TORONTO TRANSIT COMMISSION
REPORT NO.
MEETING DATE: January 12, 2011
SUBJECT: 2011 WHEEL-TRANS OPERATING BUDGET
ACTION ITEM RECOMMENDATION It is recommended that the Commission: 1/ Approve the 2011 Wheel-Trans Operating Budget (presentation attached) as described
in this report, and
2/ Note that the 2011 Wheel-Trans Operating Budget includes an increased subsidy requirement of $8,300K as summarized below:
Expenditures $96,500 Revenues (5,500)Subsidy Required $91,000 2010 Approved City Operating Subsidy 82,700 Additional Subsidy Required $ 8,300
3/ Note that the Wheel-Trans Service Plan encompasses the following key factors:
Eligibility Criteria and Application Process remain unchanged
Active registrant base increasing by 12% to 44,800
Trips increasing to 2.9 million
Accommodating 98% of trips
Further integration with the conventional transit system
Community Bus routes remain at five (5)
Implementing scheduling enhancements
Operating Budget Workforce increasing by 2 to a year-end complement of 531
The service area does not increase beyond the City of Toronto boundaries
No impact from AODA Transportation Standards until 2012 4/ Forward this report to the City of Toronto requesting approval of the required 2011
Operating Subsidy for Wheel-Trans, and 5/ Forward this report to the TTC’s Advisory Committee on Accessible Transportation
2011 WHEEL-TRANS OPERATING BUDGET Page 2
(ACAT) for information, and 6/ Forward this report to the Ontario Minister of Transportation, the Ontario Minister of
Energy and Infrastructure, and the Ontario Minister of Finance, for information, and 7/ Forward this report to the Federal Minister of Transport, Infrastructure, and
Communities, for information. FUNDING The Wheel-Trans Operating Budget for 2011 requires funding in the amount of $91 million which is necessary to meet the anticipated demand for service of 2.9 million trips. The 2011 Operating Budget and Service Plan assumes continuation of the eligibility criteria and application process, trip origins and destinations remaining relatively constant, sedan taxi meter rates remaining unchanged from the last increase in 2010 plus improved vehicle reliability. At the requested level of funding, Wheel-Trans will accommodate 98% of the anticipated demand using TTC buses and accessible and sedan taxis. Factors contributing to the 2011 funding request increase of $8.3 million include $6.2 million for increased service due to demand growth; $1.0 million for increased employee benefits; $0.4 million related to the full year impact of the HST; further increase in labour costs of $0.3 million relating to the full year impact of the April 1, 2010 wage increase; $0.2 million for telephone cost related to vehicle tracking; $0.2 million to assess customer applications; other net changes of $0.4 million; a decrease in post retirement/accident claims non-cash expenses which was established by the City as an additional long-term receivable of $0.4; offset by increased revenues of $(0.8) million. A presentation of the 2011 Wheel-Trans Budget and Service Plan was made to members of the Advisory Committee on Accessible Transportation (ACAT). They endorsed the business plan and budget. SUMMARY The 2011 Wheel-Trans Operating Budget and Service Plan have been developed to address an increasing demand for service and to ensure a balance between trip availability and service quality. Wheel-Trans staff will continue to implement service quality and efficiency improvements while being sensitive to customer needs.
- - - - - - - - - - - - January 11, 2011 18-15-15 Attachment: 2011 Wheel-Trans Operating Budget Presentation
WHEELWHEEL--TRANSTRANS2011 BUDGET2011 BUDGET
BILL FROSTBILL FROST
GENERAL SUPERINTENDENTGENERAL SUPERINTENDENT
JANUARY 10, 2011JANUARY 10, 2011
Wheel-Trans
2011 Budget Presentation1
INCREASING TRIP DEMANDINCREASING TRIP DEMAND
2.3 M 2.4 M 2.9 M
20092009 20102010 20112011
GROWTHGROWTH %% 4.5 12.5 19.1
2.4 M
2.7 M
- BUDGET - ACTUAL
Wheel-Trans
2011 Budget Presentation2
2010 WHAT HAPPENED?2010 WHAT HAPPENED?
$Millions$Millions
-- Demand increase of 304,600 trips vs. budgetDemand increase of 304,600 trips vs. budget 6.36.3
- Post retirement non-cash benefits & accident claims 0.4
- Impact of HST 0.3
- Savings on Bus service (fuel, repairs, RST rebate) (2.9)
- Labour Savings (1.7)
- Reduction in spending (0.7)
- Increased Revenue (0.3)
1.4
- Demand increased 12% over budget; however, combined with
financial constraints, cost increased by $1.4 Million vs. budget
Wheel-Trans
2011 Budget Presentation3
BUDGET CHALLENGESBUDGET CHALLENGES
19% Demand increase (Budget to Budget)
Registration base increase 12% (to 44,800*)
Maintain budgeted unaccommodated rate @ 2%
Implementing New Scheduling System
Implementing AVL/GPS technology
Dialysis trips for ambulatory customers increasing
Shifting trips to conventional transit
* Active registrants only
Improving
Productivity
Wheel-Trans
2011 Budget Presentation4
WHAT WE WANT TO ACHIEVE WHAT WE WANT TO ACHIEVE NEXT YEARNEXT YEAR
A reliable service to our customers
Incorporate new Friendly buses into the fleet
Integrate new Operators into existing workforce
Maintain our outstanding safety records
Maintain our favourable customer relations
Integrate the new systems fully
Achieve significant productivity improvements
Continue to move bookings away from the telephones
Improve Touch Tone system
Encourage customers to use internet
Always involve our employees
Wheel-Trans
2011 Budget Presentation5
2011 OPERATING BUDGET 2011 OPERATING BUDGET OVERVIEW OVERVIEW ($MILLIONS)($MILLIONS)
20102010BUDGETBUDGET
20112011BUDGETBUDGET
CHANGECHANGE
Expenses 88.6 97.3 8.7
Less: Post-Retirement / Accident Claims / Non-Cash Expenses
1.2 0.8 (0.4)
Net Expenses 87.4 96.5 9.1
Operating Revenue (4.7) (5.5) (0.8)
Net Operating Subsidy 82.7 91.0 8.3
Wheel-Trans
2011 Budget Presentation6
2011 EXPENSE VARIANCE2011 EXPENSE VARIANCE($MILLIONS)($MILLIONS)
Ridership Demand +6.2
Benefits +1.0
HST +0.4
Full Year Effect wage increase +0.3
Increased landline expense re AVL +0.2
Increased cost re Assessing new registrants +0.2
Other +0.4
TOTAL 8.7
Wheel-Trans
2011 Budget Presentation7
WORKFORCE CHANGESWORKFORCE CHANGESOPERATING (+2)OPERATING (+2)
2010 APPROVED2010 APPROVED 529529
CHANGES IN 2010CHANGES IN 2010 0
CHANGES IN 2011:CHANGES IN 2011:
SERVICESERVICE
Transportation
Operators
Productivity Improvements
7
(7)
Maintenance
Coach Technicians
Serviceperson, Wheels & Tires
1
1
TOTALTOTAL 531531
Wheel-Trans
2011 Budget Presentation8
DIALYSISDIALYSIS
• WT provides service to persons with mobility
issues: only exception is dialysis patients
• Number of dialysis customers growing at 10%
annually; few customers, but high trips
• Annual Change in trips (210,000)
• $5M in 2011
Wheel-Trans
2011 Budget Presentation9
Current Initiatives
All New Customers Provided Easier Access DVD
Newsletter Articles on Benefits of Conventional Transit
Subway Training Sessions
Same-Day Booking to Subway Stations
Internet Accessible Trip Planner
Link Lyndhurst to Sunnybrook
Variety Village Shuttle
WHEELWHEEL--TRANS INTEGRATION TRANS INTEGRATION WITH ACCESSIBLE TRANSIT WITH ACCESSIBLE TRANSIT
NETWORKNETWORK
Wheel-Trans
2011 Budget Presentation10
FUTURE INTEGRATION FUTURE INTEGRATION PLANSPLANS
WORK WITH ACAT TO:WORK WITH ACAT TO:
Refine Best Practices for Wheel-Trans
Integration
2010 – 2011
Review Eligibility Criteria as appropriate 2011 – 2012
Determine Trip Planning possibilities using
criteria identified above
2012 – 2013
Develop Travel Orientation Program with
conventional system
2012 – 2013
Commence Integration of Wheel-Trans
Scheduling System with TTC Trip Planner
2014