cio isu application team capacity management information ... manual _v1.0.pdfcio isu application...

21
CIO ISU Application Team Capacity Management Information System (CMIS)

Upload: others

Post on 19-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

Page 2: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

1

Table of Contents

1 Document Control

1.1 Authored By

1.2 Approvals

1.3 Version History

2 Introduction

3 Benefit of the tool

4 Countries using the tool & Gone live date

5 Client

6 Business process flow

7 Process flow description

8 User screen

9 Upload capacity reports

10 Threshold breached tracker

11 Reports

12 Admin

13 User manual

Page 3: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

2

1 Document Control

1.1. Authored by:

By signing this document, I tender it for approval.

Kumar Amrit Analyst Date: 01/09/2017

1.2. Approvals:

Role Print Name Date Version

Number

Signature

Team Lead Praveenkumar. Anna 02/Jan/2017 1.0

Approval Sweta. davda 1.0

Process team Sumitha. Arun 1.0

1.3. Version History

Effective Date Version Author/Company Description of Change

02/01/2017 1.0 Kumar. Amrit Initial Draft

Page 4: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

3

Capacity Management Information System Tool

2. Introduction:

Capacity Management Information System (CMIS) tool is used to create central repository of

capacity reports and creation of workflow to address the action items (threshold breached

devices like network, voice and server) assigned to the respective domain teams (Network,

Voice and Server team).

3. Benefits of the tool

This tool would help in reducing the man hours spent by capacity management team, location

Network, Voice and Server Team for consolidating the data from multiple excel files and arriving

at capacity analysis, mitigation control and action tracker. It will act as a single platform for

tracking all the device utilization (i.e. Network, Voice, Server).

4. Countries using the Tool & Gone live date

India

Philippines

China

Bangladesh

Gone Live: 16th Jan 2017 for the above regions

5. Client:

Infrastructure Services for Accenture (ISA) – Domain Team and Capacity Management

Team

Domain Team comprises of: NS(Network) Team, DS(Server) Team, Voice Team.

Page 5: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

4

6. Business Process flow

Figure 1: Business process flow for CMIS (Capacity management information system) tool.

7. Process Flow Description:

Domain Team(Network/Voice/Server) uploads utilization report CTB (Capacity

Threshold Breached) ticket generated from the tool, if threshold of device is breached

two consecutive time Capacity Management team reviews the CTB ticket Assigns

Domain Engineer for a ticket Domain Engineer takes action CTB ticket again comes

back to Capacity Management team for final review Capacity management team can

perform actions on the ticket like ‘On Hold’, ‘User to Clarify’ or ‘Close’.

Page 6: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

5

User Screen

User to login with Enterprise ID& password using the below URL. URL: https://cmis.accenture.com/

Figure 2:user login screen User will be presented with options to select region

Figure 3: Region selection screen in CMIS.

Page 7: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

6

On Selection of region, user will be navigated to the home screen.

Figure 4: Home page of CMIS tool.

On the Home page, User can navigate to multiple sections:

Upload Capacity Reports – Allows users (domain and capacity management team) to

upload device utilization report.

Threshold Breached Tracker – Helps the capacity team members to take actions and

keep a track on generated CTB (Capacity Threshold Breached) ticket.

Reports – Allows the Capacity Management team to generate raw and graphical

reports.

Admin – Allows the admin user (capacity team) to maintain master data for facilities and

engineers.

User Manual – Provides the user with a guide to use the tool.

Upload Capacity Reports:

This section will have three sub section – Network, Device, Server device.

User (Domain Team) will select their respective device type and download the template

in the local system.

Page 8: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

7

User will have to fill the template with relevant data. Column headers highlighted with

yellow color are mandatory.

User then needs to upload the same template (with same file name) in the tool.

All fields marked with Red Asterisk (*) are mandatory fields.

On successful upload of template, user will get a confirmation message for the same.

Post upload of template, user can click on ‘Preview’ option to view/edit the uploaded

data for the current week.

Figure 5: Upload capacity reports sub menus.

Page 9: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

8

Figure 6: Screen to upload utilization report.

Figure 7: Screen for Preview option to preview and edit uploaded data.

Page 10: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

9

Threshold Breached Tracker:

User to click & fill Software Details

This section has different sub menus available for different teams.

Domain team will have ‘Pending Capacity Management team

Capacity team will see a list of CTB (Capacity Threshold Breached) ticket with details for

each ticket.

On click of that, a pop window will open which will show all the parameters for that

device. All the fields will be greyed out except the Remarks, status, incident number,

change request number, assignee.

Once the details are filled, submit the form.

Figure 8: Screen showing sub menus for threshold breached tracker

Page 11: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

10

Figure 9: Screen showing list of all the CTB (Capacity threshold breached) tickets generated

from the tool.

Figure 10: Screen showing CTB ticket details.

Page 12: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

11

Figure 11: Pending for Domain Team Review

Figure 12: Domain team form for the CTB ticket

Page 13: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

12

Figure 13: Final Capacity Team Review

Figure 14: Final Capacity team review screen CTB ticket

Page 14: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

13

Reports:

This section will only be visible to Admin (Capacity Management team) and will be

hidden for domain team.

This section has two sub sections: Raw report and Graphical reports. User can generate

the raw and graphical report based on the device type selected. Under each report type

device types can be selected

Figure 15: Sub menus under Report section.

Figure 16: Raw reports listing all the devices uploaded by the domain team.

Page 15: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

14

Figure 17: Graphical reports showing information for devices uploaded by domain team.

Admin:

This section will only be visible to Capacity management team and will be hidden for

domain team.

This section will have two sub menus: Add/Update Facility, Add/Update Engineer detail

Under Add/Update Engineer details, we have multiple options to add IT lead, server

lead, network lead, voice lead.

The user can view the list of facilities, can update a facility name and can make a facility

active or inactive. Only active facilities will be shown in the drop downs of all the

screens.

Page 16: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

15

Figure 18: Sub sections under Admin module.

Figure 19: Option to edit/update facility details.

Page 17: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

16

Figure 20: Option to edit/add lead details.

Figure 21: Edit/Add IT Lead Details:

Page 18: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

17

Figure 22: Edit/Add Network Lead Details

Figure 23: Edit/Add Voice Lead Details

Page 19: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

18

Figure 24: Edit/Add Server Lead Details

Figure 25: Suggestion Screen

Page 20: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

19

Figure 26: Feedback Screen

Figure 27: Sign out Screen

Page 21: CIO ISU Application Team Capacity Management Information ... Manual _V1.0.pdfCIO ISU Application Team Capacity Management Information System (CMIS) 1 Table of Contents 1 Document Control

CIO ISU Application Team Capacity Management Information System (CMIS)

20

User Manual:

This section will consist of a document which will help user to get familiar with the tool.