    INDONESIAS COAL POLICY

    ByDr. Ir. Bambang Setiawan

    Director General

    Indonesia Japan Coal SeminarTokyo, 27th March 2009

    DIRECTORATE GENERAL OF MINERAL, COAL AND GEOTHERMAL

    MINISTRY OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA

    1

  • 8/4/2019 Coal Policy English

    2/22

    2

    TOPICS

    CURRENT CONDITION Production and Export Some Basic Laws Coal Resources and Reserves

    LAW NO. 4/2009 ABOUT MINERAL AND COALMINING

    Main Principles Several Important Issues Transition Period

    SUPPLY-DEMAND POLICY Principles

    DMO Obligation Determination of Minimum Percentage of Domestic Coal

    Sales (MPDCS) Coal Price Mechanism

  • 8/4/2019 Coal Policy English

    3/22

    CURRENT CONDITION

    3

  • 8/4/2019 Coal Policy English

    4/22

    Production and Export

    0

    25

    50

    75

    100

    125

    150

    175

    200

    225

    2000 2001 2002 2003 2004 2005 2006 2007

    MillionTon

    Export

    Domestic

    Production

    Indonesiaisoneofthelargestcoalexporter

    70%ofcoalproductionisexported

    But,Indonesiaexperiencecoalscarcity

    Domesticcoalsupply

    shouldbe

    guaranteed

    Optimizingnational

    income

    4

  • 8/4/2019 Coal Policy English

    5/22

    Some Basic Laws

    Presidential Decree No5/2006 (National Energy Policy):

    in 2025 coal contributed 35% of energy mix

    Law No 3/2007 (Energy):

    to guarantee the availability of energy supply, including coal supply

    Law No 4/2009 (Mineral and Coal Mining):

    to develop DMO policy

    5

  • 8/4/2019 Coal Policy English

    6/22

    52,44 M T

    51,92 M T

    0,014 M T

    0,23 M T

    0,002 M T

    0,15 M T

    RESOURCES104,76 BILLION TON

    RESERVE20,99 BILLION TON

    11,54 M T

    7,17 M T

    Coal Resources and Reserves

    DESCRIPTION REALIZATION PLAN

    2006 2007 2008 2009

    Coal (Million ton) 193 217 229 230

    Source : Geological Agency, December 2008

    6

  • 8/4/2019 Coal Policy English

    7/227

    LAW NO 4/2009 ABOUT MINERAL AND COAL MINING

  • 8/4/2019 Coal Policy English

    8/22

    Main Principles of Law No 4/2009

    `Replaced Law No. 11/1967 (Centralistic)` Consistent with The 1945 Constitution, article 33

    ` Respect the present contracts (contract of work and coal contract of work)

    ` Provide the certainty of law to all mining players

    ` Create condusive climate of investment

    ` The Law requests to optimize the state revenue and the area to be exploited

    in the existing mining contract

    ` Permit scheme for new players:

    ` Mining Business License (Izin Usaha Pertambangan/IUP)

    IUP exploration and IUP production-operation

    ` Mining Traditional License (Izin Pertambangan Rakyat)` Special Mining Business License (IUPK) for the area of ex State Reserves Zone

    ` IUP and IUPK are open for domestic and foreign investor through the bidding

    scheme

    8

  • 8/4/2019 Coal Policy English

    9/22

    SEVERAL IMPORTANT ISSUES (1)

    Preparation and establishment of Regulations :

    Government Regulations :

    ` Preparation and Establishment of Mining zone

    ` Mineral and coal enterprises activity

    ` Supervising and controlling mining activity

    `Reclamation and post mining

    Minister Decree:

    Mining Service

    9

  • 8/4/2019 Coal Policy English

    10/22

    Establishment of Mining Business Zone (Wilayah Usaha Pertambangan-WUP)

    Small Scale Reserve Zone (Wilayah Pertambangan Rakyat-WPR) and StateReserve Zone (Wilayah Pencadangan Negara-WPN)

    Simplification of licensing Permit: IUP exploration and IUP Opration. Besidesthere are also Mining Traditional License (Izin Pertambangan Rakyat-IPR)

    and Special Mining Business License (I UP Khusus- I UPK)

    Determination of mining areas through bidding. IUPK can be issued byMinister in the area of ex WPN (WUPK)

    Clarification of Central Government, Provincial and District Authority;

    Processing and refinery producing metal must be establish in Indonesia;

    Community development is focused for local people welfare.

    Forthesakeofnationalinterest,theGOI candetermine DomesticMarketObligation(DMO) of

    mineraland

    coal.

    The mining company with IUPK scheme has an obligation to share its netprofit after production: 4% to government and 6% to local government

    There is a punishment mechanism for any infringe to the Law.

    SEVERAL IMPORTANT ISSUES (2)

    10

  • 8/4/2019 Coal Policy English

    11/22

    Transition Period (before the issuance of related GR)

    Circular Letter of MEMR No. 03.E/31/DJB/2009, 31 January 2009about mineral and coal mining licenses before the issuance of therelated government regulations (GR) to all existing KP. Someimportant points are: The existing KP will be valid until the end of the period and must be adjusted intoIUP Temporary hold the new IUP licenses until related GR issued Coordinate with DGMCG about all application of upgraded stage activities ofexisting KP to be processed according to Law no 4/2009

    Submit all data/information of all KP application existed before Law 4/2009 forevaluation and verification to prepare WIUP

    Circular Letter of MEMR to all existing contract/agreement No.

    02.E/31/DJB/2009, 30 January 2009. The important point is: that allmining contract/agreement (KK/PKP2B) has to submit the activityplanning on entire region of contract / agreement within 6 monthsafter the issuance of Law No 4/2009.

    11

  • 8/4/2019 Coal Policy English

    12/22

    SUPPLY-DEMAN D POLI CY ON COAL

    12

  • 8/4/2019 Coal Policy English

    13/22

    PRINCIPLES

    Main principle is that coal domestic needs as a priority, with the followingdeterminations:

    determination about amount of the domestic coal demand (DMO coal) forthe short term, medium term and long term

    determination of yearly coal production and export control Mechanism:

    Minister set up policy on coal DMO , and to coordinate with thegovernor/regent/mayor

    Minister consults with the House of Representatives ini determining coalDMO

    13

    * ) Substance of the Government Regulation on Mineral and coal enterprises activity

  • 8/4/2019 Coal Policy English

    14/22

    DMO Bat u bar a :Kon sep Dasar

    Coal mining companies have to support domestic security of coal supply. Coal mining companies can export their coal production, when domestic

    coal demand have been fulfilled.

    Consequences of the above are: It must be set the amount of domestic coal demand, and It should be firstly determined a minimum percentage of domestic coal

    sales of coal (MPDCS/PMPBDN) from coal mining production

    For example in 2009 : Coal DMO is 68 million tons (an average of 17,020 million tons / quarter)

    which is determined on the basis of coal user projection (coal electricity,cement, etc.).

    The DMO is then distributed proportionally to the coal companies throughthe mechanism of Work Budget and Program (CCoW RKAB) approval.

    DMO OBLICATION FOR COAL MINING

    14

    Determination of Minimum Percentage of Domestic Coal Sales

  • 8/4/2019 Coal Policy English

    15/22

    Determination of Minimum Percentage of Domestic Coal Sales(MPDCS)

    15

    MinisterDecreeon

    MinimumPercentageof

    DomesticCoalSales

    MinisterDecreeon

    DomesticCoal

    Demand

    ProposalofCoalDemandfrom

    DomesticCoalConsumerPlanofCoalProductionfrom

    CoalMiningCompany

    March

    June

  • 8/4/2019 Coal Policy English

    16/22

    SUPERVISION AND REPORTING

    March June Sept ember Decem ber

    Quar t er I Quar t er II Quar t er III Quar t er IV

    Repor t I Repor t II Repor t III Annual Repor t

    If it does not meetPMPBDN Quarter IMust be met inQuarter II

    If it does not meetPMPBDN Quarter IIMust be met inQuarter III

    If it does not meetPMPBDN Quarter IIIMust be met inQuarter IV

    If it does not meetAnnual PMPBDNthere is penalties

    16

  • 8/4/2019 Coal Policy English

    17/22

    ON PROPOSAL:*)

    The government needs to set an Indonesian Coal Price Reference (ICPR/HPB), to:- optimize on state revenues from coal.- be a reference for producer and consumers, mainly domestic consumers.

    - support domestic coal security of supply. ICPR will cause the coal prices relatively "uniform" (related to the quality), so

    that domestic coal supply and export is similarly attractive.

    ICPR refers to several international publications of coal price, including theIndonesian Coal Index (ICI)

    The Government may determine coal price for specific domestic needs.

    ON TRANSITION:Government issues a monthly average coal price, and circulated to all local

    governments as a reference for KP holders. For PKP2B, the coal price iscontrolled through Work and Budget approval and monthly report.

    COAL PRI CE MECHAN I SM

    17

    *) GR about Mineral and Coal Activity and Minister Regulation about Coal Price

    INDONESIA COAL PRICE REFERENCE (ICPR)

  • 8/4/2019 Coal Policy English

    18/22

    t o m eet dom est i c coal supp l y and t o

    ach i ev e o p t i m u m co u n t r y i n co m e

    Minister

    determine

    FloorPrice

    ofCoal

    ICPRSteam

    Coal

    ICPRCokingCoal

    ICPRonFOBvessel

    +/ AdjustmentCost

    18

    INDONESIA COAL PRICE REFERENCE (ICPR)

    Reference Index for ICPR

  • 8/4/2019 Coal Policy English

    19/22

    Reference Index for ICPR

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    Jan

    07

    Mar07

    Mei07

    Jul07

    Sep

    07

    Nop

    07

    Jan

    08

    Mar08

    Mei08

    Jul08

    Sep

    08

    Nov

    08

    USD/ton

    ICI

    BJ

    GC

    Platts

    Note:calculatedin6322kkal/kgGAR

    Note:

    Barlow

    Jonker

    (BJ)

    and

    Global

    Coal

    (GC)

    are

    referenceforinternationalcoalprice

    IndonesiaCoalIndex(ICI)danPlattsare

    referenceforIndonesiancoalprice

    19

    ICPR R f

  • 8/4/2019 Coal Policy English

    20/22

    r e fer ence o f dom est i c coa l t r ad ing bo t h spo t an d t e r m

    *Effective

    time

    of

    ICPR

    one

    year

    Max3month

    Price

    agreementContract Endof

    Contract

    Deliverytime

    ICPR*

    Ifthedeliveryoutofcontracttime,price

    shouldbeadjustedtoongoingICPR

    20

    ICPR as Reference

    CONCLUDING REMARKS

  • 8/4/2019 Coal Policy English

    21/22

    CONCLUDING REMARKS

    Law No. 4 / 2009 as replacement of Law No. 11/1967 has set manynew things, including changes in licensing mechanism, and there isno longer such agreement/ contract. However, the existing contract

    / agreement is still respected until it ends.

    For the Coal Supply - Demand arrangement in principle be based

    on the domestic needs prior to export.

    21

  • 8/4/2019 Coal Policy English

    22/22

    Thank Youwww.djmbp.esdm.go.id

    22