company presentation september 2012. established 1996 the company began working in the construction...
TRANSCRIPT
Company PresentationSeptember 2012
Established 1996 the company began working in the construction and installation, adjustment and start-up fine-grain and medium-grade mills, field and has successfully completed numerous projects.
Mission Statement
Office Presence
Worldwide installation base in over 10 sitesGeorgia, Itaq, Iran, Russia, Ukraina, Azerbaijan,Syria,Jordan,Saudi Arabia,Kazakhistan
Strategic Partners
UTA at a glance
Our goal is to provide maximally high level service, so our partners could feel themselves totally secured and feel that they are working people with dignity.
UTA.COMPANY: Director Petre Beria,ADDRESS:Georgia.00164.9.Z.Chavchavadze . CITY: TBILISI, GEORGIA http://www.utacompany.ge
• JSC- GEORGIAN STEEL, B-PLAN- IRAQ/KURDISTAN,«GLOBE ENTERPRISES INC» USA,HALAWI INVESTMENT TRUST S.A.L.• BEIRUT, LEBANON,KIB- IRAQ,"VNIIMETMASH ", TOCHMET, RUSSIA; " MURAT MAKUNA ", TURKEY; " BACHCELY MAKYNA ",
TURKEY; "НKМY" UKRAINE; "DANYELL" ITALY; "ZDAK" CZECHIA
4
3
2
1
Refinery
Georgia UTA Portfolio
AGENDA
Description of present installation & capabilities
Financial Summary
• LocationSouth Caucasus, Southeast Europe, Southwest Asia
• Geographic position in extreme co-ordinatesNorth: 44oN / South: 41oN / East: 47oE / West: 40oE Borders (land )Russian Federation 723, Azerbaijan 322, Armenia 164, Turkey 252 (in total 1461 km )Borders (coastline )Black Sea 310 km
• Climate Continental inland, subtropical in the coastal region
Georgia
We believe in
Partnering with selected customers:• Adaptive business models• Developing POC’s for innovative services• Assure outstanding personal customer support• Establish long term relationships aligning
Roadmaps – ongoing process
Your vision is our work plan
Streamlining Operations & Resources
Multiple VendorsMultiple components
Multiple Operations & Management
Oil Refinery and multi used common Platform
Cross Technology Solution
Oil Refinery & CONSTRUCTION
PROJECTS
Supporting and Operation
Supporting Multi Vendors
components
Interoperability with all
infrastructure vendors
guaranteed
Supporting Hybrid multi Production
Whole of cycle
250 Thousand tons per year
Naphtha45 000 t.
Fuel Oil70 000 t.
Kerosene Diesel Oil
1. Petrol AH-922. Petrol AH-953. Liquefied Gas
45 Thousand tonsper year
1. Bitumen2. Diesel Oil3. Oil4. Black Oil
70 Thousand tonsper year
Primary Unit
The oil refining factory in Georgia, belonging Open privet Company " UTA “
Oil Refinery general description
This refinery contains two plants : Primary unit refines from crude oil to “Naphtha”. distillery of oil of atmospheric type and the block of processing low-octane The block of primary distillery of oil with reception virgin gasoline, Diesel. fuel and black oil. Second one refines “Naphtha” to get high octane Gasoline (petrol) АИ-95--- АИ-96 gasoline in high- octane - on technology «Ceoforming».
Oil Refinery capacity
Plant capacity 250 000 MMT up to 300 000 MMTOne can increase productivity for two times. System includes two columned. Diameter of columns -10000 mm Height- 9.2 Mt. Quantity of plates -22 pcs
Oil Refinery continue 1
The block of processing low-octane (virgin) gasoline high-octane without compounding and additions of antidetonators on technology «Ceoforming». Productivity up to 120-140 MMT / 24H
Productivity on raw material - 50 thousand ton/year. The basic products of process are: high-octane
gasoline АИ-92, АИ-95 - 60-65 %. Liquid gas - 33-28 %. Diesel fraction - 2 %. residual hydrocarbons - 5 %.
Received gasoline stable also satisfies to the international standards, namely the mintenance{contents}:
Sulfur-0,01 %. Benzol-1 %. Aromatic hydrocarbons - 35-40 %. Олефинов - 5-7 %. The technology «Ceoforming» is developed НИЦ
«Ceosit» ОИК the Siberian Branch of the Russian Academy of Science.
Block " Ceoforming " is supplied by computer management of process under the license of firm GE.
Oil Refinery continue 2
Required electro-energy is 400 kW/HourDelivery transformer is 1000 kW (1 mW)Required water for each part 200 m3 t = 30 C and 8 m3 for boiler Gasoline tanks and barrels are :
5ps – 2000 m31ps – 1000 m31ps – 500 m32ps – 3000 m3
Required electro-energy is 400 kW/HourDelivery transformer is 1000 kW (1 mW)Required water for each part 200 m3 t = 30 C and 8 m3 for boiler Gasoline tanks and barrels are :
5ps – 2000 m31ps – 1000 m31ps – 500 m32ps – 3000 m3
Performance attributes
Manufactures production
The second plant produces (Reprocesses “Naphtha”) high-octane petrol corresponding to Euro Standards
AH-92 60% FinishedProducts V
AH-95 30% FinishedProducts V
Liquefied gas 2% Finished
Products V
The first factory manufactures production of Crude Oil.
Naphtha 18% half-made production
Kerosene 6% finished products
Diesel Oil 48% finished productsFuel Oil, Mazut 28% finished products
Capacity ability of metal content (molybdenum , tungsten, ) 60%
H2S 10-12%Katalizator ИК-30-1 ISO 2005 (Euro standard)Date of design 2002 yearDesign(USA) and built by German and Russian
specialists.Country of factory Austria, Hungary, Russia, Germany,
USA, Japan
Technical Data
UTA can supply and implementation modular oil refinery flexibility depending:
Depending Request from potential customer. UTA can relocation and operation oil refinery. UTA will be planning refinery depends: Volume, “end product requirement “, type of crud oil…. Following our opinions we can supply 3 deferent type of refinery. The cost will be specified and depends customer requests.
Financial Summary