coating inspection techniques: visual and nondestructive ...corrosionshortcourse.com/2017...
TRANSCRIPT
Coating Inspection Techniques: Visual and Nondestructive Testing
Pipeline Coatings Course 2017
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 – SME 1
Period 3
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 2
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
• Visual
• Nondestructive Testing
• Destructive Testing
Main Inspection Categories
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 3
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Subcategories • Prior to start • Substrate • Mixing • During/after application
Main Inspection Categories
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 4
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
VISUAL INSPECTION
• Prior to Start • Substrate Reviews
• Mixing • Application
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 5
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Review Specs and Data Pages (Inspection Scope)
• QC/QA Requirements • Stop Work Authority • Hold Points • Documentation
Requirements
Visual Inspection – Prior to Start
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 6
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to Start Review Specs and Data Pages (Coating Scope)
• What is included? – Transitions – Stripe coat – Mock-up or test plates? Why?
• Restrictions different from manufacturer
• Hold points • Repair/touch up procedure • Salt limits
Why is this conversation important?...
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 7
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to Start
Simple Coating Project – Why Talk through products, transition points, temperature restrictions…before starting? NBD!
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 8
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to Start Regular Epoxy and Cold Temp… Still NBD
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 9
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to Start
Pits… getting a little more complicated, client/contractor decided on putty…
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 10
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to Start
And Top coat...
But now Clock Spring or Contour Wrap???
And Transitions….
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 11
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to Start
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 12
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to Start
Review Specs and Data Pages (Project Concerns)
• Temperature • Narrow recoat window • Short pot life • Humidity
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 13
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to Start
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 14
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Substrate Review
• Contaminants • Pitting • Difficult to detail areas
– Bolts, brackets, rivets – Sharp edges – Gaps
• Caulk/steel filler • Weld • Plates
(welds on next slide)
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 15
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Substrate Review
Good
But……
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 16
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Substrate Review
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 17
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Substrate Review • Welds (SPO 178)
– SPO 178 – Design, Fabrication, and Surface Finish Practices for Tanks and Vessels to Be Lined for Immersion Service
• (Plastic Weld Replica) – API 652, Linings of Aboveground Petroleum Storage Tank Bottoms
– Porosity – Undercut – Skip welds – Spatter – Sharp edges from grinding
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 18
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Substrate Review
Sample Mark-up
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 19
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to and During Mixing
Product Storage: • Temperature • Dates • Correct thinner • Components (ratios)
Mixing: • Correct paddle • Consistency • Color • Straining • Sweat/induction time
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 20
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection – Prior to and During Mixing
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 21
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Visual Inspection –During/Following Application
• Consistency in coverage • Finish • Color • Bubbles • Contaminants • Pinholes/misses • Hard to access
– Mirror/Lighting (NDT section)
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 22
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing • Visual • Environmental
Conditions • Substrate Reviews
• Mixing/Spray Prep • During/Following
Application
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 23
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Visual
• Mirrors
• Magnification
• Lighting (next slide)
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 24
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Visual
100 lumens of clean white light
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 25
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing – Environmental Conditions
• Surface and air temp • Relative Humidity
(hygrometers) • Data loggers
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 26
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate
Main surface prep factors: (overview) • Free of contaminants • Level of prep
(cleanliness) • Surface profile
Poor surface prep is estimated to cause 75-90% of coating failures
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 27
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate
Visible Contaminants – Solvent clean (SSPC SP 1)
• Many “solvents” • Before prep
Soluble salt testing (Following solvent clean)
– Many types of tests and types of salts.
– Know what is specified and what potential contaminants there might be
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 28
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate
Surface Prep (overview) Dry Methods
– Hand tool – Power Tool – Abrasive Blasting
Wet Methods – Waterjetting – Wet abrasive blasting
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 29
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate
Steel Condition: A intact mill scale B partially rusted mill scale C 100% rusted, no pits D rusted and pitted E paint mostly intact F zinc-rich paint G deteriorated paint over mill scale
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 30
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate Dry Prep:
Hand Tool (SSPC-SP 2) and Power Tool (SP 3) – Use VIS-3 – No profile specified – Solvent clean first (if visual contaminants) – Remove everything “loose”
• Hand – Chisel, wire brush, scraper • Power – Rotary, impact, power sander/abrader
– Dull putty knife
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 31
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate
Power Tool – 1 mil min profile – No magnification – SP 15 (Commercial Grade)
• Staining limited to 33%
– SP 11 (Bare Metal) • Shadows and staining only in
bottom of pits
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 32
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate
Abrasive Blasting – Use VIS 1
• Determine starting grade
– SP 7 (Brush off) – SP 14 (Industrial) – SP 6 (Commercial
Grade) – SP 10 (Near White) – SP 5 (White Metal)
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 33
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 34
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing - Substrate Profile (ASTM D4417) • Method A – Visual/Touch
– Up to 10x magnification • Method B – Probe
– Zero on glass – Average 10 readings at each location
• Method C – Tape – Coarse – 0-2 mils – X-coarse – 1.5-4 mils – HT – Measure and subtract for plastic (2 mils) – 3 readings at each location for mean
• These methods are not interchangeable
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 35
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing – During/After Application
During Application • Verify stripe on welds,
rivets, sharp edges • Watch for correct overlap • Identify runs or sags • Look for pinholes or
bubbles • Wet film (ASTM D4414)
– A – Comb – B – Disc
• Stay out of the way
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 36
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing – During/After Application
Averaging • Gage reading (individual) • Spot Measurement
– Disregard non-repeatable highs and lows
• Area Measurement (recordable) – Must fall within the
specified range for acceptance
Dry Film Thickness: SSPC-PA 2 – Procedure for Determining Conformance to Dry Coating Thickness Requirements
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 37
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing – During/After Application
Dry Film Thickness • Conformance – If no range is
given, then the range is +/-20% of the provided thickness
• Nonconforming readings – mark for correction – Within 5’ is non-compliant – Adjacent are suspect
• Appendix 7 – Pipe can be averaged per cart or rack, versus per section
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 38
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing – During/After Application
Dry Film Thickness - Gages • Type 1 – Magnetic Pull-off
– Banana or pencil • Type 2 – Electronic
– Ferrous or non-ferrous probes • Calibrated by Manufacturer, verified on-site
– Type 1 – verify on smooth test blocks – Type 2 – follow manufacturer instructions
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 39
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing – During/After Application
Low Voltage – Max 20 mils
– 5v to 90v direct current – Wet sponge – tap water
• Wet enough to barely avoid dripping
• Low sudsing surfactant may be used (dishwasher rinse aid)
• Check frequently for grounding • Double pass per foot per second
Holiday Testing (NACE SP0188)
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 40
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Nondestructive Testing – During/After Application
High Voltage – 20 mils minimum without manufacturer approval
• V. per documents or table in SP0188
• Confirm proper cure to not have false positives
• No moisture on surface
• Check frequently for grounding
• Single pass per foot per second
Holiday Testing (NACE SP0188)
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 41
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
PROJECT EXAMPLES
• Stadium • Secondary
Containment • Bridge Warranty
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 42
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Stadium Recoating – Importance of Warranty Walk Through
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 43
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Stadium Recoating – Importance of Warranty Walk Through
Looking Great?
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 44
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Stadium Recoating – Importance of Warranty Walk Through
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 45
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Stadium Recoating – Importance of Warranty Walk Through
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 46
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Stadium Recoating – Importance of Warranty Walk Through
Moral of the Story - You can’t catch it all
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 47
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Reinforced Concrete Liner Examples
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 48
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Reinforced Concrete Liner Examples
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 49
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Bridge Examples
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 50
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Holiday Testing on Concrete
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 51
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Tank Containment
February 22, 2017 Tiffany D. Vorhies, NACE CIP-2 - SME 52
2017 Underground Corrosion Short Course Coating Inspection Techniques – Period 3
Questions?