cim assignment 2
TRANSCRIPT
-
7/30/2019 CIM Assignment 2
1/3
VI SEM. B.E. (INDUSTRIAL PRODUCTION ENGINEERING)
ASSIGNMENT II
SUBJECT: COMPUTER INTEGRATEDMANUFACTURING SYSTEMS
1 Computer Aided Process Planning(28TH MARCH)
Retrieval Type CAPP System
Generative Type CAPP System
Hybrid CAPP System
SRICHARAN,
ANURAG, MAHESH,VENKATRAMANA,
SUKRUTH
2 Process Planning Systems
(6TH APRIL)
CAM I CAPP
MIPLAN & MULTI CAPP
TIPPS( Totally Integrated Process
Planning)
Benefits of CAPP
TANUJ, ARUN, KUSH,SANCHIT
3 Inspection and Testing(28TH MARCH)
Quality Assurance and Quality Control
(QA & QC)
QC Inspection and QC Testing
MURTAZA, ROHAN,SURYACHANDRA
4 Co- Ordinate Measuring Machine
(28TH MARCH)
Principle of Working
Specification of CMM Benefits and Limitations of CMM
PRASHANTH,
ASHISH, KESHAV,
KARAN
5 Automated Inspection Method
(6TH APRIL)
Optical Inspection Methods
Machine Vision
Scanning Laser Beam
SHUBHOM,
RAGHUMANI,GAURAV, RAJAN,
PRATIK
MANIPAL INSTITUTE OF TECHNOLOGYManipal University, Manipal 576 104
-
7/30/2019 CIM Assignment 2
2/3
Non-Contact and Non-Inspection
6 Computer Integrated Planning Systems
(6TH APRIL)
Introduction
Production Planning and Control(Activities)
Master Production Schedule
GOPALKRISHNA,HIMANSHU,
AKSHAY, SAMARTH
7 Material Requirement Planning (MRP)
(10TH APRIL)
Basic Concepts
Structure and Working of MRP
Role of Computer in MRP, Benefits of
MRP
ANKIT, BHASKAR
ABHISHEK,SOURAVV
AGARWAL,
PARJANYA
8 Capacity Requirement Planning (CRP)
(10TH APRIL)
CRP Input and CRP Output
Inventory Control
SIDHART BHASIN,
PRANAV,SHASHANK, AMAN,
VISWAJEET
9 Shop Floor Control(10TH APRIL)
Phases in Shop Floor
Functions of Shop Floor
TANISTA,SHRAVANI,
MANJARI, SHIVANI
10 Computer Integrated Manufacturing System(11TH APRIL)
Types of Manufacturing System ( SMC,
MC, FMS)
Components of CIM System
Machine tools and related Equipment
MANASVI,
SUSHANTH, PARTH,
ADITYA
11 Material Handling Systems(11TH APRIL)
Flexible Manufacturing System
Introduction to FMS
Components of FMS
NIKHITHA, VIBHU,
AYUSH, UPASNA
12 Flexible Manufacturing System
(6TH APRIL)NIKUNJ, ARNAV,MITUL, SIDHARTH
-
7/30/2019 CIM Assignment 2
3/3
Types of FMS systems
Flexibility in FMS
Building Blocks of FMS
13 Lean Manufacturing
Agile Manufacturing(11TH APRIL)
SRIKAR, ZAMEEL,
RISHAB, HARPREET
Each topic group of Presentation shall have minimum of 4 members each as
specified.
The presentation shall be of Max 15 minutes with 5 minutes Q & A session.
All the members in the group should be compulsorily present on the day of
presentation with a PPT and a printed word document to be submitted.
Order of Presentation will be decided on spot.
Group should mail soft copy of presentation & Word document to