cim assignment 2

Upload: pranav-sachdev

Post on 14-Apr-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 CIM Assignment 2

    1/3

    VI SEM. B.E. (INDUSTRIAL PRODUCTION ENGINEERING)

    ASSIGNMENT II

    SUBJECT: COMPUTER INTEGRATEDMANUFACTURING SYSTEMS

    1 Computer Aided Process Planning(28TH MARCH)

    Retrieval Type CAPP System

    Generative Type CAPP System

    Hybrid CAPP System

    SRICHARAN,

    ANURAG, MAHESH,VENKATRAMANA,

    SUKRUTH

    2 Process Planning Systems

    (6TH APRIL)

    CAM I CAPP

    MIPLAN & MULTI CAPP

    TIPPS( Totally Integrated Process

    Planning)

    Benefits of CAPP

    TANUJ, ARUN, KUSH,SANCHIT

    3 Inspection and Testing(28TH MARCH)

    Quality Assurance and Quality Control

    (QA & QC)

    QC Inspection and QC Testing

    MURTAZA, ROHAN,SURYACHANDRA

    4 Co- Ordinate Measuring Machine

    (28TH MARCH)

    Principle of Working

    Specification of CMM Benefits and Limitations of CMM

    PRASHANTH,

    ASHISH, KESHAV,

    KARAN

    5 Automated Inspection Method

    (6TH APRIL)

    Optical Inspection Methods

    Machine Vision

    Scanning Laser Beam

    SHUBHOM,

    RAGHUMANI,GAURAV, RAJAN,

    PRATIK

    MANIPAL INSTITUTE OF TECHNOLOGYManipal University, Manipal 576 104

  • 7/30/2019 CIM Assignment 2

    2/3

    Non-Contact and Non-Inspection

    6 Computer Integrated Planning Systems

    (6TH APRIL)

    Introduction

    Production Planning and Control(Activities)

    Master Production Schedule

    GOPALKRISHNA,HIMANSHU,

    AKSHAY, SAMARTH

    7 Material Requirement Planning (MRP)

    (10TH APRIL)

    Basic Concepts

    Structure and Working of MRP

    Role of Computer in MRP, Benefits of

    MRP

    ANKIT, BHASKAR

    ABHISHEK,SOURAVV

    AGARWAL,

    PARJANYA

    8 Capacity Requirement Planning (CRP)

    (10TH APRIL)

    CRP Input and CRP Output

    Inventory Control

    SIDHART BHASIN,

    PRANAV,SHASHANK, AMAN,

    VISWAJEET

    9 Shop Floor Control(10TH APRIL)

    Phases in Shop Floor

    Functions of Shop Floor

    TANISTA,SHRAVANI,

    MANJARI, SHIVANI

    10 Computer Integrated Manufacturing System(11TH APRIL)

    Types of Manufacturing System ( SMC,

    MC, FMS)

    Components of CIM System

    Machine tools and related Equipment

    MANASVI,

    SUSHANTH, PARTH,

    ADITYA

    11 Material Handling Systems(11TH APRIL)

    Flexible Manufacturing System

    Introduction to FMS

    Components of FMS

    NIKHITHA, VIBHU,

    AYUSH, UPASNA

    12 Flexible Manufacturing System

    (6TH APRIL)NIKUNJ, ARNAV,MITUL, SIDHARTH

  • 7/30/2019 CIM Assignment 2

    3/3

    Types of FMS systems

    Flexibility in FMS

    Building Blocks of FMS

    13 Lean Manufacturing

    Agile Manufacturing(11TH APRIL)

    SRIKAR, ZAMEEL,

    RISHAB, HARPREET

    Each topic group of Presentation shall have minimum of 4 members each as

    specified.

    The presentation shall be of Max 15 minutes with 5 minutes Q & A session.

    All the members in the group should be compulsorily present on the day of

    presentation with a PPT and a printed word document to be submitted.

    Order of Presentation will be decided on spot.

    Group should mail soft copy of presentation & Word document to

    [email protected]