close-up look on plants commissioning and start up 22may

18
Close-up look on plants Commissioning and Start up By: Hassan Fallatah

Upload: hide-n-eden

Post on 21-Nov-2014

122 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Close-Up Look on Plants Commissioning and Start Up 22May

Close-up look on plants Commissioning and Start up

By:Hassan Fallatah

Page 2: Close-Up Look on Plants Commissioning and Start Up 22May

Introduction

Hassan B. Fallatah

Page 3: Close-Up Look on Plants Commissioning and Start Up 22May

How Simple or Complex it is?

Plants Commissioning and Start up is a VERY complex process that requires:

• Talent & Competent Leadership.• Hard & effective Teamwork.• Proper Planning and execution.• Timely Communications and protocols. • Detailed Training.

Page 4: Close-Up Look on Plants Commissioning and Start Up 22May

Pyramid of Success

Page 5: Close-Up Look on Plants Commissioning and Start Up 22May

Project Parties Objectives

• EPC & PMT Teams:1.To finish plant construction.2.Leave project site as soon as possible.

Page 6: Close-Up Look on Plants Commissioning and Start Up 22May

Project Parties Objectives

• Commissioning and Start up Teams:1.To Learn the plant and the process.2.Check and Test the installed equipment.3.Confirm the plant will work as designed.4.Safely Commission the plant.5.Have a safe and successful Start up.6.Maintain steady & safe operation.

Page 7: Close-Up Look on Plants Commissioning and Start Up 22May

Achieving remarkable Commissioning and safe Start up

• Effectively estimate budget to avoid costly start up.• Factor organization goals into plans for a sustainable

operation. • Map the strategy in building an ideal start-up &

commissioning teams.• Consistently conduct a weekly joint walkthrough for all

project related parties.• Implement systematic monitoring and verification activities

throughout the project execution process.• Report all documentation data related to the project hand

over.• Meetings : (Daily – Weekly – Monthly)

Page 8: Close-Up Look on Plants Commissioning and Start Up 22May

OBSTACLES

• WHAT?• WHEN?• WHY?• HOW?

Page 9: Close-Up Look on Plants Commissioning and Start Up 22May

OBSTACLES EXAMPLES

• Mobilization for construction manpower. (Pro Welders) (NDT Technicians)

• Slow progress in concrete pre-casting.• Poor pipe spool fabrication progress.• Late delivery of steel structures.• Slow rate of mobilization for construction

manpower and labors strikes.• Interface progress.

Page 10: Close-Up Look on Plants Commissioning and Start Up 22May

OBSTACLES EXAMPLES

• Slow progress on pre-cast column/beam erection and cast-in-situ beams.

• Shortage of Argon gas.• Delivery of Piping Material (Pipe Fittings and

Flanges)• Low progress of hydro-testing due to low

production quantity of piping work.• Lack of operation manpower.

Page 11: Close-Up Look on Plants Commissioning and Start Up 22May

OBSTACLES EXAMPLES

• Schedules and milestones.• Ineffective procedures.• Risk of parallel activities (Hydro testing and

system punching).• Construction progress and systems handover.• Coordination between Commissioning and

construction groups.• Spare parts availabilities.

Page 12: Close-Up Look on Plants Commissioning and Start Up 22May

OBSTACLES ROOT CAUSES• Planning.• Design.• Installation.• Leadership.• Resources.• Work Quality.• Training.• Deliberate act of Sabotage.

Page 13: Close-Up Look on Plants Commissioning and Start Up 22May

KEYS FOR SUCCESS• ASSET OWNER ORGANIZATION:1. Overall planning.2. Supportive / Dynamic organization.3. Detailed operating and emergency procedures.4. Established standards and working practices.5. Competent personnel.6. Operator Training Simulator.7. Trained personnel.8. Resource planning.

Page 14: Close-Up Look on Plants Commissioning and Start Up 22May

KEYS FOR SUCCESS

• PLANT AND EQUIPMENT:1.Mechanical completion inspection.2.Commissioning procedures.3.Maintenance support.4.Prepared Q/C.5.Spare parts availability.

Page 15: Close-Up Look on Plants Commissioning and Start Up 22May

KEYS FOR SUCCESS

• PSSR.• Risk management & Risk assessment.• Licensors and Vendors support.• LERP & MERP & safety drills.• Updated Road Map plan.• EMP.• Identify Project Critical Paths.• Start- up Readiness review.

Page 16: Close-Up Look on Plants Commissioning and Start Up 22May

KEYS FOR SUCCESS• WATER OPERATION: 1.Confirm integrity and operational testing of

the equipment and Instruments.2.Provide operator training and familiarization

of the plant operation.3.Flush and clean all piping and vessels in order

to secure clean start up.4.Where applicable (SSC, Beds, dried systems).

Page 17: Close-Up Look on Plants Commissioning and Start Up 22May

OUTSTANDING EXAMLPE • PetroRabigh JV, Rabigh, Saudi Arabia.• 28 process units.• Mega project layout.• Independent power and steam supplier.• Massive petrochemical and refining complex.

High Olefins Fluid Catalytic Cracker (HOFCC)

Page 18: Close-Up Look on Plants Commissioning and Start Up 22May

HOFCC ALUMINUM PLATES

9” in

5” in

0.2 cm

HP STEAM TO MAIN AIR BLOWER