    Kaizen Sheet Company MM/YY S.No

    Productivity Quality Delivery Safety Material Energy Morale TIMKEN NOV 11 T1- 1

    Kaizen Title: To Reduce the setup time for 25mm width part numbers Implemented Area:

    Face Grinder -1Problem/Present Status:a.25mm width part number taking 270min

    setup time ,when compared to all otherpart number it taking 15-20 min.

    Before Improvement:Implemented by:

    Praveen Kumar PathakWasim Akram

    Jagadeeswaran.D

    Result/Benefit:

    (a) Qualitative1. Reduced the fatigue to the

    person

    Real Root Cause Identification:270min setup time for 25mm width part

    number

    Guide plates Qualification required to do

    for 25mm part number which takes 4hrs

    Guide plate adjustment assembly has to be

    shifted from its position to new drilledposition

    Guide plate adjustment stroke is less

    After improvement:(b) Quantitative2 setup per month for 25mm width

    parts

    30sec cycle time for 1 piece

    1080 piece produced with this

    available time

    Standardization:

    1.Setup manual updated2.Machine manual updated

    Root cause Guide plate adjustment stroke is less for 25mmwidth part number

    Guide Plate adjustment stroke length increased to

    avoid the shifting of guide plate assembly

    Lead screw rod increased by 15mm each side

    How many places this Kaizen

    can be deployed horizontally

    Nil

    Idea to eliminate root cause

    Counter-measureConfederation of Indian Industr

    WH

    E

    E

    L

    WH

    E

    E

    L

    1INCH

    PART

    85 mm 85 mm

    GUIDE PLATE

    ADJUSTMENT

    ASSEMBLY

    GUIDE

    ROD

    ASSEMBLY

    GUIDE

    PLATE

    W

    H

    E

    E

    L

    W

    H

    E

    E

    L

    1INCH

    PART

    100 mm 100 mm

    GUIDE ROD

    ASSEMBLY

    GUIDE

    ROD

    ASSEMBLY

    GUIDE

    PLATE

  • 7/30/2019 CII Formet

    2/3

    Kaizen Sheet Company MM/YY S.No

    Productivity Quality Delivery Safety Material Energy Morale TIMKEN JAN2012 T1-2

    Kaizen Title: To decrease the setup time for Diamond Change in Cone Rib Grinders Implemented Area: X3-RIB grinder

    Problem/Present Status:1. 15min. For removing the diamond

    2. 180min. Break down due to wrong

    mounting/Removing of diamond collet nut

    Before Improvement: Implemented by:

    Praveen Kumar Pathak

    Wasim Akram

    Jagadeeswaran.D

    Result/Benefit:

    (a) Qualitative

    1. Easy to remove the diamond

    Real Root Cause Identification:

    To remove the diamond , difficult to hold thestem and remove the nut.

    Space constrains to remove the diamond

    Collet and nut is difficult to handle in this

    machine

    After Improvement:

    (b) Quantitative

    1. Diamond Change/ month = 150

    Time saved/ diamond Change = 12 min.Time Saved/month = 150*12 =1800min

    2.Break down time reduced from 3 hrs

    to Zero Hrs due to improper

    diamond Entry/Removal

    3.Spare parts of nut and collet (a).

    Ordering time (b). Ordering cost

    (c). inventory are eliminated

    Standardization:

    1.Machine manual Updated

    3.Monthly PM check list updated for

    checking the screw thread

    Root cause Collet and nut is difficult to handle in this machine

    Changed the collet stem design to screw locking method

    Stem of diamond turner changed

    How many places this Kaizen can be

    deployed horizontally

    5 RIB Grinder

    Idea to eliminate root cause

    Counter-measure

    Confederation of Indian Industry

  • 7/30/2019 CII Formet

    3/3

    Kaizen Sheet Company MM/YY S.No

    Productivity Quality Delivery Safety Material Energy Morale TIMKEN JAN2012 T1-3

    Kaizen Title: To Reduce the Breakdown time due to improper indexing of the table Implemented Area: JX1-Close In Press

    Problem/Present Status:

    1.Table indexer not working due to shaft getting

    damage frequently

    Before Improvement:Implemented by:

    Praveen Kumar Pathak

    Wasim Akram

    Jagadeeswaran.D

    Result/Benefit:

    (a) Qualitative

    1.Shaft damage avoided

    2.Operator fatigue reduced

    3. Manual Mode of operating the press

    not required

    Real Root Cause Identification:

    Shaft damage

    Shaft key getting misaligned from the slot

    during the rotation

    Slot in the female shaft which allows the key to

    come out from the motor shaft

    After Improvement:

    (b) Quantitative

    1.Machine down time reduced from 2

    hrs to zero

    Standardization:

    Machine manual updated

    Root cause Slot in the female shaft which allows the key to come out fromthe motor shaft

    Spacer filled in the female shaft and grub screw locking

    provided

    Gap filled with grub locking

    How many places this Kaizen can be

    deployed horizontally

    Nil

    Idea to eliminate root cause

    Counter-measure

    Confederation of Indian Industr

    M

    O

    T

    O

    R

    INDEXER TABLE

    Free space

    screw

    INDEXER TABLE

    M

    O

    T

    O

    R