church crypt entrace
TRANSCRIPT
8/8/2019 Church Crypt entrace
http://slidepdf.com/reader/full/church-crypt-entrace 1/8
1567
St Mary Le Bow
Crypt Entrance design proposal
8/8/2019 Church Crypt entrace
http://slidepdf.com/reader/full/church-crypt-entrace 2/8
2 5 5 0
1535 3875
8601915
2 8 1 5
1Donotscaleoffthi sdrawing.
2Anydiscrepenciestobereferedto
theArchitect.
3Thisdrawingisto bereadinconjunctionwithall relevantSpecificationsandotherdrawings
issuedbytheArchitect,StructuralEngineerandotherSpecialists.
4Thisdrawingiscopyrightand isnottobereproduced.
GeneralNotes
rra architects
PackersHouse- 25WestStreet
Hereford - HR4 0BX
t - +44(0)1432 278707 - +44(0)1432 266339
e - [email protected] w- rra-arch.com
Project
Drawing Title
Status
Scale
Date
Dwg_No
DrawnBy
Revision
D at e D et ai ls of re vi si onRevisionSpecificNotesKey Plan Client
StMary LeBow
DwgSize
JobNo
Entranceto Cript -OptionOne
Aug08 JT
1:20 @ A1 1567
Feasibility
01
Plan at A-A Plan at B-B
Elevation 01 Elevation 03 Elevation 02
03
02
B
A
B
A
OPTION ONE
1
2
3
4
5
1- Stone plinth
2- Steel panel with lettering
3- glass panel
4 - door panel
5- stairs to cript
Laser cutting lettering in steel panel
8/8/2019 Church Crypt entrace
http://slidepdf.com/reader/full/church-crypt-entrace 3/8
2 8 9 0
1540
2 5 4 5
3920 825 1830
Plan at A-A Plan at B-B03
02
B
A
B
A
01
1Donotscaleoffthi sdrawing.
2Anydiscrepenciestobereferedto
theArchitect.
3Thisdrawingisto bereadinconjunctionwithall relevantSpecificationsandotherdrawings
issuedbytheArchitect,StructuralEngineerandotherSpecialists.
4Thisdrawingiscopyrightand isnottobereproduced.
GeneralNotes
rra architects
PackersHouse- 25WestStreet
Hereford - HR4 0BX
t - +44(0)1432 278707 - +44(0)1432 266339
e - [email protected] w- rra-arch.com
Project
Drawing Title
Status
Scale
Date
Dwg_No
DrawnBy
Revision
D at e D et ai ls of re vi si onRevisionSpecificNotesKey Plan Client
StMary LeBow
DwgSize
JobNo
Entranceto Cript -OptionTwo
Aug08 JT
1:20 @ A1 1567
Feasibility
OPTION TWO
1
2
3
4
5
1- Stone plinth
2- Steel panel with lettering
3- glass panel
4 - door panel
5- stairs to cript
6- Hand bent steel railing
6
Elevation 01 Elevation 03 Elevation 02
Example of hand bent steel
8/8/2019 Church Crypt entrace
http://slidepdf.com/reader/full/church-crypt-entrace 4/8
2
1
2 5 4 0
1540 3675
1000 1915
2 9 3 5
Facade is a metal structure with long steel separators.
The glass behind facade gives insulation.
The roof is supported by vertical columns onto which
the glass is also supported.
St Mary Le Bow church cut out of metal panel.
The design allows light through to entrance and also a
degree of privacy.
Plan at A-A Plan at B-B03
02
B
A
B
A
01
1Donotscaleoffthi sdrawing.
2Anydiscrepenciestobereferedto
theArchitect.
3Thisdrawingisto bereadinconjunctionwithall relevantSpecificationsandotherdrawings
issuedbytheArchitect,StructuralEngineerandotherSpecialists.
4Thisdrawingiscopyrightand isnottobereproduced.
GeneralNotes
rra architects
PackersHouse- 25WestStreet
Hereford - HR4 0BX
t - +44(0)1432 278707 - +44(0)1432 266339
e - [email protected] w- rra-arch.com
Project
Drawing Title
Status
Scale
Date
Dwg_No
DrawnBy
Revision
D at e D et ai ls of re vi si onRevisionSpecificNotesKey Plan Client
StMary LeBow
DwgSize
JobNo
Entranceto Cript -Option Three
Aug08 JT
1:20 @ A1 1567
Feasibility
OPTION THREE
1
2
3
4
5
1- Stone plinth
2- lettering
3- glass panel
4 - door panel
5- stairs to crypt
6- Steel separators
6
Elevation 01 Elevation 03 Elevation 02
Example of metal separators
8/8/2019 Church Crypt entrace
http://slidepdf.com/reader/full/church-crypt-entrace 5/8
1Donotscaleoffthi sdrawing.
2Anydiscrepenciestobereferedto
theArchitect.
3Thisdrawingisto bereadinconjunctionwithall relevantSpecificationsandotherdrawings
issuedbytheArchitect,StructuralEngineerandotherSpecialists.
4Thisdrawingiscopyrightand isnottobereproduced.
GeneralNotes
rra architects
PackersHouse- 25WestStreet
Hereford - HR4 0BX
t - +44(0)1432 278707 - +44(0)1432 266339
e - [email protected] w- rra-arch.com
Project
Drawing Title
Status
Scale
Date
Dwg_No
DrawnBy
Revision
D at e D et ai ls of re vi si onRevisionSpecificNotesKey Plan Client
StMary LeBow
DwgSize
JobNo
Entranceto Cript - Structure
Aug08 JT
1:10 @ A1 1567
Feasibility
STRUCTURE
a - Planar structural glazing bracket
b- Facade, steel handrails 50x5, 40x5 & 35x5mm, hand bent
c - structure supporting glass
d - bent galvanised sheetings
e - steel panel
f - Main support structure
g - steel door
h - attachment structure
i - transparent toughened 8mm x 8mm glass panel
j - wall bracket
k- lead soaker
j
a
b
d
f
f
h
i
k
8/8/2019 Church Crypt entrace
http://slidepdf.com/reader/full/church-crypt-entrace 6/8
a - Planar structural glazing bracket
b- Facade, steel handrails 50x5, 40x5 & 35x5mm, hand bent
c - structure supporting glassd - bent galvanised sheetings
e - steel panel
f - Main support structure
g - steel door
h - attachment structure
i - transparent toughened 8mm x 8mm glass panel
j - wall bracket
1Donotscaleoffthi sdrawing.
2Anydiscrepenciestobereferedto
theArchitect.
3Thisdrawingisto bereadinconjunctionwithall relevantSpecificationsandotherdrawings
issuedbytheArchitect,StructuralEngineerandotherSpecialists.
4Thisdrawingiscopyrightand isnottobereproduced.
GeneralNotes
rra architects
PackersHouse- 25WestStreet
Hereford - HR4 0BX
t - +44(0)1432 278707 - +44(0)1432 266339
e - [email protected] w- rra-arch.com
Project
Drawing Title
Status
Scale
Date
Dwg_No
DrawnBy
Revision
D at e D et ai ls of re vi si onRevisionSpecificNotesKey Plan Client
StMary LeBow
DwgSize
JobNo
Entranceto Cript -Structure (2)
Aug08 JT
1:20 @ A1 1567
Feasibility
STRUCTURE
2
1
a b
d
g
e
f
h
i
8/8/2019 Church Crypt entrace
http://slidepdf.com/reader/full/church-crypt-entrace 7/8
1Donotscaleoffthi sdrawing.
2Anydiscrepenciestobereferedto
theArchitect.
3Thisdrawingisto bereadinconjunctionwithall relevantSpecificationsandotherdrawings
issuedbytheArchitect,StructuralEngineerandotherSpecialists.
4Thisdrawingiscopyrightand isnottobereproduced.
GeneralNotes
rra architects
PackersHouse- 25WestStreet
Hereford - HR4 0BX
t - +44(0)1432 278707 - +44(0)1432 266339
e - [email protected] w- rra-arch.com
Project
Drawing Title
Status
Scale
Date
Dwg_No
DrawnBy
Revision
D at e D et ai ls of re vi si onRevisionSpecificNotesKey Plan Client
StMary LeBow
DwgSize
JobNo
EntrancetoCript -Views of proposal
Aug08 JT
1:10 @ A1 1567
Feasibility
VIEWS
8/8/2019 Church Crypt entrace
http://slidepdf.com/reader/full/church-crypt-entrace 8/8
3
2
1
1Donotscaleoffthi sdrawing.
2Anydiscrepenciestobereferedto
theArchitect.
3Thisdrawingisto bereadinconjunctionwithall relevantSpecificationsandotherdrawings
issuedbytheArchitect,StructuralEngineerandotherSpecialists.
4Thisdrawingiscopyrightand isnottobereproduced.
GeneralNotes
rra architects
PackersHouse- 25WestStreet
Hereford - HR4 0BX
t - +44(0)1432 278707 - +44(0)1432 266339
e - [email protected] w- rra-arch.com
Project
Drawing Title
Status
Scale
Date
Dwg_No
DrawnBy
Revision
D at e D et ai ls of re vi si onRevisionSpecificNotesKey Plan Client
StMary LeBow
DwgSize
JobNo
Elevationof existingfacade withproposal
Aug08 JT
1567
Feasibility
ELEVATION & PLAN
WEST DOOR
L TOWER
CRYPT ENTRANCE
16.89cl16.7516.81
16.66
16.81
17.52
17.42