Comhairle Contae Maigh EoMayo County Council
PERMITTING OF ENERGY PROJECTS
A Local Authority Perspective
Iain DouglasSenior Planner
Engineers Ireland CPD Seminar 20/10/2014
Comhairle Contae Maigh EoMayo County Council
“May you live in interesting times”
• Gas Terminal
• Onshore/Offshore Gas pipelines
• BGE Pipeline Bellanaboy – Galway
• Windfarms Non-SID & SID
• Biomass CHP Plant
• Electricity Transmission Lines Non-SID & SID
• 2 Gas Powered Peaking Plants
Comhairle Contae Maigh EoMayo County Council
“ Its complicated…. “
• Mayo County Council• An Bord Pleanala• Health & Safety Authority• Environmental Protection Agency• DCNER• CER• NPWS• DoEHLG
to name but a few !!
Comhairle Contae Maigh EoMayo County Council
Where do you go to get planning permission ?
• An Bord Pleanala - Major energy projects SID• Electricity Transmission Lines• Strategic Gas Pipelines• Section 1 - Seventh Schedule P&D Act
• Local Authorities• Any energy project not SID
• Exempt Development - No permission required• Electricity Distribution Lines• Domestic renewable energy technologies
Comhairle Contae Maigh EoMayo County Council
Applications to the Local Authority
• Planning & Development Acts 2000-2014• Planning & Development Regulations 2001-2014
• EIA Directive 2011/92/EU (as amended)
• Habitats Directive 92/43/EEC
• Birds Directive 79/409/EEC
Comhairle Contae Maigh EoMayo County Council
Planning & Development Regulations 2001-2014
• Part 4 – Control of Development• Documentation with Application
• Part 10 Environmental Impact Assessment
• Part 18 Strategic Infrastructure Development
• Part 20 Appropriate Assessment
Comhairle Contae Maigh EoMayo County Council
• Schedule 5 – Development requiring EIA
• Schedule 6 – Information to be contained in an EIS
• Schedule 7 – Criteria for significant effects
Comhairle Contae Maigh EoMayo County Council
The Planning Application
• Pre-Planning Meeting Request - Section 247• Formal – Minuted/Recorded available after
application lodged• Regulations• Development Plan Objectives• Requirement for Sub-threshold screening
• Map/Drawing scales – Large projects usually need variation • Fees
Comhairle Contae Maigh EoMayo County Council
Environmental Impact Assessment
• EIA Directive 2014/52/EU - amendment to original
• Environmental Impact Assessment Report
• Reasoned Conclusion by competent authority
• Reasoned Conclusion integrated into decision
• Changes to form & content of Schedules 6 & 7
Comhairle Contae Maigh EoMayo County Council
Environmental Impact Assessment
• EIA for Energy Projects – Schedule 5 P&D Regs.• Part 1 EIA Mandatory• Part 2 Mandatory with thresholds
• Screening also for sub-threshold energy projects
• Option to request for scoping of EIS (EIAR) from LA Article 95 P&D Regs.
Comhairle Contae Maigh EoMayo County Council
Appropriate Assessment
• Article 6(3) Habitats Directive 92/43/EEC
• Separate & Distinct from EIA • Natura 2000 Sites• Conservation Objectives
• Adverse impact on Natura 2000
• IROPI (Imperative Reasons of Over-riding Public Interest)
Comhairle Contae Maigh EoMayo County Council
Appropriate Assessment
Stage 1Screening
Stage 2AA
Stage 3Alternatives
Stage 4IROPI
• Significant effects “likely”, “possible”, “uncertain”
• In combination with other projects
• AA required – carried out by Local Authority
• Developer submits NIS (Natura Impact Statement)
Comhairle Contae Maigh EoMayo County Council
Planning Application Process
• Severe Time constraints on LA
• Decision within 8 weeks EIA & Non-EIA
• If FI requested - 8 weeks EIA & 4 weeks Non-EIA
• Applicant has 6 months to reply to FI + option of further 3 months if requested within the initial 6 month period
Comhairle Contae Maigh EoMayo County Council
• Exception if Major Accidents Directive applies Time stops until HSA advice is received then 4 weeks
• 3rd Party Submissions available during process
• Planning Report for EIA development – EU Court Case C-50/09 Planning
EIAAA
• Planning decision – Executive Function
Comhairle Contae Maigh EoMayo County Council
Even then it is not finished !!
• Post permission monitoring:-
• Most large scale projects will have a PMC (Project Monitoring Committee)• LA• Developer• Community• Relevant Statutory Agencies
Comhairle Contae Maigh EoMayo County Council
• Corrib Gas Project currently has 4 PMCs• Terminal - MCC• On-shore Pipeline – DCNER• Off-shore Pipeline – DCNER (S40 Consent)• Foreshore Licence – DoECLG
Comhairle Contae Maigh EoMayo County Council
Some Closing Thoughts
• Plan for the long haul
• Consult early & often with • LA• Community• Statutory Agencies
• EIS & NIS the best that they can be
• Develop a Community Benefit mentality & Scheme as part of EIS