combined-cycle hrsg shutdown, layup, and startup chemistry control -power

15
This site is best viewed with Internet Explorer 10, Firefox or Google Chrome. Please consider upgrading. × VIDEO WEBCASTS SUPPLIERS DIRECTORY EVENTS MAGAZINE HOME BOILERS COAL GAS RENEWABLES NUCLEAR ONSITE POWER O&M EMISSIONS BUSINESS WATER TREATMENT NEW PROJECTS ABOUT US ADVERTISE BLOGS CLASSIFIED ADS CONTACT US CURRENT ISSUE EVENTS MAGAZINE MOBILE NEWSLETTERS PAST ISSUES POWER GENERATION COMPANY NEWS PRODUCT SHOWCASE SPONSOR VIDEO CHANNEL SUBMIT AN ARTICLE SUBSCRIBE SUPPLIER SHOWCASE SUPPLIERS DIRECTORY TOPIC INDEX WEBCASTS WHITE PAPERS BOILER CONTROL SYSTEMS BURNER & COMBUSTION SYSTEMS GAS POLICY & REGULATION STEAM UPGRADES COAL RETROFITS & UPGRADES COAL NEW PROJECTS COAL O&M COAL EMISSIONS CONTROL COAL EQUIPMENT CLEAN COAL TECHNOLOGIES GAS RETROFITS & UPGRADES GAS NEW PROJECTS COMBINED CYCLE GAS O&M GAS EMISSIONS CONTROL GAS EQUIPMENT WIND SOLAR HYDROELECTRIC BIOMASS GEOTHERMAL MARINE REACTORS RETROFITS & UPGRADES WASTE MGMT. & DECOMMISSIONING NUCLEAR O&M NUCLEAR EQUIPMENT NPI LATEST ISSUE DIESEL & GAS ENGINES SOLAR COGENERATION WIND POLICY & REGULATION PLANT AUTOMATION PLANT OPTIMIZATION SAFETY & PROTECTION INSTRUMENTATION & CONTROLS TESTING PUMPS & VALVES O&M RETROFITS & UPGRADES AIR POLLUTION CONTROL EQUIP. & SERVICES DIAGNOSTICS & TESTING WATER TREATMENT EQUIPMENT & SERVICES ENERGY EFFICIENCIES EMISSIONS REGULATION FINANCIAL ENVIRONMENTAL BUSINESS POLICY M&A CONTRACTS & PROJECTS PERSONNEL-STAFFING PROJECT MANAGEMENT BUSINESS REGULATION COOLING WATER TECHNOLOGIES POLICY & REGULATION WATER TREATMENT WATER USAGE COAL GAS RENEWABLES NUCLEAR EMISSIONS BUSINESS POWER ENGINEERING Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control 08/01/2012 By Brad Buecker, Contributing Editor, and Dan Dixon, Project Engineer, Lincoln Electric System Damage that can occur in steam generators due to in-leakage of contaminants during normal operation is a subject of much discussion. However, very serious damage is possible in systems that cycle on and off but are not shut down, laid-up or started up properly. Combined-cycle plants are particularly susceptible to these problems because of typical numerous startups and shutdowns. This article examines the most important issues with regard to off-line chemistry. Oxygen is the Darth Vader of Poor Layups Home More Coal Industry News Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control Page 1 of 15 Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin... 7/26/2015 http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Upload: shameer-majeed

Post on 12-Jul-2016

51 views

Category:

Documents


20 download

DESCRIPTION

Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

TRANSCRIPT

Page 1: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

This site is best viewed with Internet Explorer 10, Firefox or Google Chrome. Please consider upgrading.×

• VIDEO

• WEBCASTS

• SUPPLIERS DIRECTORY

• EVENTS

• MAGAZINE

•HOME

•BOILERS

•COAL

•GAS

•RENEWABLES

•NUCLEAR

•ONSITE POWER

•O&M

•EMISSIONS

•BUSINESS

•WATER TREATMENT

•NEW PROJECTS

◦ ABOUT US

◦ ADVERTISE

◦ BLOGS

◦ CLASSIFIED ADS

◦ CONTACT US

◦ CURRENT ISSUE

◦ EVENTS

◦ MAGAZINE

◦ MOBILE

◦ NEWSLETTERS

◦ PAST ISSUES

◦ POWER GENERATION COMPANY NEWS

◦ PRODUCT SHOWCASE

◦ SPONSOR VIDEO CHANNEL

◦ SUBMIT AN ARTICLE

◦ SUBSCRIBE

◦ SUPPLIER SHOWCASE

◦ SUPPLIERS DIRECTORY

◦ TOPIC INDEX

◦ WEBCASTS

◦ WHITE PAPERS

◦ BOILER CONTROL SYSTEMS

◦ BURNER & COMBUSTION SYSTEMS

◦ GAS

◦ POLICY & REGULATION

◦ STEAM

◦ UPGRADES

◦ COAL RETROFITS & UPGRADES

◦ COAL NEW PROJECTS

◦ COAL O&M

◦ COAL EMISSIONS CONTROL

◦ COAL EQUIPMENT

◦ CLEAN COAL TECHNOLOGIES

◦ GAS RETROFITS & UPGRADES

◦ GAS NEW PROJECTS

◦ COMBINED CYCLE

◦ GAS O&M

◦ GAS EMISSIONS CONTROL

◦ GAS EQUIPMENT

◦ WIND

◦ SOLAR

◦ HYDROELECTRIC

◦ BIOMASS

◦ GEOTHERMAL

◦ MARINE

◦ REACTORS

◦ RETROFITS & UPGRADES

◦ WASTE MGMT. & DECOMMISSIONING

◦ NUCLEAR O&M

◦ NUCLEAR EQUIPMENT

◦ NPI LATEST ISSUE

◦ DIESEL & GAS ENGINES

◦ SOLAR

◦ COGENERATION

◦ WIND

◦ POLICY & REGULATION

◦ PLANT AUTOMATION

◦ PLANT OPTIMIZATION

◦ SAFETY & PROTECTION

◦ INSTRUMENTATION & CONTROLS

◦ TESTING

◦ PUMPS & VALVES

◦ O&M RETROFITS & UPGRADES

◦ AIR POLLUTION CONTROL EQUIP. & SERVICES

◦ DIAGNOSTICS & TESTING

◦ WATER TREATMENT EQUIPMENT & SERVICES

◦ ENERGY EFFICIENCIES

◦ EMISSIONS REGULATION

◦ FINANCIAL

◦ ENVIRONMENTAL

◦ BUSINESS POLICY

◦ M&A

◦ CONTRACTS & PROJECTS

◦ PERSONNEL-STAFFING

◦ PROJECT MANAGEMENT

◦ BUSINESS REGULATION

◦ COOLING WATER TECHNOLOGIES

◦ POLICY & REGULATION

◦ WATER TREATMENT

◦ WATER USAGE

◦ COAL

◦ GAS

◦ RENEWABLES

◦ NUCLEAR

◦ EMISSIONS

◦ BUSINESS

POWER ENGINEERING

Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control

08/01/2012

By Brad Buecker, Contributing Editor, and Dan Dixon, Project Engineer, Lincoln Electric System

Damage that can occur in steam generators due to in-leakage of contaminants during normal

operation is a subject of much discussion. However, very serious damage is possible in systems that

cycle on and off but are not shut down, laid-up or started up properly. Combined-cycle plants are

particularly susceptible to these problems because of typical numerous startups and shutdowns.

This article examines the most important issues with regard to off-line chemistry.

Oxygen is the Darth Vader of Poor Layups

Home More Coal Industry News Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control

Page 1 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 2: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Both conventional and heat recovery steam generators (HRSG) are a complex maze of waterwall

piping, superheater and reheater tubing, boiler drums, and other equipment. When a unit is taken

off-line due to reduced load requirements or other issues, the water inside the circuits contracts in

volume. This volume reduction induces a slight vacuum within the system, which in turn draws in

outside air. Now, a stagnant condition with oxygen saturation, at least at water-air interfaces, has

been established.

Oxygen attack can be extremely serious for several reasons. The corrosion mechanism itself can

induce severe metal loss in those areas of high oxygen concentration.

The attack often takes the form of pitting, where the concentrated corrosion can cause through-wall

penetration and equipment failure in a short period of time. Also of major importance is that off-line

oxygen attack will generate corrosion products that then carry over to the steam generator during

startups. Deposition of iron oxides in the waterwall tubes leads to loss of thermal efficiency and,

most importantly, establishes sites for under-deposit corrosion. These mechanisms may include the

very insidious hydrogen damage, [1] acid phosphate corrosion in improperly treated units, and

caustic gouging.

Oxygen corrosion in a steam generator tube.

Source: www.power-eng.com.

Page 2 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 3: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Another method by which oxygen can infiltrate steam generators is at startup when stored

condensate or fresh demineralized water is needed for filling or boiler top-off. Quite often, high-

purity water is stored in atmospherically-vented storage tanks. The water absorbs oxygen and

carbon dioxide, and may even become saturated with these chemicals. When the makeup is injected

into a cold steam generator, additional attack will occur.

Nitrogen Blanketing at Terry Bundy

At the Lincoln Electric System (LES) Terry Bundy combined-cycle plant, utility personnel have

implemented several of the most effective techniques to prevent oxygen ingress and corrosion. We

will examine these techniques plus some alternatives that can also be effective.

First and foremost is nitrogen blanketing during the last stages of shutdown and subsequent short-

term layups. Experience has shown that introduction of nitrogen to key points in the system before

the pressure has totally decayed will minimize ingress of air. Then, as the system continues to cool,

only nitrogen enters, not oxygen-laden air. Key points for nitrogen protection in HRSGs include the

evaporator, economizer, and feedwater circuits.

At Terry Bundy, primary power is produced by two GE LM 6000 combustion turbines and two Nooter-

Eriksen dual pressure HRSGs (no reheat) feeding a 26 MW steam turbine. Feedwater conditioning is

all-volatile treatment oxidizing [AVT(O)], with ammonium hydroxide injection to maintain feedwater

pH within a range of 9.6 to 10. High-pressure evaporator chemistry is based on EPRI’s phosphate

continuum guidelines, with tri-sodium phosphate as the only phosphate species and control within

a 1 to 3 parts-per-million (ppm) range. The HP evaporator pH control range is 9.5 to 10. Free caustic

concentrations are maintained at or below 1 ppm to minimize the risk of caustic gouging.

Following early operation of the combined-cycle units, plant personnel discovered oxygen pitting in

one of the high-pressure evaporators. The first step to mitigate this issue was installation of a

nitrogen blanketing system in 2005. One question that often arises is how best to store or generate

nitrogen. Certainly it can be provided from nitrogen bottles provided by local gas-supply or welding

firms, and liquid nitrogen is another possibility. LES personnel selected a different method, nitrogen

generation via a pressure-swing adsorption (PSA) system.

The process utilizes a carbon molecular sieve (CMS), which, when compressed air is introduced at

high pressure, adsorbs oxygen, carbon dioxide, and water vapor, but allows nitrogen to pass

through. Obviously, the nitrogen can then be collected in receivers for use as needed. At a pre-

selected interval, pressure is released from the unit allowing O2, CO2, and H2O to desorb from the

material, at which time these gases are vented off to the atmosphere. The table below outlines

nitrogen purity from this system as a function of production rate.

Page 3 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 4: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

The Terry Bundy N2-generator applies nitrogen, at a pressure of 5 psig, to the LP and HP drums

during wet layups, and the nitrogen is utilized to “push” water from an HRSG during dry layup

draining. A nitrogen pressure of 5 psig is maintained during the dry layup, provided no major tube

work is required. An obvious major concern with nitrogen blanketing, and the reasoning behind its

rejection at some plants, involves safety. Of course, elemental nitrogen is not poisonous, as it

constitutes 78 percent by volume of our atmosphere. However, an individual who enters a confined

space where nitrogen has not been purged may pass out nearly instantaneously due to lack of

oxygen. Death can occur within minutes.

An alternative to pressure swing adsorption is gas separation by membrane technology. In these

systems, compressed air flows along specialty hollow fiber membranes. The material allows oxygen

and water to pass through each membrane, but N2 does not penetrate and can be collected at an

outlet port. The literature indicates that this process can produce 99.5 percent pure nitrogen.

Another important point with regard to wet layup chemistry is periodic water circulation. This

minimizes stagnant conditions that can concentrate oxygen in localized areas to cause pitting.

Both Terry Bundy HRSGs have circulating systems installed on the high-pressure and low-pressure

circuits for use during wet layups. Each circuit utilizes one of two redundant pre-heater recirculation

pumps, which normally are in service during HRSG operation to mitigate acid dew point corrosion of

external circuits. Each pump provides approximately 100 gpm of flow per circuit. Valves and piping

have been added to provide to allow for seamless transition from layup circulation to normal

operation. Sample/injection systems are available to allow operators to test the layup chemistry for

pH and dissolved oxygen (using colorimetric ampules), and to inject ammonium hydroxide if the pH

needs to be raised. Also, modifications made in each boiler drum allow the layup water to bypass

the drum baffle, promoting circulation and minimizing short-circuiting via the downcomers. The

pumps are typically started once drum pressure is less than 50 psig, and remain in service for the

duration of the layup.

Page 4 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 5: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

A PSA nitrogen generator.

Source: www.balstonfilters.com

Dissolved Oxygen Removal from Condensate and Makeup Water

Very often, demineralized water is stored in atmospherically-vented storage tanks. Thus, oxygen-

laden water enters the steam generator during normal operation and even more critically during

boiler filling operation. In the latter case, the influx of cold, oxygen-saturated water can cause

severe difficulties. A possible method to minimize this problem is to limit oxygen ingress to storage

tanks, but this is typically a difficult proposition. Terry Bundy personnel selected another gas

transfer membrane technology to treat condensate return and makeup water.

The process is similar to the gas-gas transfer membrane process outlined above, but in this case the

carrier is water. As the liquid flows along the hollow fiber membranes in the vessel, gases pass

through the membrane walls but the water is rejected. The technology is capable of reducing

dissolved oxygen concentrations to less than 10 parts-per-billion (ppb). Most importantly, the

system eliminates introduction of air-saturated makeup (where the oxygen concentration may be

7.5 ppm, which is 75 times the recommended limit) during boiler fills.

Don’t Forget the Steam Turbine

Page 5 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 6: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

During my (author Buecker) 30-plus years in or affiliated with the power industry, I have seen many

instances where the condenser hotwell was allowed to remain moist, or even contain standing

water, during outages where the condenser vacuum was broken and air entered the condenser and

LP turbine. The combination of a moist-laden atmosphere and the salt deposits that collect on LP

turbine blades during routine operation can be quite damaging. Pitting and stress corrosion

cracking (SCC), two very harmful mechanisms, are two of the potential outcomes.

A very practical method to combat this corrosion, and one that has been adopted at Terry Bundy, is

desiccated air injection to the condenser during all but short-term layups (<72 hours).

This system is capable of providing 700 standard cubic feet per minute (SCFM) of 100oF air at 10

percent humidity to the condenser and low-pressure turbine. This flow can lower the relative

humidity from nearly 100 percent to less than 30 percent in just a few hours.

Results

In 2005, drum inspections showed significant pitting. It was after this inspection that the changes

outlined above were implemented. A repeat inspection in 2008 showed no new pitting.

Iron level monitoring, via particulate collection on 0.45-micron filters showed a significant decrease

in samples from the condensate pump discharge (CPD) and both LP and HP drums. Quicker startups

are now commonplace. Main steam cation conductivity drops to within the recommended guideline

(0.2 µS/cm) up to 1.5 hours sooner, and CPD cation conductivity consistently remains below 0.1

µS/cm, whereas in the past it might climb as high as 0.45 µS/cm. Of significant importance is that

the units can be left in wet layup for extended periods, which saves the plant six hours (over dry

layup) to reach full load per a dispatchers request.

References

1. Cycle Chemistry Guidelines for Shutdown, Layup and Startup of Combined Cycle Units with Heat

Recovery Steam Generators, EPRI, Palo Alto, CA: 2006, 1010437.

Page 6 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 7: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Fuel Tech receives air pollution control contracts worth $3.6Mn

Fuel Tech Inc. has received multiple air pollution control (APC) contracts, worth approximately $3.6 million, from customers in China, Europe and the U.S.

Duke Energy completes ash excavation at W.S. Lee Steam Station

Duke Energy (NYSE: DUK)has submitted filings, to state regulators, outlining additional ash excavation plans for its W.S. Lee Steam Stationin Belton, South Carolina.

Missouri nuclear power plant expected to reopen soon

Ameren Corp.'s nuclear power plant in mid-Missouri is expected to reopen later Friday, a day ...

VIDEO: SCE&G places CA01 module at Summer nuclear plant

South Carolina Electric & Gas Co. (SCE&G) and its project partners placed a 2.4-milli...

Latest News

Dynamic Fluoride Ion Cleaning of IGT Parts

Everyone Friends

Products Showcase

RELATED ARTICLES

Recent user activity on Power Engineering:

Richard Goodwin shared:

Iran lawmakers said to need at least 60 days for nuke

deal :"ran's par…

Sat Jul 25 2015

arthur zhuo commented on:

Selecting the Right Pumps and Valves for Flue Gas

Desulfurization :"L…

Wed Jul 22 2015

Hoppy Hotchkiss commented on:

FPL plans to add new 1,600-MW combined-c

power plant :"NextEr…

Sat Jul 18 2015

Page 7 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 8: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Court upholds commission's OK of plan to use trash for power

A state appellate court has upheld the Arizona Corporation Commission's approval of an electr...

Massachusetts Senate passes bill to prep for climate change

The Massachusetts Senate has approved a bill supporters say will help the state better adapt ...

Commission expects no major Michigan power shortfall in 2016

The Michigan Public Service Commission says it's unlikely there will be a significant power s...

Colorado officials ready for new carbon emission air rules

Colorado officials say they're ready for an expected EPA rule by next month that would requir...

Mississippi delegation attacks carbon dioxide limits

All members of Mississippi's congressional delegation say new federal carbon dioxide reductio...

The Dynamic Fluoride Ion Cleaning (DFIC) Process from Hi-Tech Furnace Systems is able to clean deep, narrow cracks of oxides by cycling between negative, atmospheric, and positive pressure.

ARCHIVED ARTICLES

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013

TOP BLOG POSTS

CSAPR the unfriendly EPA rule

Control Solutions

CNG is key for Oklahoma's Energy Future

Seizing the Opportunity

EPRI discusses implications of 316(b)

Obama pushes for Smart Grid

Power Engineering Look Inside >

Cover

Page 8 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 9: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Weekly Coal Production Report

The Weekly Coal Production Report has been updated for the week ended July 18, 2015.

MORE POWER GENERATION NEWS

POWER ENGINEERING CURRENT ISSUE

V I E W T H I S I S S U E

V I E W A R C H I V E S

Navigating the Stormy Seas of Today's Power Grid

Power Gen Emergency Response Solutions

ASME and EuroNorm Compared for HRSG Design

Study and Design Considerations of HRSG Evaporators in Fast Start Combined Cycle Plants

Cycling Tolerance - Natural Circulation Vertical HRSGs

Application of CFD Modeling in HRSG Evase Design

Current Digital Issue

Featured Whitepaper

03/01/2014 Volume 118, Issue 3

Page 9 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power Engin...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 10: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Return on Investment Analysis: The Economics of Regular Condenser Maintenance

Innovations in Cleaning Technology for Condensers: Case Studies

MORE WHITEPAPERS

BUYERS GUIDE CATEGORIES

Equipment rental

Heaters

clothing

repair

Prev 1 2 3 4 5 6 7 8 9 10 Next

BUYERS GUIDE PRODUCT LISTINGS

Predictive MaintenanceIPS field service technicians use state-of-the-...

Mitsubishi Gas Turbines

GenerationHub Quarterly Market Update: August 2015

( 08/26/2015 / 11:00 AM

Speakers Gary D. MooneyMichael J. Roush II, P.E.Richard MunsonTony HabibTyler Littler

Coal Ash Management & Storage

Speakers Kent Knutson

TransmissionHub Quarterly Market Update: June 2015

Webcasts

Page 10 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power En...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 11: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

MORE BUYERS GUIDE PRODUCT LISTINGS

Mitsubishi's advanced turbine technology includ...

Condition MonitoringTIGER® Monitoring System automates the knowledg...

Turbine Services LimitedTurbine Services Limited, a wholly owned subsid...

BUYERS GUIDE COMPANY LISTINGS

Caterpillar Power Plants

TEi Construction Services

Inc

Tech Development

Tower Performance Inc

Prev 1 2 3 4 5 6 7 8 9 10 Next

European Energy Transition – Embracing the Opportunity of Change

Speakers Kent KnutsonWayne BarberBarry Cassell

Power Generation Quarterly Market Update-Presented by GenerationHub

Speakers Gary E. FischerAnthony LaPorte

The Total Condenser Performance Workshop™: Leak Detection

Speakers Sue Briggum

Navigating the EPA’s New Coal Combustion Regulations

Speakers Connie SeniorRob Broglio

Emissions Control: Understanding your Options

MORE WEBCASTS

Power Industry Wire News

Page 11 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power En...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 12: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Magnum Hunter Resources Announces Dismissal of Last Remaining Stockholder Lawsuit

Magnum Hunter Resources Announces Dismissal of Last Remaining Stockholder Lawsuit

FLIR Systems Announces Second Quarter 2015 Financial Results

FLIR Systems Announces Second Quarter 2015 Financial Results

SEACOR Holdings Announces Results for Its Second Quarter Ended June 30, 2015

SEACOR Holdings Announces Results for Its Second Quarter Ended June 30, 2015

Northwest Pipe Company's Water Transmission Group Awarded Section 15-2 of the Integrated Pipeline Project

Northwest Pipe Company's Water Transmission Group Awarded Section 15-2 of the Integrate...

California ISO Hosts Global Forum in Support of Clean Energy Vision

California ISO Hosts Global Forum in Support of Clean Energy Vision

MORE WIRENEWS

Court upholds commission's OK of plan to use trash for power

Commission expects no major Michigan power shortfall in 2016

Environmental groups ask judge to dismiss part of Duke suit

United States could slip from top tier of nuclear leaders, speakers warn conference

EDITORS PICKS

People who read this article also read the following:2D high-harmonic spectroscopy sees multiple molecular orbitalsFiber versus CO2 laser cutting

Page 12 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power En...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 13: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Remineralization confusion... runs rampant in my mind. Where do I begin?The dental assistant’s guide to dental equipment maintenanceFive keys to successful PoE deployment

POWER ENGINEERING

TOPIC INDEX

View Power Engineering articles by topic, A-Z

Article Archives for Power Engineering Magazine

BUYERS GUIDE

• Categories• Companies• Products• Applications• Complete plant supply• Boilers• Valves• Finance and investment• Instruments, measuring• Component supply and manufacture• Air pollution control services• Monitoring equipment

MORE BUYERS GUIDE LISTINGS >>

CONTINUING EDUCATION

Professional Development Hours

To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

• View All

Page 13 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power En...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 14: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

� � � �

Contact Us

Advertising

UTILITY

Current Issue

Online Archives

Register

Login

RESOURCES

Copyright © 2007-2014. PennWell Corporation, Tulsa, OK. All Rights Reserved.    PRIVACY POLICY | TERMS AND CONDITIONS

• Balance of Plant• Coal-Fired Generation• Emissions Control• Gas-fired Generation• Hydro• Nuclear• Renewables• Rotating Machinery• Steam Generation

LATEST ENERGY JOBS

Power Generation Technician – Terror

Lake Hydroelectric FacilityKodiak Electric Association, Inc.

Country: United States

POSITION DUTIESKodiak Electric Association

(KEA) is seeking to fill the position of Power

Generation Technician at the Terror Lake

Hydroelectric Facility on Kodiak Island. This full-time position is responsible for servicing,

repairing, maintaining, and operating remote

generators and equipment at a...

View more Job Listings >>

Page 14 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power En...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...

Page 15: Combined-Cycle HRSG Shutdown, Layup, And Startup Chemistry Control -POWER

Subscribe

About Us

PennWell EventsPennWell Websites

RSS Feeds

Buyer's Guide

Videos

Forgot Password

Site Map

Boilers

Coal

Gas

Renewables

Nuclear

Onsite Power

O&M

Emissions

Business

Water Treatment

New Projects

Topic Index

TOPICS

HydroWorld

Renewable Energy World

COSPP

TransmissionHUB

GenerationHUB

PennEnergy

Nuclear Power International

Power Engineering

Power Engineering International

PENNWELL POWER SITES

Page 15 of 15Combined-Cycle HRSG Shutdown, Layup, and Startup Chemistry Control - Power En...

7/26/2015http://www.power-eng.com/articles/print/volume-116/issue-8/features/combined-cycle-hrs...