INDONESIAS COAL POLICY
ByDr. Ir. Bambang Setiawan
Director General
Indonesia Japan Coal SeminarTokyo, 27th March 2009
DIRECTORATE GENERAL OF MINERAL, COAL AND GEOTHERMAL
MINISTRY OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA
1
-
8/4/2019 Coal Policy English
2/22
2
TOPICS
CURRENT CONDITION Production and Export Some Basic Laws Coal Resources and Reserves
LAW NO. 4/2009 ABOUT MINERAL AND COALMINING
Main Principles Several Important Issues Transition Period
SUPPLY-DEMAND POLICY Principles
DMO Obligation Determination of Minimum Percentage of Domestic Coal
Sales (MPDCS) Coal Price Mechanism
-
8/4/2019 Coal Policy English
3/22
CURRENT CONDITION
3
-
8/4/2019 Coal Policy English
4/22
Production and Export
0
25
50
75
100
125
150
175
200
225
2000 2001 2002 2003 2004 2005 2006 2007
MillionTon
Export
Domestic
Production
Indonesiaisoneofthelargestcoalexporter
70%ofcoalproductionisexported
But,Indonesiaexperiencecoalscarcity
Domesticcoalsupply
shouldbe
guaranteed
Optimizingnational
income
4
-
8/4/2019 Coal Policy English
5/22
Some Basic Laws
Presidential Decree No5/2006 (National Energy Policy):
in 2025 coal contributed 35% of energy mix
Law No 3/2007 (Energy):
to guarantee the availability of energy supply, including coal supply
Law No 4/2009 (Mineral and Coal Mining):
to develop DMO policy
5
-
8/4/2019 Coal Policy English
6/22
52,44 M T
51,92 M T
0,014 M T
0,23 M T
0,002 M T
0,15 M T
RESOURCES104,76 BILLION TON
RESERVE20,99 BILLION TON
11,54 M T
7,17 M T
Coal Resources and Reserves
DESCRIPTION REALIZATION PLAN
2006 2007 2008 2009
Coal (Million ton) 193 217 229 230
Source : Geological Agency, December 2008
6
-
8/4/2019 Coal Policy English
7/227
LAW NO 4/2009 ABOUT MINERAL AND COAL MINING
-
8/4/2019 Coal Policy English
8/22
Main Principles of Law No 4/2009
`Replaced Law No. 11/1967 (Centralistic)` Consistent with The 1945 Constitution, article 33
` Respect the present contracts (contract of work and coal contract of work)
` Provide the certainty of law to all mining players
` Create condusive climate of investment
` The Law requests to optimize the state revenue and the area to be exploited
in the existing mining contract
` Permit scheme for new players:
` Mining Business License (Izin Usaha Pertambangan/IUP)
IUP exploration and IUP production-operation
` Mining Traditional License (Izin Pertambangan Rakyat)` Special Mining Business License (IUPK) for the area of ex State Reserves Zone
` IUP and IUPK are open for domestic and foreign investor through the bidding
scheme
8
-
8/4/2019 Coal Policy English
9/22
SEVERAL IMPORTANT ISSUES (1)
Preparation and establishment of Regulations :
Government Regulations :
` Preparation and Establishment of Mining zone
` Mineral and coal enterprises activity
` Supervising and controlling mining activity
`Reclamation and post mining
Minister Decree:
Mining Service
9
-
8/4/2019 Coal Policy English
10/22
Establishment of Mining Business Zone (Wilayah Usaha Pertambangan-WUP)
Small Scale Reserve Zone (Wilayah Pertambangan Rakyat-WPR) and StateReserve Zone (Wilayah Pencadangan Negara-WPN)
Simplification of licensing Permit: IUP exploration and IUP Opration. Besidesthere are also Mining Traditional License (Izin Pertambangan Rakyat-IPR)
and Special Mining Business License (I UP Khusus- I UPK)
Determination of mining areas through bidding. IUPK can be issued byMinister in the area of ex WPN (WUPK)
Clarification of Central Government, Provincial and District Authority;
Processing and refinery producing metal must be establish in Indonesia;
Community development is focused for local people welfare.
Forthesakeofnationalinterest,theGOI candetermine DomesticMarketObligation(DMO) of
mineraland
coal.
The mining company with IUPK scheme has an obligation to share its netprofit after production: 4% to government and 6% to local government
There is a punishment mechanism for any infringe to the Law.
SEVERAL IMPORTANT ISSUES (2)
10
-
8/4/2019 Coal Policy English
11/22
Transition Period (before the issuance of related GR)
Circular Letter of MEMR No. 03.E/31/DJB/2009, 31 January 2009about mineral and coal mining licenses before the issuance of therelated government regulations (GR) to all existing KP. Someimportant points are: The existing KP will be valid until the end of the period and must be adjusted intoIUP Temporary hold the new IUP licenses until related GR issued Coordinate with DGMCG about all application of upgraded stage activities ofexisting KP to be processed according to Law no 4/2009
Submit all data/information of all KP application existed before Law 4/2009 forevaluation and verification to prepare WIUP
Circular Letter of MEMR to all existing contract/agreement No.
02.E/31/DJB/2009, 30 January 2009. The important point is: that allmining contract/agreement (KK/PKP2B) has to submit the activityplanning on entire region of contract / agreement within 6 monthsafter the issuance of Law No 4/2009.
11
-
8/4/2019 Coal Policy English
12/22
SUPPLY-DEMAN D POLI CY ON COAL
12
-
8/4/2019 Coal Policy English
13/22
PRINCIPLES
Main principle is that coal domestic needs as a priority, with the followingdeterminations:
determination about amount of the domestic coal demand (DMO coal) forthe short term, medium term and long term
determination of yearly coal production and export control Mechanism:
Minister set up policy on coal DMO , and to coordinate with thegovernor/regent/mayor
Minister consults with the House of Representatives ini determining coalDMO
13
* ) Substance of the Government Regulation on Mineral and coal enterprises activity
-
8/4/2019 Coal Policy English
14/22
DMO Bat u bar a :Kon sep Dasar
Coal mining companies have to support domestic security of coal supply. Coal mining companies can export their coal production, when domestic
coal demand have been fulfilled.
Consequences of the above are: It must be set the amount of domestic coal demand, and It should be firstly determined a minimum percentage of domestic coal
sales of coal (MPDCS/PMPBDN) from coal mining production
For example in 2009 : Coal DMO is 68 million tons (an average of 17,020 million tons / quarter)
which is determined on the basis of coal user projection (coal electricity,cement, etc.).
The DMO is then distributed proportionally to the coal companies throughthe mechanism of Work Budget and Program (CCoW RKAB) approval.
DMO OBLICATION FOR COAL MINING
14
Determination of Minimum Percentage of Domestic Coal Sales
-
8/4/2019 Coal Policy English
15/22
Determination of Minimum Percentage of Domestic Coal Sales(MPDCS)
15
MinisterDecreeon
MinimumPercentageof
DomesticCoalSales
MinisterDecreeon
DomesticCoal
Demand
ProposalofCoalDemandfrom
DomesticCoalConsumerPlanofCoalProductionfrom
CoalMiningCompany
March
June
-
8/4/2019 Coal Policy English
16/22
SUPERVISION AND REPORTING
March June Sept ember Decem ber
Quar t er I Quar t er II Quar t er III Quar t er IV
Repor t I Repor t II Repor t III Annual Repor t
If it does not meetPMPBDN Quarter IMust be met inQuarter II
If it does not meetPMPBDN Quarter IIMust be met inQuarter III
If it does not meetPMPBDN Quarter IIIMust be met inQuarter IV
If it does not meetAnnual PMPBDNthere is penalties
16
-
8/4/2019 Coal Policy English
17/22
ON PROPOSAL:*)
The government needs to set an Indonesian Coal Price Reference (ICPR/HPB), to:- optimize on state revenues from coal.- be a reference for producer and consumers, mainly domestic consumers.
- support domestic coal security of supply. ICPR will cause the coal prices relatively "uniform" (related to the quality), so
that domestic coal supply and export is similarly attractive.
ICPR refers to several international publications of coal price, including theIndonesian Coal Index (ICI)
The Government may determine coal price for specific domestic needs.
ON TRANSITION:Government issues a monthly average coal price, and circulated to all local
governments as a reference for KP holders. For PKP2B, the coal price iscontrolled through Work and Budget approval and monthly report.
COAL PRI CE MECHAN I SM
17
*) GR about Mineral and Coal Activity and Minister Regulation about Coal Price
INDONESIA COAL PRICE REFERENCE (ICPR)
-
8/4/2019 Coal Policy English
18/22
t o m eet dom est i c coal supp l y and t o
ach i ev e o p t i m u m co u n t r y i n co m e
Minister
determine
FloorPrice
ofCoal
ICPRSteam
Coal
ICPRCokingCoal
ICPRonFOBvessel
+/ AdjustmentCost
18
INDONESIA COAL PRICE REFERENCE (ICPR)
Reference Index for ICPR
-
8/4/2019 Coal Policy English
19/22
Reference Index for ICPR
20
40
60
80
100
120
140
160
180
200
Jan
07
Mar07
Mei07
Jul07
Sep
07
Nop
07
Jan
08
Mar08
Mei08
Jul08
Sep
08
Nov
08
USD/ton
ICI
BJ
GC
Platts
Note:calculatedin6322kkal/kgGAR
Note:
Barlow
Jonker
(BJ)
and
Global
Coal
(GC)
are
referenceforinternationalcoalprice
IndonesiaCoalIndex(ICI)danPlattsare
referenceforIndonesiancoalprice
19
ICPR R f
-
8/4/2019 Coal Policy English
20/22
r e fer ence o f dom est i c coa l t r ad ing bo t h spo t an d t e r m
*Effective
time
of
ICPR
one
year
Max3month
Price
agreementContract Endof
Contract
Deliverytime
ICPR*
Ifthedeliveryoutofcontracttime,price
shouldbeadjustedtoongoingICPR
20
ICPR as Reference
CONCLUDING REMARKS
-
8/4/2019 Coal Policy English
21/22
CONCLUDING REMARKS
Law No. 4 / 2009 as replacement of Law No. 11/1967 has set manynew things, including changes in licensing mechanism, and there isno longer such agreement/ contract. However, the existing contract
/ agreement is still respected until it ends.
For the Coal Supply - Demand arrangement in principle be based
on the domestic needs prior to export.
21
-
8/4/2019 Coal Policy English
22/22
Thank Youwww.djmbp.esdm.go.id