Page 2: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 2/38

Co2 Cooler Training

Co2 Cooler gas charging training by coca cola.

Under guidance of 

Chandan samanta(CCI)

&

Mr. Yukio yamaguchi

Mr. Mitsuhiko kuroda( sanden corp Japan)

Page 3: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 3/38

Prototype

Page 4: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 4/38

• We are using a D96ET model as prototype

• Specifications of D96ET are

4 case chest cooler

Net volume as per ANSIAHAM standard

Page 5: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 5/38

Co2 Unit Assembly

• Fix the all components on base plate of D96ET

prototype machine.

• The components are compressor, condenser,

Fan, Capacitor stand and etc

on it for unit assembly

Page 6: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 6/38

Compressor

Page 7: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 7/38

• There is three connections for compressor

• They are Suction line, Process line and

Discharge Line

• While removing these line seals we have to

fallow a order for safe and prevent of leakage

of oil.

Page 8: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 8/38

Page 9: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 9/38

Page 10: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 10/38

Page 11: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 11/38

• Initially we have to remove discharge line seal,

suction line and finally remove process line.

• Take a copper tube as per required length to

 join the compressor discharge line and

condenser inlet and make T-Joint on between

this line for charging.

• Connect the heat-Exchanger of one line to thecondenser outlet which is going to the

capillary tube.

Page 12: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 12/38

 

Page 13: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 13/38

• Connect the heat exchanger of line to the

condenser out let(discharge) which is going to

the capillary tube.

• Add one more line to the process line.

• Breaze all joints which are connected.

Page 14: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 14/38

• Prepare capillary tube 0.031inch dia and 8ft

length.

• Connect the ball valves to the process line and

discharge line T connector for charging

applications.• Connect the capillary tube with the heat

exchanger out let by brazing operation.

Page 15: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 15/38

Page 16: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 16/38

Page 17: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 17/38

Page 18: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 18/38

Page 19: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 19/38

Page 20: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 20/38

• Place the base plate in to cooler body for

braze the suction and discharge line to thebody.

• Check all connections and charge N2 gas for

flesh out and leak test with pressure 300psi.

• After charging the gas, close charging valve

and check all connections with soap test

carefully for detect leak, if any leak we getbubbles on joints.

Page 21: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 21/38

Page 22: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 22/38

Page 23: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 23/38

Page 24: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 24/38

• After check remove the gas from system by

using ball valve.• Connect the vacuum pump to the charging

ports to evacuate the system.

• Evacuate the system till 0.05m.bar or50microns.

• Stop the ball valves when required evacuation

is achieved.• Remove vacuum pump connections.

Page 25: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 25/38

Page 26: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 26/38

Page 27: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 27/38

Gas charging

• Measure weight of the cylinder .

• Connect the crown make type pressure gauge

to the Co2 cylinder.

• Initially release the crown knob and release

main knob.

• Adjust the crown knob for 5Mpa pressure in

second gauge.

Page 28: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 28/38

Page 29: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 29/38

Page 30: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 30/38

• First gauge is 8.5Mpa shows that pressure

inside the cylinder.• Connect the charging hoses to the compressor

process port line.

Set the weight machine to the ‘0’ state. • Connect the charging line and slowly release

the gas in to the system till 150gms, the

weight machine shows.• Shut off the ball valves and remove the

charging connections.

Page 31: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 31/38

Page 32: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 32/38

Page 33: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 33/38

• Measure the Co2 cylinder weight for

conformation.• Close all the valves at cylinder.

• Connect the electrical wirings to the system as

per diagram.• Close the charging lines by tube pinching with

pinch of player and braze the tube ends.

• Test for refrigerant leak.

Page 34: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 34/38

Page 35: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 35/38

Page 36: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 36/38

• Switch in card plug and give power supply.

• Check the system is working proper or not.• Wait some time for cooling inside the

chamber.

Page 37: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 37/38

Page 38: Co2 Training

8/22/2019 Co2 Training

http://slidepdf.com/reader/full/co2-training 38/38

Thank YouFor

 your Time