Page 1: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

Toonagh Lime Works

Clogrennane Lime Ltd

Toonagh Lime Works

AER 2010

Licence # P0 771-01

Toonagh Lime Works

Page 2: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

2

Section 1 – Overview ………………………………………………………………. 3

1.0 Introduction

1.1 Description of Activities

1.2 Responsibility for Environmental Management

1.3 Environmental Policy

Section 2 – Emissions …………………………………………………………….. 4

2.1 Emissions to Atmosphere

2.2 Noise Emissions & Tonal Noise

2.3 Dust Deposition & Annual PM 10 / 2.5

Section 3 – Waste Management ………………………………………………. 7

3.1 Waste Management Overview

3.2 Repak

3.3 Waste Register

Section 4 – Resource Consumption

Section 5 – Bund Integrity ………………………………………………………. 9

Section 6 – Complaints / Incidents

Section 7 – Environmental Management Programme ………………… 10

7.1 Review of 2010 Objectives and Targets (2nd

Schedule)

7.2 2011 Objectives and Targets (3rd

Schedule)

Section 8 – Reports ……………………………………………………………….. 12

8.1 Review of ELRA and CRAMP

8.2 Energy Efficiency Audit – Summary

8.3 Bat Survey

8.4 WYG Report

Section 9 – Inspections ………………………………………………………….. 13

Appendix A – Diesel Loss Overview

Appendix B – AER Contents as per Schedule D of Licence # P0 771-01

Appendix C – PRTR 2010/2009

Page 3: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

3

Section 1 – Overview

1.0 Introduction

IPPC Licence Register Number: P0771-01

Licensee Name: Clogrennane Lime Ltd

Site Name: Toonagh Lime Works

Location: Toonagh Quarry, Ennis, County Clare

1.1 Description of Activities

Production of lime in a kiln (POE 13.3).

The activity at the plant consists of the calcining of limestone in a kiln to produce quicklime. The

plant consists of a kiln, storage silos, a petcoke plant, workshop and office building. A weighbridge is

in operation at the site.

Stone is purchased from an adjacent quarry, stockpiled and fed into the kiln as required. Once inside

the kiln, it is heated to ~10000C. The final product is either sold as lump or crushed lime.

The fuel source for the kiln is petcoke, which is dried and milled before combustion.

Emissions from the site consist of emissions to atmosphere from the stack, fugitive dust emissions

and noise emissions. There are no emissions to water or sewer.

The site is also part of the GHG Scheme (IE-GHG 145-02).

The plant operates 24 hours a day, 365 days a year. It is primarily controlled via radio link from the

control room in the Carlow plant, although Toonagh personnel can take control of the plant if

necessary.

1.2 Responsibility for Environmental Management

The responsibility for the Environmental Management of Toonagh Lime Works is as follows:

(i) Location Manager, Mr. Bill Keogh

(ii) Technical Manager, Mr. Joe Connolly

(iii) Quality Technician, Mr. Mark Kennedy

(iv) Managing Director, Mr. Larry Byrne

1.3 Environmental Policy

Toonagh Lime Works operates an Environmental Management System to achieve its short and long

term goals of Continuous Environmental Improvement. This Management System is in the form of

an IPPC licence, which is supported by procedures from the Environmental Manual.

Page 4: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

Se

cti

on

2 –

Em

issi

on

s

2.1

E

mis

sio

ns

to

Atm

os

ph

er

e

Em

issi

on

So

urc

e R

efe

ren

ce –

A1

.1 (

Kiln

).

All e

mis

sio

ns

to a

tmo

sph

ere

are

wit

hin

th

e E

LV’s

as

set

ou

t in

Sch

ed

ule

B.1

of

lice

nce

nu

mb

er

P0

77

1-0

1.

Pa

ram

ete

r

1st

Ha

lf 2

01

0

(mg

/ N

m3)

2n

d H

alf

20

10

(mg

/ N

m3)

An

nu

al

Av

era

ge

(mg

/ N

m3)

ELV

’s

(mg

/Nm

3)

Ma

ss E

mis

sio

ns

(20

10

)

(to

nn

es

pe

r a

nn

um

)

Ma

ss E

mis

sio

ns

(20

09

)

(to

nn

es

pe

r a

nn

um

)

Co

mp

lia

nce

(%)

Pa

rtic

ula

tes

4.7

5

.2

4.9

5

< 5

0

0.4

2

0.3

8

10

0

PM

10

2.0

5

3.1

2

.58

--

--

0.2

1

0.0

8

10

0

PM

2.5

0.8

5

2.7

1

.78

--

--

0.1

3

0.0

6

10

0

Nit

rog

en

Ox

ide

s

(as

NO

2)

39

1.5

2

96

3

43

.75

4

00

2

8.2

9

19

.27

1

00

Ox

ide

s o

f S

ulp

hu

r

(as

SO

2)

< 5

<

5

< 5

6

65

0

.43

0

.98

1

00

4

Page 5: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

5

2.2

N

ois

e E

mis

sio

ns

& T

on

al

No

ise

All n

ois

e m

ea

sure

me

nts

are

co

mp

lia

nt

wit

h t

he

lim

its

as

set

ou

t in

lice

nce

nu

mb

er

P0

77

1-0

1 (

Co

nd

itio

n 4

.5 &

Sch

ed

ule

C.5

).

As

pe

r C

on

dit

ion

6.1

, a

to

na

l no

ise

su

rve

y w

as

carr

ied

ou

t in

20

10

. N

o t

on

al n

ois

e w

as

evid

en

t.

All m

ea

sure

me

nts

are

30

min

ute

LA

eq d

B(A

).

Da

y

Loca

tio

n

Q1

Q

2

Q3

Q

4

ELV

C

om

pli

an

ce (

%)

NS

L 1

48

5

3

38

.3

37

.9

55

1

00

NS

L 2

51

5

4

50

5

2.6

5

5

10

0

Nig

ht

Loca

tio

n

Q1

Q

2

Q3

Q

4

ELV

C

om

pli

an

ce (

%)

NS

L 1

44

4

2

37

.3

38

.6

45

1

00

NS

L 2

42

4

1

42

.2

40

.6

45

1

00

Page 6: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

6

2.3

D

us

t D

ep

os

itio

n &

An

nu

al

PM

10

/ 2

.5

As

pe

r S

che

du

le B

1.2

, d

ust

de

po

siti

on

is m

ea

sure

d o

nce

pe

r q

ua

rte

r o

n a

30

da

y c

om

po

site

sa

mp

le.

An

nu

al m

ea

sure

me

nt

of

am

bie

nt

PM

10

& 2

.5 w

as

carr

ied

ou

t. A

lth

ou

gh

no

lim

its

are

se

t fo

r th

ese

pa

ram

ete

rs in

th

e li

cen

ce,

the

re

sult

s w

ere

sti

ll b

elo

w

na

tio

na

l lim

its.

A c

op

y o

f th

is r

ep

ort

is

ava

ila

ble

on

sit

e f

or

insp

ect

ion

.

All d

ust

de

po

siti

on

re

sult

s a

re w

ith

in t

he

lim

its

set

ou

t in

th

e lic

en

ce,

as

sho

wn

in

th

e t

ab

le b

elo

w;

Loca

tio

n

Q1

Q

2

Q3

Q

4

ELV

C

om

pli

an

ce (

%)

AM

1

19

9

27

6

32

1

33

2

35

0

10

0

AM

2

17

7

15

4

14

0

28

5

35

0

10

0

AM

3

13

8

19

8

10

9

30

1

35

0

10

0

AM

4

11

2

19

2

12

7

33

5

35

0

10

0

*A

M 5

12

3

79

3

46

3

06

--

--

----

No

te 1

:

All r

esu

lts

in m

g /

m2/

da

y *N

ote

2:

AM

5 i

s n

ot

spe

cifi

ed

in t

he

lice

nce

bu

t is

do

ne

in

ad

dit

ion

to

AM

1-4

, h

en

ce n

o lim

its

are

se

t fo

r th

is lo

cati

on

Page 7: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

Section 3 – Waste Management

3.1 Waste Management Overview

Toonagh Lime works follows acceptable principles of waste management and control. These

principles are as follows:

Prevention

Toonagh Lime Works strives to prevent waste wherever possible. This principle is

efficient operation of the plant and process. Since all raw materials are used during the pro

there is no process waste

Minimisation

The efficient control of the plant and equipment ensures that the generation of material

specification is kept to an absolute minimum

Re-use

All process materials are used within the proces

Recycling

Waste materials generated will be recycled where possible

Energy Recovery

Energy recovery from waste material does not

Disposal

The production of waste is minimised through the efficient operating of all areas of production. With

the reduction of waste through the implementation of the above principles the disposal of waste

kept to a minimum

3.2 Repak

We are members of the Repak scheme and post returns biannually

Energy Recovery

Management

Waste Management Overview

Toonagh Lime works follows acceptable principles of waste management and control. These

Toonagh Lime Works strives to prevent waste wherever possible. This principle is intrinsic to the

efficient operation of the plant and process. Since all raw materials are used during the pro

The efficient control of the plant and equipment ensures that the generation of material

is kept to an absolute minimum

All process materials are used within the process to produce the final products

ill be recycled where possible

Energy recovery from waste material does not apply to the operations at Toonagh Lime Works

The production of waste is minimised through the efficient operating of all areas of production. With

the reduction of waste through the implementation of the above principles the disposal of waste

We are members of the Repak scheme and post returns biannually

Prevent

Reduce

Re-Use

Recycle

Energy Recovery

Disposal

7

Toonagh Lime works follows acceptable principles of waste management and control. These

intrinsic to the

efficient operation of the plant and process. Since all raw materials are used during the process,

The efficient control of the plant and equipment ensures that the generation of material outside

apply to the operations at Toonagh Lime Works

The production of waste is minimised through the efficient operating of all areas of production. With

the reduction of waste through the implementation of the above principles the disposal of waste is

Page 8: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

8

3.3

W

ast

e R

eg

iste

r

Th

e f

ull P

oll

uta

nt

Re

lea

se a

nd

Tra

nsf

er

Re

gis

ter

can

be

fo

un

d in

Ap

pe

nd

ix C

Th

e t

ab

le b

elo

w g

ive

s a

su

mm

ary

of

ph

ysic

al

wa

ste

s le

av

ing

th

e s

ite

Ha

zard

ou

s w

ast

e c

on

sist

ed

of

con

tam

ina

ted

so

il f

rom

th

e d

iese

l lo

ss in

cid

en

t a

s d

esc

rib

ed

in

Ap

pe

nd

ix A

Fu

ll C

1 r

eco

rds

are

ava

ila

ble

on

sit

e

Wa

ste

De

scri

pti

on

H

aza

rdo

us

(Ye

s /

No

) E

WC

D

isp

osa

l/

Re

cov

ery

Co

de

Dis

po

sal

Co

mp

an

y

Wa

ste

Tra

nsp

ort

er

Fin

al

De

stin

ati

on

Qu

an

tity

of

Wa

ste

Pro

du

ced

Ge

ne

ral

Wa

ste

G

en

era

l wa

ste

fro

m s

ite

an

d

wo

rksh

op

No

2

0 0

3 0

1

D1

Cla

re W

ast

e

Ltd

Gre

yho

un

d

Re

cycl

ing

Cla

re W

ast

e

Ltd

Cle

an

Ire

lan

d

Re

cycl

ing

Ltd

Ba

llin

ag

un

Lan

dfi

ll,

Cre

e,

Co

. C

lare

Ina

gh

La

nd

fill

,

Co

. C

lare

4.0

2 t

Wa

ste

Wo

od

Pa

lle

ts e

tc

No

2

0 0

1 3

8

R3

G

reyh

ou

nd

Re

cycl

ing

Cle

an

Ire

lan

d

Re

cycl

ing

Ltd

Fin

sa L

td,

Sca

riff

, C

o.

Cla

re

2.2

2 t

Mix

ed

Re

cycl

ab

les

Dry

off

ice

an

d

pa

cka

gin

g

wa

ste

No

2

0 0

1 0

1

R3

G

reyh

ou

nd

Re

cycl

ing

Cle

an

Ire

lan

d

Re

cycl

ing

Ltd

Cle

an

Ire

lan

d

Re

cycl

ing

,

Cre

e,

Co

.

Cla

re

0.1

2 t

Co

nta

min

ate

d

So

il

Fro

m d

iese

l

loss

inci

de

nt

Ye

s 1

7 0

5 0

3*

R5

E

NV

A L

td

EN

VA

Ltd

E

NV

A

Po

rtla

ois

e

66

.76

t

Page 9: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

9

Section 4 – Resource Consumption

The table below outlines the resource consumption at Toonagh Lime Works in 2010;

Resource 2010 2009 Units

Petcoke 6375 5351 tonnes

Electricity 2.271 2.01 GWh

On-site ground water abstraction 45 50 m3

On-site surface abstraction 0 0 m3

Municipal supply 0 0 m3

The sole raw material for the process is limestone. 100% of raw material brought on site is

consumed with no process waste generated.

Section 5 – Bund Integrity

Toonagh Lime Works maintains two bunded areas on site;

Bund 1 – Oil storage bund

Bund 2 – Petcoke diesel bund

Both bunds were tested for soundness in 2010 and were found to be impermeable to water loss

Both bunds are due again for testing in 2013.

Section 6 – Complaints / Incidents

There were no complaints in Toonagh Lime Works in 2010, or in any previous year of operation.

There was one incident on site, as detailed in Appendix A.

A non- compliance against Condition 5.1 of the licence was issued in inspection report reference #

((P0771-01)sm03vt)).

Page 10: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

10

Se

cti

on

7 –

En

vir

on

me

nta

l M

an

ag

em

en

t P

rog

ram

me

7.1

R

ev

iew

of

20

10

Ob

ject

ive

s a

nd

Ta

rge

ts (

2n

d S

che

du

le)

Are

a

Ob

ject

ive

T

arg

et

Tim

efr

am

e

Re

spo

nsi

bil

ity

P

rog

ress

En

vir

on

me

nta

l M

an

ua

l

To

est

ab

lish

an

En

viro

nm

en

tal M

an

ua

l

an

d im

pro

ve t

he

EM

S

To

ha

ve

a f

ull

y d

igit

al,

com

pa

ny-

wid

e

En

vir

on

me

nta

l M

an

ua

l

by

20

12

Sta

ge

1 –

Ju

ly

20

10

Mr.

Jo

e C

on

no

lly

Mr.

Bre

nd

an

Wa

lsh

Sta

ge

1 c

om

ple

ted

En

viro

nm

en

tal M

an

ua

l e

sta

blish

ed

En

erg

y U

sag

e

To

id

en

tify

are

as

wh

ere

a

red

uct

ion

in e

ne

rgy

con

sum

pti

on

is

po

ssib

le

To

re

ma

in b

elo

w t

he

up

pe

r le

ve

ls o

f e

ne

rgy

con

sum

pti

on

as

fou

nd

in t

he

BR

EF

fo

r th

e li

me

ind

ust

ry

En

d 2

01

0

Mr.

Ala

n R

ya

n

Mr.

Bil

l Ke

og

h

Co

mp

lete

d

Sit

e id

en

tifi

ed

as

be

ing

hig

hly

en

erg

y

eff

icie

nt

Fu

ll r

ep

ort

av

ail

ab

le o

n s

ite

fo

r

insp

ect

ion

Du

st

To

co

ntr

ol fu

git

ive

em

issi

on

s

To

re

ma

in b

elo

w t

he

lim

its

for

du

st

de

po

siti

on

as

set

ou

t in

the

lice

nce

On

go

ing

M

r. J

oe

Co

nn

oll

y

Mr.

Bil

l Ke

og

h

Du

st a

wa

ren

ess

pro

gra

m i

nit

iate

d

No

du

st c

om

pla

ints

in

20

10

or

an

y

pre

vio

us

ye

ar

Tra

inin

g

To

ke

ep

all

sta

ff u

p t

o

da

te w

ith

ne

w a

nd

exi

stin

g le

gis

lati

on

an

d

be

st p

ract

ice

me

tho

ds

To

en

sure

th

at

ke

y

ma

na

ge

me

nt

are

fu

lly

aw

are

, a

t a

min

imu

m,

of

ke

y le

gis

lati

ve

issu

es

On

go

ing

M

r. J

oe

Co

nn

oll

y

Inte

rna

l tra

inin

g w

as

carr

ied

ou

t in

20

10

Ext

ern

al tr

ain

ing

(E

PA

se

min

ar)

att

en

de

d

Page 11: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

11

7.2

2

01

1 O

bje

ctiv

es

an

d T

arg

ets

(3

rd S

che

du

le)

Are

a

Ob

ject

ive

T

arg

et

Tim

efr

am

e

Re

spo

nsi

bil

ity

O

pe

rati

on

al

Me

an

s /

Me

cha

nis

m f

or

Ach

iev

em

en

t

En

vir

on

me

nta

l M

an

ua

l

Sta

ge

2 –

to

exp

an

d t

he

exi

stin

g M

an

ua

l, f

ocu

sin

g

on

em

erg

en

cy

pre

pa

red

ne

ss

To

ha

ve

a f

ull

y d

igit

al,

com

pa

ny-

wid

e

En

vir

on

me

nta

l M

an

ua

l

by

20

12

Sta

ge

2 –

En

d

20

11

Mr.

Jo

e C

on

no

lly

Mr.

Bre

nd

an

Wa

lsh

Mr.

Ma

rk K

en

ne

dy

Mr.

Bil

l Ke

og

h

Ma

nu

al w

ill

be

exp

an

de

d a

nd

tie

d i

n

wit

h t

he

OH

SA

S 1

80

01

sy

ste

m f

or

em

erg

en

cy r

esp

on

se.

Ge

ne

ral p

roce

du

res

will

be

exp

an

de

d

an

d u

pd

ate

d.

En

erg

y U

sag

e

To

in

corp

ora

te t

he

fin

din

gs

of

the

en

erg

y

usa

ge

su

rve

y c

arr

ied

ou

t

in 2

01

0 in

to a

fu

ll e

ne

rgy

eff

icie

ncy

au

dit

To

re

ma

in b

elo

w t

he

up

pe

r le

ve

ls o

f e

ne

rgy

con

sum

pti

on

as

fou

nd

in t

he

BR

EF

fo

r th

e li

me

ind

ust

ry

En

d 2

01

1

Mr.

Ala

n R

ya

n

Mr.

Jo

e C

on

no

lly

A f

ull

en

erg

y e

ffic

ien

cy a

ud

it w

as

last

carr

ied

ou

t in

20

08

.

Th

is d

esk

ba

sed

au

dit

will

be

re

vis

ed

usi

ng

th

e in

form

ati

on

fro

m t

he

en

erg

y

usa

ge

su

rve

y c

arr

ied

ou

t in

20

10

.

Die

sel

Loss

To

fu

lly

co

mp

ly w

ith

th

e

reco

mm

en

da

tio

ns

of

WY

G in

re

lati

on

to

th

e

die

sel l

oss

inci

de

nt

in

20

10

To

ha

ve

co

mp

lete

d o

ff

site

mo

nit

ori

ng

an

d

red

uce

d o

n s

ite

mo

nit

ori

ng

by

en

d o

f

20

11

En

d 2

01

1

Mr.

Jo

e C

on

no

lly

Mr.

Ma

rk K

en

ne

dy

Mr

Bil

l Ke

og

h

Fu

ll c

on

sid

era

tio

n w

ill b

e g

ive

n t

o t

he

fin

al W

YG

re

po

rt,

du

e A

pri

l 2

01

1

Tra

inin

g

To

ke

ep

all

sta

ff u

p t

o

da

te w

ith

ne

w a

nd

exi

stin

g le

gis

lati

on

an

d

be

st p

ract

ice

me

tho

ds

To

en

sure

th

at

ke

y

ma

na

ge

me

nt

are

fu

lly

aw

are

, a

t a

min

imu

m,

of

ke

y le

gis

lati

ve

issu

es

On

go

ing

M

r. J

oe

Co

nn

oll

y

On

go

ing

Ad

eq

ua

te r

eso

urc

es

wil

l be

pro

vid

ed

fo

r

an

y t

rain

ing

re

qu

ire

d in

th

is a

rea

Page 12: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

12

Section 8 – Reports

8.1 Review of ELRA and CRAMP

The original ELRA and CRAMP was completed and submitted to the Agency in 2007.

The Financial Provisions in the original document are considered sufficient for the site at present.

A new ELRA, incorporating Financial Provisions (2011) is currently being drafted and will be

submitted to the Agency for approval in Q2 of this year.

8.2 Energy Efficiency Audit – Summary

An energy efficiency audit was carried out in 2008. This report was submitted to the Agency. The

report found that no major savings could be made in the area of energy efficiency, although some

minor modifications to the plant were recommended. Toonagh Lime Works operates a highly

efficient dual shaft regenerative kiln, and the audit found that it is operating at levels considered to

be those of an efficiently operated kiln, as found in the BREF for the lime industry (2001 version).

An energy monitoring survey was carried out in 2010. Using the results from this survey it is planned

to repeat the original energy use survey in 2011. Results from this will be compared to the typical

results as found in the latest BREF (2010 version) for the lime industry.

8.3 Bat Survey

As agreed in letter to the Agency dated 30th

June 2010, the bat survey is now required every second

year instead of annually. Therefore no survey was carried out in 2010. A survey is planned for 2011.

8.4 WYG Incident Report

A report on the diesel loss incident was submitted to the Agency on the 26th

November 2010. This

report contained an overview of the incident, the initial response and the proposed medium to long

term plan. A second WYG report is expected in Q2 2011.

Page 13: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

13

Section 9 – Inspections

Two site inspection reports were issued in 2010;

Inspection Reports

SM02aJD SM03vt

Date of Inspection

4/11/2009 3/11/2010

Date of report

12/11/2010 22/11/2010

Non-compliances

None One

Audit observation 1

Storage of waste on site SO2 test programme

Audit observation 2

Records not available for

inspection Oil and lubricant store

Audit observation 3

SO2 test programme Financial provision

Audit observation 4

General housekeeping -----

Audit observation 5

Diesel tank hose -----

All points in both reports have been addressed and a response sent to the Agency

Page 14: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

14

Appendix A – Diesel Loss Incident

Overview

On the 28/29th

October 2010, an incident occurred on site at Toonagh Lime Works. An operator

error resulted in the loss of approximately 2800 litres of diesel from a bunded storage tank on site

As soon as the loss of diesel became apparent, an emergency response plan was initiated. The EPA,

local County Council and the Inland Fisheries board were contacted

WYG Environmental Consultants were brought in to project manage the incident response

Response to incident

The immediate response to the incident involved the collection of residual diesel on site and the

monitoring of wells and springs both on and off site. Clogrennane Lime Ltd worked closely with the

Agency and local County Council, with several meetings being held between the relevant parties

In the medium to long term, monitoring wells were drilled on site with a view to establishing a pump

and treat system for any diesel encountered. Inspection of off-site wells and springs continued on a

routine basis

Current standing

No diesel was encountered at any monitoring location on or off site. The monitoring wells have not

encountered any diesel contamination and there has been no evidence of diesel contamination in

the groundwater

The site itself sits on a massive limestone formation. The foundations of the kiln were built on this

formation and surrounded by granular infill material. It is suspected that the diesel lost is held in the

porous material at the foundations of the kiln

Monitoring of the wells both on and off site will continue for a period as agreed with the Agency

Correspondence with the Agency

A joint Clogrennane Lime Ltd / WYG Incident Report was submitted to the Agency on the 26th

November 2010. This report contained an overview of the incident and the medium to long term

incident response plan

Site inspection report SM03vt was received from the Agency on the 22/11/2010, dealing mainly with

the incident. A non-compliance was issued against Condition 5.1 of the licence

Page 15: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

15

Appendix B – AER Contents as per Schedule D

Topic Comments

Emissions from installation

Included

Waste management record

Included

Resource consumption summary

Included

Schedule of environmental objectives

Included

Environmental management programme – previous year

Included

Environmental management programme – current year

Included

Pollution emission register – previous year

Included

(PRTR)

Pollution emission register – current year

Included

(PRTR)

Noise monitoring summary

Included

Ambient monitoring summary

Included

Tank and pipeline testing and inspection report

Included

(Section 5)

Reported incidents summary

Included

(Appendix A)

Energy efficiency audit report summary

Included

Report on the assessment of the efficiency of use of raw materials in process and

the reduction in waste generated

Included

Report on Progress Made and Proposals being developed to minimize Water

Demand the Volume of Trade Effluent Discharged

N/A

Review of residuals management plan

Included

Review of Environmental Liabilities including Financial Provision

Included

Page 16: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever

Appendix C – Pollutant Release & Transfer Register – 2010 & 2009

Page 17: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 18: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 19: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 20: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 21: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 22: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 23: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 24: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 25: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 26: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 27: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever
Page 28: Clogrennane Lime Ltd Toonagh Lime WorksToonagh Lime works follows acceptable principles of waste management and control. These Toonagh Lime Works strives to prevent waste wherever