Claims Management Service for Contractors :
Brief:
Management of Claims is also called
In our experience, in today's competitive world the
money, is by variation orders.
Contractor is always under pressure to keep his team and equipments occupied as the
idling cost is much more than working at a lower cost. Thus,
is forced to quote lower than scientifically & logically calculated rates and in the process he
compromise on the overhead costs
To compensate for low rates, a contractor always aims to complete the work in least
possible time so that he saves by way of shortening the
Thus, "a change" is never in favour of the contractor. BUT .... changes in a construction
project are inevitable.
A change can occur at any stage of a construction project. There are many reasons for
changes in a construction projects, but
a) design errors and omissions,
b) change in field conditions or
c) owner initiated changes.
For a Contractor Claims Management
In our opinion, any time is the right time to manage claims
Management Service for Contractors :
called Change management / Variation Order Management.
In our experience, in today's competitive world the only way for a Contractor
Contractor is always under pressure to keep his team and equipments occupied as the
idling cost is much more than working at a lower cost. Thus, by his own circumstances,
uote lower than scientifically & logically calculated rates and in the process he
compromise on the overhead costs.
To compensate for low rates, a contractor always aims to complete the work in least
possible time so that he saves by way of shortening the project time.
Thus, "a change" is never in favour of the contractor. BUT .... changes in a construction
A change can occur at any stage of a construction project. There are many reasons for
changes in a construction projects, but are primarily due to three causes:
design errors and omissions,
change in field conditions or
owner initiated changes.
For a Contractor Claims Management should always be a "work in progress
time is the right time to manage claims and variation orders.
Management Service for Contractors :
Change management / Variation Order Management.
only way for a Contractor, to make
Contractor is always under pressure to keep his team and equipments occupied as the
by his own circumstances, he
uote lower than scientifically & logically calculated rates and in the process he
To compensate for low rates, a contractor always aims to complete the work in least
Thus, "a change" is never in favour of the contractor. BUT .... changes in a construction
A change can occur at any stage of a construction project. There are many reasons for
work in progress".
and variation orders.
![Page 2: Claims Management Services for Contractors](https://reader036.vdocuments.site/reader036/viewer/2022082514/55a269521a28ab91308b4608/html5/thumbnails/2.jpg)
Need for a third party:
Indian construction market is unique
whenever the Client representative is in trouble because of the possible change orders
start giving " दहुाई" of good relationship.
For the sake of maintaining good relationship with Client's site team, contractor's site staff
is unable to write strong contractual letters or file claims properly
team is threatened that they can not comple
The Contractor's management is subtly told that the company will be
Appointing and authorizing a third party will help the contractor to file claims timely and
effectively.
What we bring to you:
1. Reducing un-necessary processes/ activities under the garb of contractual condition /
requirements.
2. Interpreting contractual clauses for the contractor
3. Market intelligence to file claims.
4. To speed up and streamline the change order process
5. Submit the change proposal
6. To file claims which are contractually / legally
7. Advise in maintaining adequate documentation and record keeping for the entire
change order process.
8. Ensure that the owner is be able to
contractor’s price.
Our aim is continuous improvement
Indian construction market is unique and has typical characters. One of them being that,
whenever the Client representative is in trouble because of the possible change orders
good relationship.
good relationship with Client's site team, contractor's site staff
is unable to write strong contractual letters or file claims properly. Most of the time, the site
that they can not complete the project without co-operation from them.
The Contractor's management is subtly told that the company will be blacklisted.
Appointing and authorizing a third party will help the contractor to file claims timely and
necessary processes/ activities under the garb of contractual condition /
Interpreting contractual clauses for the contractor's benefit.
claims.
To speed up and streamline the change order process.
ubmit the change proposal in a timely and complete manner.
contractually / legally acceptable.
adequate documentation and record keeping for the entire
Ensure that the owner is be able to establish the cost of change orders and validate the
im is continuous improvement & innovation in Claim's management.
and has typical characters. One of them being that,
whenever the Client representative is in trouble because of the possible change orders they
good relationship with Client's site team, contractor's site staff
. Most of the time, the site
operation from them.
blacklisted.
Appointing and authorizing a third party will help the contractor to file claims timely and
necessary processes/ activities under the garb of contractual condition /
adequate documentation and record keeping for the entire
establish the cost of change orders and validate the