city of monash | monash council - 1 jacksons road ......table 3 weekly waste generation rates usage...

14
Melbourne Office L3 289 Wellington Parade South EAST MELBOURNE VIC 3002 t +613 9622 9700 [email protected] Bendigo Office L1 133 McCrae Street BENDIGO VIC 3550 t +613 5442 6333 [email protected] Darwin Office 82 Smith Street DARWIN NT 0800 t +618 8980 5900 [email protected] www.irwinconsult.com.au Directors Joe Bruno, Phil Gardiner Peter Hale, Barry Roben, Dean Whiteley Member Green Building Council Australia ABN 89 050 214 894 17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17 1 Jacksons Road, Mulgrave Waste Management Plan 8 September 2017 Revision 01 Job no: 17ME0494

Upload: others

Post on 30-Jan-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

  • Melbourne Office L3 289 Wellington Parade South EAST MELBOURNE VIC 3002 t +613 9622 9700 [email protected]

    Bendigo Office L1 133 McCrae Street BENDIGO VIC 3550 t +613 5442 6333 [email protected]

    Darwin Office 82 Smith Street DARWIN NT 0800 t +618 8980 5900 [email protected] www.irwinconsult.com.au

    Directors Joe Bruno, Phil GardinerPeter Hale, Barry Roben, Dean Whiteley

    Member Green Building Council Australia

    ABN 89 050 214 894 17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    1 Jacksons Road, Mulgrave Waste Management Plan

    8 September 2017 Revision 01

    Job no: 17ME0494

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    Irwinconsult has prepared this report with the following conditions:

    � The report may only be used by the client for the purpose for which it was commissioned.

    � The report may only be reproduced in full.

    � The report shall not be considered as relieving any other party of their responsibilities, liabilities or contractual obligations.

    � The report addresses the engineering disciplines noted within only.

    � The report does not address the presence of asbestos or other contaminative materials.

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 2 of 11

    Document Control Project Title: 1 Jacksons Road, Mulgrave

    Project No: 17ME0494

    Revision Date File name 17ME0494-20170829-HT1-Waste Management Plan-0.Docx

    00 05/09/2017

    Description Draft Waste Management Plan

    Prepared Checked Approved

    Initial HT1 BP2 BP2

    Date 05/09/2017 06/09/2017 06/09/2017

    01 08/09/2017

    File name 17ME0494-20170908-HT1-Waste Management Plan-01.Docx

    Description Final Waste Management Plan

    Prepared Checked Approved

    Initial HT1 BP2 BP2

    Date 08/09/2017 08/09/2017 08/09/2017

    File name

    Description

    Prepared Checked Approved

    Initial

    Date

    File name

    Description

    Prepared Checked Approved

    Initial

    Date

    File name

    Description

    Prepared Checked Approved

    Initial

    Date

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 3 of 11

    Contents

    1 Summary ................................................................................................................. 4

    2 Introduction ............................................................................................................. 5

    3 Land Use .................................................................................................................. 5

    4 Waste Management Plan ....................................................................................... 5

    4.1 Waste Generation .................................................................................................................. 5

    4.2 Waste Systems ...................................................................................................................... 6

    4.2.1 Garbage ................................................................................................................................................ 6

    4.2.2 Commingled Recycling ......................................................................................................................... 6

    4.3 Bin Quantity, Size and Collection Frequency ...................................................................... 7

    4.4 Bin Storage Area & Location ................................................................................................ 7

    4.5 Bin Colour and Supplier ....................................................................................................... 7

    4.6 Signage .................................................................................................................................. 8

    4.7 Waste Collection Methodology ............................................................................................ 8

    5 Standards & Compliance ....................................................................................... 9

    5.1 Ventilation .............................................................................................................................. 9

    5.2 Washing and Vermin Protection .......................................................................................... 9

    5.3 Noise Reduction .................................................................................................................... 9

    6 High Level Purchasing Schedule .......................................................................... 9

    6.1 Supplier Contact Information ............................................................................................... 9

    Appendix A Scaled Waste Room Drawings ............................................................ 10

    Appendix B Collection Vehicle Swept Paths .......................................................... 11

    List of Figures Figure 1 Example Bin Stations ............................................................................................................................. 6

    Figure 2 Sustainability Victoria Signage ............................................................................................................... 8

    List of Tables Table 1 Waste Systems ...................................................................................................................................... 4

    Table 2 Development Summary .......................................................................................................................... 5

    Table 3 Weekly Waste Generation Rates ........................................................................................................... 5

    Table 4 Weekly Waste Generation Assessment ................................................................................................. 5

    Table 5 Garbage Bin Information and Capacity .................................................................................................. 7

    Table 6 Commingled Recycling Bin Information and Capacity ........................................................................... 7

    Table 7 Typical Bin Dimensions .......................................................................................................................... 7

    Table 8 Waste Storage Area Requirements ....................................................................................................... 7

    Table 9 Bin Collection Summary ......................................................................................................................... 8

    Table 10 Equipment Supply Schedule .................................................................................................................. 9

    Table 11 Supplier Contact List .............................................................................................................................. 9

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 4 of 11

    1 Summary

    The below is a summary of the waste management strategy proposed for the subject site. The complete report must be read in detail prior to implementing the operational waste management plan. The project comprises of the development of a two storey childcare centre located at 1 Jacksons Road, Mulgrave. The development is proposed to have a capacity for 200 children, and is to contain eight childcare rooms with associated facilities including:

    � A library.

    � Dining room.

    � Outdoor play areas.

    � Multi-purpose/training rooms.

    � Art, music and exercise rooms.

    � Reception, office and staff room amenities. The waste systems within Table 1 below are proposed for the development. Table 1 Waste Systems

    Waste Stream Bin System Collections Per Week

    Garbage Two 660 litre bins 2

    Commingled Recycling Two 660 litre bins 2

    Waste bins will be collected by a private contractor directly from the ground level bin store provided. Collection vehicles are to enter and exit the site via the Jacksons Road crossover and prop within the loading bay provided in the car park area to perform collections (refer to Section 4.7 for further details).

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 5 of 11

    2 Introduction

    The following Waste Management Plan has been prepared for a proposed childcare centre development located at 1 Jacksons Road, Mulgrave. This Waste Management Plan (WMP) has been prepared based on current best practice waste management methodology and technologies commonly available in Australia. The waste generation rates provided within are based on the City of Melbourne Guidelines for Preparing a Waste Management Plan (2017) and case study data held by Irwinconsult.

    3 Land Use

    Client: Frondell Properties C/- Gallagher Jeffs

    Planning Application Number: To be allocated.

    Land Use Type: Commercial

    Number of Levels: 2

    Table 2 Development Summary

    Commercial

    Type Area

    Childcare Space 696m2

    Office (Reception / Office / Staff Room) 115m2

    4 Waste Management Plan

    4.1 Waste Generation

    Commercial waste generation rates per week are shown in Table 3 and are based on a 5 day per week operation. These rates provide a figure of 350 litres of waste per 100m2 of childcare space per week for each stream (garbage and recycling). This rate incorporates for waste generated by both the childcare and auxiliary use spaces such as the dining room, library, and art/music/exercise rooms. “Childcare space”, as considered by this report, is that which is intended as the primary area in which childcare activities will be undertaken. As such, the spatial allocation for “childcare space” excludes ancillary use rooms such as the library or art room. This consideration is derived from the methodology utilised within the case study data informing the waste generation rates adopted within this report. Table 3 Weekly Waste Generation Rates

    Usage Garbage (L/100m2/week) Recycling (L/100m2/week)

    Childcare Space 350 350

    Office (Reception / Office / Staff Room) 50 50

    An assessment of waste generated within the development is shown within Table 4. Table 4 Weekly Waste Generation Assessment

    Usage Area / Qty Garbage (L/week) Recycling (L/week)

    Childcare Space 696m2 2,436 2,436

    Office (Reception / Office / Staff Room) 115m2 58 58

    TOTAL 2,494 2,494

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 6 of 11

    4.2 Waste Systems

    Waste shall be sorted on-site by staff and cleaners as appropriate into the following streams:

    � Garbage (General Waste)

    � Commingled Recycling The use of bin stations throughout the childcare facility is highly recommended to encourage diversion of waste from landfill. This system incorporates the provision of multiple bins for different waste streams at central locations and common areas for ease of disposal. This system is beneficial as users are required to make a conscious decision as to which bin they place their items in. Implementation of these systems often results in a reduced volume of waste to landfill. Figure 1 Example Bin Stations

    4.2.1 Garbage

    The childcare centre shall be furnished with plastic lined bins for the temporary holding of garbage to have a minimum cumulative capacity of:

    � 70 litres per 100m2 childcare space.

    � 10 litres per 100m2 office space. It is recommended ancillary use spaces are furnished with bins to have a minimum cumulative volume of 10 litres per 100m2. Staff/cleaners will transfer the waste as required to the appropriate 660 litre bin with the external ground level bin store (refer to Appendix A). 4.2.2 Commingled Recycling

    The childcare centre shall be furnished with plastic lined bins for the temporary holding of commingled recycling to have a minimum cumulative capacity of:

    � 70 litres per 100m2 childcare space.

    � 10 litres per 100m2 office space. It is recommended ancillary use spaces are furnished with bins to have a minimum cumulative volume of 10 litres per 100m2. Staff/cleaners will transfer the waste as required to the appropriate 660 litre bin with the external ground level bin store (refer to Appendix A). Recyclables shall be disposed of loosely.

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 7 of 11

    4.3 Bin Quantity, Size and Collection Frequency

    Table 5 through Table 7 contain information regarding bin quantity, size and frequency of collection. Table 5 Garbage Bin Information and Capacity

    Garbage

    Bin Size Quantity Bins Collections Per Week Weekly Capacity Weekly Volume

    660 Litre 2 2 2,640L 2,494L

    Table 6 Commingled Recycling Bin Information and Capacity

    Recycling

    Bin Size Quantity Bins Collections Per Week Weekly Capacity Weekly Volume

    660 Litre 2 2 2,640L 2,494L

    Table 7 Typical Bin Dimensions

    Typical Bin Dimensions (mm)

    Capacity Width Depth Height

    660 Litre 1260 780 1330

    4.4 Bin Storage Area & Location

    Table 8 demonstrates the cumulative area requirements (excluding circulation) and provision of waste areas. Table 8 Waste Storage Area Requirements

    Usage Area Required Area Provided

    General Waste 1.96m2 12.48m2

    Recycling 1.96m2

    TOTAL 3.92m2 12.48m2

    Please refer to scaled waste room drawing shown in Appendix A.

    4.5 Bin Colour and Supplier

    All bins will be provided by private supplier. The below bin colours are specified by Australian Standard AS4123.7 2006, however due the private nature of the collection, these are only recommendations and are not mandatory:

    � Garbage (general waste) bins shall have red lids with dark green or black body.

    � Recycle bins shall have yellow lids with dark green or black body. Private collection contractors often supply their own bins for collection.

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 8 of 11

    4.6 Signage

    Waste drop-off areas and bins will be clearly marked and signed with the industry standard signage approved by Sustainability Victoria or equivalent. The typical Sustainability Victoria signage is depicted in Figure 2 Commercial tenants will be instructed by building management to adhere to these requirements. Figure 2 Sustainability Victoria Signage

    4.7 Waste Collection Methodology

    Waste bins will be collected by a private contractor in accordance with Table 9 below. Table 9 Bin Collection Summary

    Stream Bin Size Bin Quantity Collections Per Week

    Garbage 660 litre 2 2

    Recycling 660 litre 2 2

    Collections will occur on-site directly from the external ground level bin store via an 8.8 metre long MRV or shorter collection vehicle. Collection vehicles will enter and exit the site in a forward direction via the Jacksons Road crossover (refer to Appendix B for swept path analysis prepared by others showing sufficient access). Collection vehicles will prop within the loading bay provided within the ground level car park area (refer to Appendix A), with operators to collect bins directly from the bin store and return them immediately upon emptying. Bins will not be stored outside of the title boundary or presented to kerb for collection at any time. Building management are responsible for providing access to the bin store for collection operators as appropriate. Typically, operators are provided with keypad/swipe card/key access to the waste storage area(s).

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 9 of 11

    5 Standards & Compliance

    5.1 Ventilation

    Ventilation will be provided in accordance with Australian Standard AS1668.

    5.2 Washing and Vermin Protection

    An appropriately drained wash down area will be provided adjacent to the external bin store in which each bin is to be washed regularly by building management. Bin washing areas or bin wash bays must discharge to a grease trap. Alternatively, a third party bin washing service can be engaged to perform this service. Bin washing suppliers must retain all waste water to within their washing apparatus and not impact on the drainage provisions of the site.

    5.3 Noise Reduction

    All waste areas shall meet BCA and AS2107 acoustic requirements as appropriate with operational hours and collection times assigned to minimise acoustic impact on surrounding premises.

    6 High Level Purchasing Schedule

    Table 10 lists the waste equipment required for the development under the conditions proposed within this report. A complimentary list of suppliers is provided for convenience. Table 10 Equipment Supply Schedule

    Item Quantity Waste Stream Lid Colour Body Colour Supplier

    660 litre 2 Garbage Red Dark Green / Black Private Supplier*

    2 Recycling Yellow Dark Green / Black Private Supplier*

    *Private waste collection contractors often supply their own bins for collection.

    6.1 Supplier Contact Information

    A complimentary listing of contractors and equipment suppliers is provided in Table 11 below for your reference. You are not obligated to procure goods/services from these companies. This is not, nor is it intended to be, a complete list of available suppliers. Irwinconsult does not warrant (or make representations for) the goods/services provided by these suppliers. Table 11 Supplier Contact List

    Service Type Contractor / Supplier Name Phone Website

    Private Waste Collectors

    Citywide Service Solutions Pty Ltd (03) 9261 5000 www.citywide.com.au

    SUEZ Environment 13 13 35 www.sita.com.au

    Cleanaway 13 13 39 www.cleanaway.com.au

    Veolia 132 955 www.veolia.com

    Equipment Suppliers Sulo Australia (Bin Supplier) 1300 364 388 www.sulo.com.au

    Bin Washing Services

    The Bin Butlers 1300 788 123 www.thebinbutlers.com.au

    Kerbside Clean-A-Bin (03) 9830 7381 www.kerbsidecleanabin-srp.com.au

    Calcorp Services 1800 225 267 www.calcorpservices.com.au

    WBCM Environmental Australia 1300 800 621 www.wbcm-aust.com.au

    Odour Control WBCM Environmental 1300 800 621 www.wbcm-aust.com.au

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170908-HT1-Waste Management Plan-01.docx BP 8/09/17

    Page 10 of 11

    Appendix A Scaled Waste Room Drawings

  • OUTDOOR DECK

    BELOW

    530m2

    OAK TREE

    ROOF AREA

    864m2

    OAK TREE

    RAMP

    SH

    OR

    T T

    ER

    M P

    AR

    KIN

    G B

    AY

    S

    98

    76

    54

    32

    1

    10

    11

    12

    13

    14

    15

    16

    17

    18

    28

    29

    3031

    3233

    3435

    36

    37

    3839

    GUTTER 83.43

    TWO STOREY

    NO. 11

    RIDGE 85.76

    SINGLE STOREY

    NO. 6

    RIDGE 84.65

    BRICK HOUSE

    GUTTER 81.75

    TWO STOREY

    NO. 7

    RIDGE 87.52

    BRICK HOUSE

    GUTTER 82.78

    TWO STOREY

    NO. 5

    RIDGE 89.63

    BRICK HOUSE

    TWO STOREY

    NO. 3

    RIDGE 90.74

    BRICK HOUSE

    GUTTER 88.62

    TWO STOREY

    NO. 13

    RIDGE 84.11

    BRICK HOUSE

    GUTTER 82.08

    TWO STOREY

    NO. 15

    RIDGE 83.60

    BRICK HOUSE

    TWO STOREY

    NO. 17

    RIDGE 82.17

    BRICK HOUSE

    TWO STOREY

    NO. 19

    RIDGE 82.08

    BRICK HOUSE

    PA

    RA

    PE

    T 7

    8.1

    7

    HIGH PALING FENCETOP OF FENCE 84.4TOP OF FENCE 86.9 TOP OF FENCE 83.2TOP OF FENCE 80.99

    TOP OF FENCE 79.50HIGH PALING FENCE TOP OF FENCE 79.01 TOP OF FENCE 77.70 TOP OF FENCE 76.43

    LOADING BAY

    RID

    GE

    72

    .98

    GUTTER 73.02

    RIDGE 74.86

    GU

    TT

    ER

    73

    .70

    GU

    TT

    ER

    74

    .56

    GU

    TT

    ER

    76

    .89

    GUTTER 74.77

    EXISTING

    WAREHOUSE

    SUBJECT TO

    SEPARATE PLANNING

    APPLICATION

    JAC

    KS

    ON

    S R

    OA

    D

    FO

    OT

    PA

    TH

    4043

    3050

    4977

    6194

    2795

    BOUNDARY SETBACK

    6000

    4000

    7597

    3845

    3720

    3074

    5366

    7996

    8004

    9113

    6449

    8198

    CANOPY BELOW

    CA

    NO

    PY

    BE

    LO

    W

    ONE WAY

    ON

    E W

    AY

    OUTDOOR TIMBER DECK BELOW

    BALCONY

    BELOW

    19

    2021

    2223

    24

    2526

    27

    40 41 42 43 44

    SINGLE STOREY

    GUTTER 85.55

    SINGLE STOREY

    GUTTER 87.13

    SILL 86.45HEAD 87.00

    SILL 85.87HEAD 87.00

    SILL 85.87HEAD 87.00

    SINGLE STOREY

    SILL 87.01HEAD 88.18

    SILL 87.01HEAD 88.18

    SINGLE STOREY

    SILL 82.08

    HEAD 83.26

    SILL 83.14

    HEAD 83.26

    SILL 82.08

    HEAD 83.26

    BRICK HOUSE

    SINGLE STOREY

    ROOF 81.00

    SILL 80.91

    HEAD 81.91

    SILL 81.08

    HEAD 81.91

    SILL 80.91

    HEAD 81.91

    SINGLE STOREY

    GUTTER 81.15

    SILL 79.85

    HEAD 80.80

    SILL 79.85

    HEAD 80.80

    SINGLE STOREY

    RIDGE 78.87

    RIDGE 82.17

    SILL 79.64HEAD 80.15

    PA

    RA

    PE

    T 7

    7.5

    7

    SINGLE STOREY

    HEAD 77.24 HEAD 76.87

    PARAPET 78.17

    HEAD 79.83

    HEAD 79.68

    SILL 79.68

    HEAD 79.68

    SILL 79.68 SILL 78.24

    HEAD 79.68

    AHD:78.06

    AH

    D:7

    7.4

    1

    76.74AHD:75.99AHD:76.28

    AHD:75.09

    AHD:72.29

    AHD:70.09

    AHD:71.82

    AHD:74.32

    AHD:74.21

    AHD:75.88

    AHD:76.17

    AHD:72.59

    AHD:75.88

    2966

    PLANTLIFT

    OVERRUN

    3600

    CLEAR ZONENEW

    BAY

    NEW

    BAY

    4800

    6226

    7467

    600

    2000

    600

    SETBACK FROM JACKSONS RD

    8297

    450

    3022

    600

    2600 2600 2600 2600 2600

    4700

    46006103

    2450

    2450

    2450

    2450

    2450

    2450

    2450

    2450

    2500

    90°

    2450

    2450

    2450

    2450

    2450

    2450

    2450

    2450

    2450

    24502420

    24202420

    24202420

    24202420

    24202420

    4900

    4900

    24502400

    24002400

    24002450

    26002600

    5014

    4900

    26002600

    8985

    6146

    6659

    1700

    PALLET

    LIFT

    DELIVERY

    ZONE

    12397

    JA

    CK

    SO

    NS

    RO

    AD

    SH

    OR

    T T

    ER

    M P

    AR

    KIN

    G B

    AY

    S

    SHORT TER

    M PARKING B

    AYS

    STAFF PARK

    ING BAYS

    STAFF PARKING BAYS

    STAFF PAR

    KING

    BAYS

    RETAINING WALL PLANTER BOX

    OUTDOOR

    TIMBER

    DECK BELOW

    BOUNDARY

    RETAINING WALL

    BIN

    STORE

    CA

    NO

    PY

    BE

    LOW

    CA

    NO

    PY

    BE

    LOW

    5200

    2400

    Drawing No.Job No.

    Date

    Drawn

    Scale

    T 61 3 9699 6688sjb.com.au

    SJB Architects

    Level 5, 18 Oliver Lane Melbourne VIC3000 AustraliaRevision

    Chk.

    Sheet Size

    @ A1

    Drawing

    ProjectIn accepting and utilising this document the recipient agrees that SJB Architecture Pty. Ltd. ACN 065 207 490 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose.

    The Builder/Contractor shall verify job dimensions prior to any work commencing. Figured dimensions shall take precedence over scaled work.

    Client Name & Logo Rev. Date Revision By Chk.North Point

    1 : 250

    8/0

    9/2

    017 1

    0:3

    3:1

    9 A

    M

    21264

    JM BF

    SD01_A_01

    Childcare Centre Mulgrave

    Site Plan

    ADIDEM GROUP16.08.2017 Issue for Information JM BF

    28.08.2017 Issue for Information JM BF

    29.08.2017 Issue for Information JM BF

    30.08.2017 Issue for Information JM BF

    08.09.2017 Issue for Information JM BF

  • UP

    UP

    SD06_A_01

    1SD06_A_01

    1

    TREE PROTECTION RADIUS

    R 10200STORE

    SD06_A_01

    2

    SD06_A_01

    2

    RECEPTION

    OFFICE

    21m2

    ENTRY

    1400

    4160

    6000

    SD06_A_02

    4

    SD06_A_02

    4

    SD06_A_02

    3

    SD06_A_02

    3

    OUTDOOR PLAY AREA

    570m2

    OUTDOOR PLAY AREA

    1030m2

    OUTDOOR TIMBER DECK

    OU

    TDO

    OR

    TIM

    BE

    R D

    EC

    K

    OAK TREE

    1200

    PLAY

    AREA

    STORE

    15m2

    POD

    AHD 74.072

    JA

    CK

    SO

    NS

    RO

    AD

    2400

    3 YR OLDS86.00 m²

    2-3 YR OLDS71.00 m²

    0-1 YR OLDS70.00 m²

    1-2 YR OLDS138.00 m²

    COT AREA14.00 m²

    3 YR OLDS87.00 m²

    4 YR OLDS86.00 m²

    2-3 YR OLDS71.00 m²

    C.WC4 YR OLDS87.00 m²

    LIBRARY36.00 m²

    OFFICE18.00 m²

    MEETINGDINING SPACE

    69.00 m²

    POD

    MEETING

    STORE8.00 m²

    BOH AND SERVICES17.00 m²

    S.WCS.WC

    PANTRY

    COMMERCIAL KITCHEN32.00 m²

    SERVERY23.00 m²

    COLD ROOM

    FREEZER

    LDY

    C.WC

    STORE

    AHD 74.072

    STORE

    PLAY

    AREA

    STORE

    10m2

    2200

    C.WC

    2200

    C.WC

    CH

    AN

    GE

    BE

    NC

    H

    GUTTER 83.43

    TWO STOREY

    NO. 11

    RIDGE 85.76

    SINGLE STOREY

    NO. 6

    RIDGE 84.65

    BRICK HOUSE

    GUTTER 81.75

    TWO STOREY

    NO. 13

    RIDGE 84.11

    BRICK HOUSE

    GUTTER 82.08

    TWO STOREY

    NO. 15

    RIDGE 83.60

    BRICK HOUSE

    TWO STOREY

    NO. 17

    RIDGE 82.17

    BRICK HOUSE

    GUTTER 80.33

    TWO STOREY

    NO. 19

    RIDGE 82.08

    BRICK HOUSE

    PA

    RA

    PE

    T 7

    8.1

    7

    TOP OF FENCE 80.99TOP OF FENCE 79.50HIGH PALING FENCE TOP OF FENCE 79.01 TOP OF FENCE 77.70 TOP OF FENCE 76.43

    SINGLE STOREY

    SILL 82.08

    HEAD 83.26

    SILL 83.14

    HEAD 83.26

    SILL 82.08

    HEAD 83.26

    BRICK HOUSE

    SINGLE STOREY

    ROOF 81.00

    SILL 80.91

    HEAD 81.91

    SILL 81.08

    HEAD 81.91

    SILL 80.91

    HEAD 81.91

    SINGLE STOREY

    GUTTER 81.15

    SILL 79.85

    HEAD 80.80

    SILL 79.85

    HEAD 80.80

    SINGLE STOREY

    RIDGE 78.87

    RIDGE 82.17

    SILL 79.64

    HEAD 80.15

    PA

    RA

    PE

    T 7

    7.5

    7

    SINGLE STOREY

    HEAD 77.24 HEAD 76.87

    PARAPET 78.17

    HEAD 79.83

    HEAD 79.68

    SILL 79.68

    HEAD 79.68

    SILL 79.68 SILL 78.24

    HEAD 79.68

    AHD:75.99AHD:76.28

    AHD:75.09

    AHD:72.29

    AHD:70.09

    AHD:74.32

    AHD:74.21

    AHD:76.17

    AHD:72.59

    AHD:73.53

    AHD:73.65

    AHD:74.00

    AHD:73.88

    75976194

    3845

    3720

    3074

    5366

    SERVICES LOCATED

    UNDER DECK

    SUBJECT TO SEPARATE

    PLANNING APPLICATION

    BIN

    STORE

    RAMP

    SH

    OR

    T T

    ER

    M P

    AR

    KIN

    G B

    AY

    S

    98

    76

    5

    43

    21

    10

    11

    12

    13

    14

    15

    16

    17

    18

    29

    3031

    GUTTER 83.43

    TWO STOREY

    NO. 11

    RIDGE 85.76

    SINGLE STOREY

    NO. 6

    RIDGE 84.65

    BRICK HOUSE

    GUTTER 81.75

    TWO STOREY

    NO. 13

    RIDGE 84.11

    BRICK HOUSE

    GUTTER 82.08

    TWO STOREY

    NO. 15

    RIDGE 83.60

    BRICK HOUSE

    TWO STOREY

    NO. 17

    RIDGE 82.17

    BRICK HOUSE

    TWO STOREY

    NO. 19

    RIDGE 82.08

    BRICK HOUSE

    PA

    RA

    PE

    T 7

    8.1

    7

    TOP OF FENCE 80.99TOP OF FENCE 79.50HIGH PALING FENCE TOP OF FENCE 79.01 TOP OF FENCE 77.70 TOP OF FENCE 76.43

    LOADING BAY

    19

    2021

    22

    SINGLE STOREY

    SILL 82.08

    HEAD 83.26

    SILL 83.14

    HEAD 83.26

    SILL 82.08

    HEAD 83.26

    BRICK HOUSE

    SINGLE STOREY

    ROOF 81.00

    SILL 80.91

    HEAD 81.91

    SILL 81.08

    HEAD 81.91

    SILL 80.91

    HEAD 81.91

    SINGLE STOREY

    GUTTER 81.15

    SILL 79.85

    HEAD 80.80

    SILL 79.85

    HEAD 80.80

    SINGLE STOREY

    RIDGE 78.87

    RIDGE 82.17

    SILL 79.64

    HEAD 80.15

    PA

    RA

    PE

    T 7

    7.5

    7

    SINGLE STOREY

    HEAD 77.24 HEAD 76.87

    PARAPET 78.17

    HEAD 79.83

    HEAD 79.68

    SILL 79.68

    HEAD 79.68

    SILL 79.68 SILL 78.24

    HEAD 79.68

    76.74AHD:75.99AHD:76.28

    AHD:75.09

    AHD:72.29

    AHD:70.09

    AHD:71.82

    AHD:74.32

    AHD:74.21

    AHD:76.17

    AHD:72.59

    AHD:75.88

    CLEAR ZONE

    PALLET

    LIFT

    DELIVERY

    ZONE

    600

    2000

    600

    8298NURSERY18.00 m²

    S.WC

    S.WC

    BOUNDARY

    RETAINING WALL

    5200

    2400

    66

    0L

    66

    0L

    66

    0L

    66

    0L

    1:14 1:14 1:14

    RAMP RAMP

    Drawing No.Job No.

    Date

    Drawn

    Scale

    T 61 3 9699 6688sjb.com.au

    SJB Architects

    Level 5, 18 Oliver Lane Melbourne VIC3000 AustraliaRevision

    Chk.

    Sheet Size

    @ A1

    Drawing

    ProjectIn accepting and utilising this document the recipient agrees that SJB Architecture Pty. Ltd. ACN 065 207 490 T/A SJB Architects, retain all common law, statutory law and other rights including copyright and intellectual property rights. The recipient agrees not to use this document for any purpose other than its intended use; to waive all claims against SJB Architects resulting from unauthorised changes; or to reuse the document on other projects without the prior written consent of SJB Architects. Under no circumstances shall transfer of this document be deemed a sale. SJB Architects makes no warranties of fitness for any purpose.

    The Builder/Contractor shall verify job dimensions prior to any work commencing. Figured dimensions shall take precedence over scaled work.

    Client Name & Logo Rev. Date Revision By Chk.North Point

    1 : 200

    8/0

    9/2

    017 1

    0:3

    3:2

    3 A

    M

    21264

    JM BF

    SD02_A_02

    Childcare Centre Mulgrave

    Ground Floor Plan

    ADIDEM GROUP27.04.2017 Issue for Information JM BF

    01.06.2017 Issue for Information JM BF

    14.07.2017 Issue for Information JM BF

    08.08.2017 Issue for Information JM BF

    09.08.2017 Issue for Information JM BF

    16.08.2017 Issue for Information JM BF

    28.08.2017 Issue for Information JM BF

    29.08.2017 Issue for Information JM BF

    08.09.2017 Issue for Information JM BF

  • 1 Jacksons Road, Mulgrave Waste Management Plan

    17ME0494-20170829-HT1-Waste Management Plan-01.docx HT 8/09/17

    Page 11 of 11

    Appendix B Collection Vehicle Swept Paths

  • C. GREENLANDP2

    1:250

    4 SEPTEMBER 2017

    A. HARMER

    PROPOSED CHILDCARE CENTRE

    8.8m MRV SWEPT PATH ASSESSMENT

    V115200-AT02-01

    WISE WELLNESS SITE

    1 JACKSONS ROAD, MULGRAVE

    2.5 5

    C. GREENLAND

    SWEPT PATH KEY

    ASSUMED SPEED 5km/h

    FROM VEHICLE BODY300mm CLEARANCE

    VEHICLE BODY PATH

    VEHICLE TYRE PATH

    VEHICLE CENTRE LINE

    Lock to Lock Time

    Width

    Track

    Steering Angle

    metres

    :

    :

    2.50

    2.50

    :

    38.7:

    6.0

    1.50 5.00

    8.80

    SERVICE VEHICLE

    OAK TREE

    RAMP

    SH

    ORT T

    ER

    M P

    AR

    KIN

    G B

    AYS

    98

    76

    54

    32

    1

    10

    11

    12

    13

    14

    15

    16

    17

    18

    2930

    31

    HIGH PALING FENCE TOP OF FENCE 80.99

    LOADING BAY

    6194

    7597

    ONE WAY

    ONE W

    AY

    BALCONY

    BELOW

    76.74AHD:75.99AHD:76.28

    AHD:75.09

    AHD:74.32

    AHD:74.21

    AHD:76.17

    AHD:75.88

    800

    PLANTLIFT

    OVERRUN

    3600

    CLEAR ZONENEW

    BAY

    4800

    6219

    7467

    6117

    SERVICE VEHICLEAUSTROADS 2013 (AU)

    (c) 2016 Transoft Solutions, Inc. All rights reserved.

    DRAWING NO. ISSUE

    SCALE 0DESIGNED

    APPROVED BY DATE ISSUED

    DESIGN CHECK

    CAD FILE NO.

    V115200-AT02-P2.dgn

    4/09/2017

    ON

    Draftin

    g.H

    otdesk

    PL

    OTTE

    D B

    Y :

    AT

    1:35:2

    8 P

    M

    A4

    GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

    SHOULD BE PROVEN ON SITE. NO GUARANTEE IS

    APPROXIMATE ONLY AND THEIR EXACT POSITION

    THE LOCATIONS OF UNDERGROUND SERVICES ARE

    BEWARE OF UNDERGROUND SERVICES

    WARNING

    WITHOUT NOTIFICATION

    ONLY SUBJECT TO CHANGE

    FOR DISCUSSION PURPOSES

    PRELIMINARY PLAN

    08 6169 1000Perth

    07 4722 2765Townsville

    07 5510 4814Gold Coast

    08 8334 3600Adelaide

    02 6243 9400Canberra

    07 3113 5000Brisbane

    02 8448 1800Sydney

    03 9851 9600Melbourne

    nsultantscowww.gta.com.au

    GTA