , Quezon City
DMCI
Rebar Fabrication &Installation
Php 2,259,091.19
FLAIR TOWERS
Mandaluyong City
DMCI
Rebar Fabrication &
Installation
Php 24,789,000.00
THE GROVE
Pasig City
HILMARCS Const.
Rebar Fabrication &Installation
SIENA PARK RESIDENCES
Paranaque City
DMCI
Rebar Fabrication & Installation
Php 7,900,000.00
LA VIRTI
Pasay City
DMCI-HOMES
Rebar Fabrication & Installation
Php 30,424,000.00
DISCOVERY PREMEA
Makati City
DATEM INCORPORATED
Rebar Fabrication & Installation
30% Completed
Php 49,000,000.00
ZUELLIG BLDG.
Makati City
LEIGHTON CONSTRUCTION
Rebar Fabrication & Installation
70% Completed
Php 25,048,000.00
-
DCTC Profile Page 11
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
THE RED OAK TOWER
BGC, Taguig City
Rebar Fabrication & Installation
Makati Development Corporation
80 % Completed
Php 16,000,000.00
STRATA GOLD TOWER
China Town, Manila City
Presscon Phillipines
Rebar Fabrication & Installation
80 % Completed
Php 8,000,000.00
Completed Projects
MAGNOLIA PLACE
Tandang Sora, Quezon City
DMCI
Rebar Fabrication & Installation
Php 7,000,000.00
CEDAR CREST
Taguig City
DMCI
Rebar Fabrication & Installation
Php 8, 000,000.00
THE MIND (MUSEUM)
Taguig City
DATEM INCORPORATED
Rebar Fabrication &Installation
Php 1,738,776.00
VICENTE CRUZ RESIDENCES
Sampaloc Manila
DCTC
Building Construction
SKYWAY PROJECT STAGE 2
Alabang Muntinlupa City
DMCI (Construction)
Off / Site Rebar Fabrication & Site Installation
Php 32,000,000.00
MERCEDES BUILDING
Makati City
DATEM INCORPORATED
Rebar Fabrication & Installation
Php 13,000,000.00
EAST RAYA PROJECT
Pasig City
DMCI
Rebar Fabrication & Installation
Php 12,500.000.00
THE ASTON PROJECT BGC, Taguig City
Makati Development Corporation
Rebar Fabrication & Installation
Php 15,800,000.00
ONE ROCKWELL
Makati City
DATEM INCORPORATED
Rebar Fabrication & Installation
Php 30,000,000.00
G. TUAZON COMERCIAL BLDG.
Sampaloc Manila
DUMDUMA CONSTRUCTION &
TRADING CORPORATION
Building Construction
Php 4,000,000.00
ILLUMINA RESIDENCE
V. Mapa St. Sta. Mesa Manila
DMCI
Rebar Fabrication & Installation
Php 16,000,000.00
TIVOLI TOWER B & C
Taguig City
DMCI
Rebar Fabrication and Installation
Php 30,000,000.00
-
DCTC Profile Page 12
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
OHANA PLACE
Las Pinas City
DMCI
Rebar Fabrication & Installation
Php 7,000,000.00
NEW VILLAMOR PUMPING STATION &
RESERVOIR
Villamor Pasay, City
DMCI (Construction)
Off Site Rebar Fabrication & Site Installation
PROPOSED 18th
STOREY
COMMERCIAL & RESIDENCIAL
AZTEC
Rebar Fabrication & Installation
Php 11,000,000.00
SERENDRA (Phase 2)
Fort Bonifacio, Taguig
Makati Development Corporation
Masonry Works
ROYAL PALM
Taguig City
DMCI
Rebar Fabrication and Installation
Php 29,000,000.00
MAHOGANY
Taguig City
DMCI
Rebar Fabrication and Installation
CYPRESS Taguig City
DMCI
Rebar Fabrication and Installation
TRIBECA TOWER
Paranaque City
ASEC Deveoplment
Fabrication and Installation
ANGELES MALL Angeles, Pampanga
Makati Development Corporation
Rebar Fabrication and Installation
E DELA ROSA ONE
Makati City
Makati Development Corporation
Rebar Fabrication and Installation
E DELA ROSA ONE
Makati Development Corporation
Masonry Works
Php 16,000,000.00
THE RESIDENCES AT GREENBELT
(TRAG2) Arnaiz St. cor. Paseo de Roxas, Makati City
Makati Development Corporation
Masonry Works
TIVOLI TOWER A
Taguig City
DMCI
Rebar Fabrication and Installation
HOLCIM CEMENT PLANT Davao City
Vinnell- Belvoir Corporation
Prestessed Concrete Raw Meal SILO Project
SERENDRA (Phase 2)
Fort Bonifacio, Taguig
Makati Development Corporation
Rebar Fabrication & Installation
PhP 2,500,000.00
CELEBRITY PLACE - THE MANORS
Celebrity Plaza, Capitol Hills,
DMCI Homes
Rebar Fabrication & Installation
PhP 1,043,700
-
DCTC Profile Page 13
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
CAMPANILLA CENTER Quezon City
DMCI Homes
Rebar Fabrication & Installation
RAYA GARDENS
Brgy. Merville, Paranaque City
DMCI Homes
Rebar Fabrication & Installation
PhP 1,530,553.15
RAINBOW RIDGE 2
Brgy. Hagonoy, Taguig, Metro Manila
DMCI Homes
Rebar Fabrication & Installation
Php 16,000,000.00
THE RESIDENCES AT GREENBELT
Arnaiz St. cor. Paseo de Roxas, Makati City
Makati Development Corporation
Rebar Fabrication & Installation
PhP 1,500,000.00
NORTH TRIANGLE COMMERCIAL CENTER North Ave., Quezon City
SKI Construction Group
Rebar Fabrication & Installation
PhP 2,000,000.00
MAYFAIR TOWER
U.N. Avenue, Malate, Metro Manila
SKI Construction Group
Rebar Fabrication & Installation
PhP 4,749,710
DANSALAN GARDENS (TOWER 2)
Boni, Mandaluyong City
DMCI (Construction)
Rebar Fabrication & Installation
PhP 1.989,820.17
AMVEL MANSIONS (TOWER 1 & 2)
Sucat, Paraaque
Asian Construction & Devt. Corporation Rebar Fabrication & Installation
PhP 4.2 Million
PHILIPPINE KIDNEY DIALYSIS
FOUNDATION Building 2
Roces Ave., Quezon City
ConMech Construction
Rebar Fabrication & Installation
Installation of Formworks (Shin Forms)
Concreting works
PhP 2 Million
MCU HOSPITAL EXTENSION
Caloocan City
Asian Construction & Devt. Corporation Rebar Fabrication & Installation
PhP 700,000
UNIVERSAL RELIANCE BLDG.
Binondo, Manila
Ironcon Construction & Devt. Corporation Rebar Fabrication & Installation
PhP 1.625 Million
UST MULTI-DECK PARKING
UST Compound, Espaa, Manila
Asian Construction & Devt. Corporation Rebar Fabrication & Installation
PhP 500,000
AMVEL MANSIONS (TOWER 2)
Sucat, Paraaque
L & M MaxCo Co., Inc.
Rebar Fabrication & Installation
PhP 1,500,000.00
VISTA de LAGO CONDOMINIUM Taguig, Pateros
DMCI Homes
Rebar Fabrication & Installation
PhP 2.65 Million
PALM GROVE
Sucat, Paraaque
DMCI Homes
Rebar Fabrication & Installation
PhP 660,000
-
DCTC Profile Page 14
(
P
re
vi
o
us
ly
Pl
ac
id
o
D
u
m
d
u
m
a
C
o
ns
tr
u
ct
io
n
&
G
e
n
er
al
S
er
vi
ce
s
P
D
C
G
S
)
(
CATHEDRAL OF PRAISE SERENITY
Taft Ave., Manila
Direct to the Owner
Rebar Fabrication & Installation
PhP 300,000
FORD BLDG
Fort Bonifacio, Taguig
New Kanlaon Construction Inc.
Rebar Fabrication & Installation
PhP 1.175 Million
SERENDRA (Phase 1)
Fort Bonifacio, Taguig
Makati Development Corporation
Rebar Fabrication & Installation
PhP 3.30 Million
AVIDA TOWERS New Manila (Tower 1)
Bonni Serrano Avenue, Quezon City
Best Builder Construction
Rebar Fabrication & Installation
PhP 2.98 Million
BONIFACIO HEIGHTS
Fort Bonifacio Taguig
DMCI
Rebar Fabrication & Installtion
PhP 700 ,000.00
COMANDO BRIDGE
Taguig Metro Manila
DMCI
Rebar Fabrication & Installation
PhP 500 ,000.00
FERNDALE SUBDIVISION Phase 3 (Trench3) Sampaguita Ave. Pasong Tamo Quezon City
Kumagai
Massonry Works
PhP 300,000.00
THE NEW MEDICAL CITY PROJECT,
Substructure Works Ortigas, Pasig City EEI Corporation, Inc.
Rebar Fabrication & Installation
Formworks (Aluma Forms)