1
City of San Diego Long-Term Resource Management
Options Strategic Plan (LRMOSP)
Resource Management Advisory Committee Fourth Meeting April 30, 2008
2
Agenda
I. Welcome/Introductions Approval of Feb 20th Meeting Summary
II. Recap of Solid Waste Facilities Tour-March 26, 2008
III. Review Screening Matrices IV. Next Meeting (June 18, 2008)
3
Solid Waste Facilities Tour Allan Company Material Recovery Facility
4
Solid Waste Facilities Tour
Miramar Nursery
5
Solid Waste Facilities Tour
Miramar Greenery
6
Solid Waste Facilities Tour
Miramar Landfill
7
Solid Waste Facilities Tour
8
End Goal
• Planning Horizon -YEAR 2030 • City of San Diego Annual Landfill
Disposal Needs:
2005 - 2.0 million tons 2030 - 2.5 million tons
9
Material Disposed by the City Annually is Substantial and is Projected to Increase
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
2005 2030
1,992,685
2,548,281 Tons
(SANDAG)
10
Over Next 25 Years - Cumulative Volume Generated by the City Creates a Tremendous
Demand
25,000,000
30,000,000
35,000,000
40,000,000
45,000,000
50,000,000
55,000,000
60,000,000
51,809,810
59,045,540 Tons
28% Growth (SANDAG)
No Increase Assumed
11
City’s Miramar Landfill Reaches Permitted Capacity in 2012
-1,000,000 0
1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 9,000,000
2007 2008 2009 2010 2011 2012
SANDAG Growth No Increase Assumed
12
Where will our trash go?
13
Screening Matrices
(6) Alternative Disposal (5) Landfill Optimization Techniques (4) Waste to Energy (3) Conversion Technologies (2) Zero Waste Infrastructure (1) Zero Waste Programs
14
High – Medium – Low Feasibility • Financial Viability
• Technical Viability
• Regional Viability
• Environmental Viability
• Capacity Optimization
• Sustainability
Refined Screening Criteria
15
(6) Alternative Landfill Disposal Options
Christine Arbogast, PE – BAS Bob Hilton – HFH
Lisa Woods – City of San Diego
16
Landfill Disposal Options
25 Landfills Evaluated
• 8 In-County
• 17 Out-of-County
17
In-County Disposal Sites
Gregory Canyon Landfill (proposed) +
Miramar Landfill
Otay Landfill
Sycamore Landfill
City Landfill
Allied Landfill Considered but Rejected
Gregory Canyon Landfill +
San Onofre LF Las Pulgas LF
Borrego LF
Ramona LF
18
Out-of-County Disposal Options
19
MRF/ Loading Facility
Remote Landfill
Intermodal Facility
Waste-by-Rail System Overview
20
Puente Hills Intermodal Facility
21
Rail Haul
22
(5) Landfill Optimization Techniques
Sonia Nasser, PE , BAS Sylvia Castillo, PE, City of San Diego
23
1. Compaction – Soil Surcharge
• Soil Surcharge • Compact refuse
cell, extend airspace
24
2. Alternative Daily Cover
Tarp-o-matic
25
3. Landfill Reclamation
26
4. Compaction – Computer Aided Earth Moving System (CAES)
• Cell Capacity Extended
• Less Cover Material
• Reduced fuel use-less guesswork onpasses over trash
27
5. Leachate Recirculation
28
6. BioReactor
Yolo County Landfill – California
29
7. Steam Injection Miramar Landfill Pilot Study
Photo: STI Engineering
30
(4) Waste to Energy
Chip Clements, PE, Clements Environmental
• Biomass Power Plant: Madera • Anaerobic Digester: DRANCO
(Belgium) and Valorga Facility (Germany) • Gasification and
Pyrolysis: Thermoselect (Chiba, Japan)
• Waste to Energy: SERRF (LongBeach, CA)
• Lee County,Florida
• 31
32
(3) Conversion Technologies
Chip Clements, PE, Clements Environmental
33Thermoselect Facility, Chiba, Japan
1. Gasification and Pyrolysis
34
DRANCO (Brecht, Belgium)
2. Anaerobic Digestion2. Anaerobic Digestion
35ValorgaValorga FacilityFacility Freiberg, GermanyFreiberg, Germany
2. Anaerobic Digestion2. Anaerobic Digestion
36
3. Hydrolysis3. Hydrolysis
37
4. Mechanical Processing4. Mechanical Processing --AutoclaveAutoclave
38
5. Chemical Processing5. Chemical Processing
39
6. MSW Composting6. MSW Composting
40
41
42
43
44
Biomass Power Plant (Madera)Biomass Power Plant (Madera)
45
46
47
Changing World TechnologiesChanging World Technologies Carthage, MOCarthage, MO
48
“Some people see things as they are and say why?
I dream of things that never were and say why not?”
- Robert Kennedy
49
(2) Zero Waste Infrastructure
Chip Clements, PE, Clements Environmental
Christine Arbogast, PE, Bryan A. Stirrat & Associates
50
Zero Waste Infrastructure Examples
51
SAFE CenterSAFE Center (Solvents, Automotives, Flammables & Electronics)(Solvents, Automotives, Flammables & Electronics)
52
Loading Transfer TruckLoading Transfer Truck
53
Commercial MRFCommercial MRF
54
Transfer Station II (Oxnard)Transfer Station II (Oxnard)
55
Curbside MRFCurbside MRF
56
Recovery Parks
• Industrial: Provide campus for symbiotic zero waste facilities (recycling, power, manufacturing)
• Public Service: Provide convenient drop off for local residents (usually free), ReUse Store
58
Monterey Resource Recovery Park
60
Urban Ore RR Park, Berkeley CA
61
62
Cabazon Resource Recovery Park
63
Miramar Recycling & Transfer Station Feasibility Study
64
C&D ProcessingC&D Processing
65
Sorting C&DSorting C&D
66
C&D ProductsC&D Products
67
Greenwaste Chip & GrindGreenwaste Chip & Grind
68
CompostingComposting
69
(1) Zero Waste Programs
Chip Clements, P. E. - Clements Environmental Stephen Grealy – City of San Diego/ESD
70