VISUALISING THE PERFORMANCE OF CHP & OFF-GRID SOLUTIONS

ENERGY MANAGEMENT DELIVERS10,000,000KWH SAVING TO LONDON BASED

LEGAL SERVICES WITH 800 STAFF

• VISUAL ENERGY DISPLAYS• BEHAVIOUR CHANGE *• LOW ENERGY SERVER ROOMS*• DEMAND BASED VENTILATION• COMPLIANCE – ESOS• BASELOAD ANALYSIS, MANAGING PROJECTS AND MEASURING ROIS*

* WEBINAR AND GUIDE AVAILABLE

DOWNLOADBUILDING SUSTAINABILITY LTD | 1 WEBINARS AND GUIDES

THE ELEPHANT INBUILDING SUSTAINABILITY LTD | 2 THE SERVER ROOM

CHP - BUILDING SUSTAINABILITY LTD | 3 THE UGLY DUCKLING

CHP SYSTEM BASICSCOGENERATION AND TRIGENERATION BUILDING SUSTAINABILITY LTD | 4

CHP SYSTEM BASICSCOGENERATION AND TRIGENERATION BUILDING SUSTAINABILITY LTD | 4

CHP SYSTEM BASICSCOGENERATION AND TRIGENERATION BUILDING SUSTAINABILITY LTD | 4

CHP SYSTEM BASICSCOGENERATION AND TRIGENERATION BUILDING SUSTAINABILITY LTD | 4

DECC 2015

OUR ANALYSIS SUGGESTS THAT GAS CHP WILL BECOME INCREASINGLY

COST-EFFECTIVE UNDER CURRENT POLICIES BETWEEN NOW AND 2020,

DRIVEN LARGELY BY CHANGES IN ENERGY PRICES.

BUILDING SUSTAINABILITY LTD | 5

MARKET SIZEOPPORTUNITY AND FORECAST

2013 REAL GENERATION

27.0TWh/yr

TECHNICAL CHP POTENTIAL

TOTAL POWER CAPACITY CENTRAL GOVT PROJECTION

see RICARDO-AEA Projections of the CHP e capacity and use to 2030 - March 2013https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/191543/Projections_of_CHP_capacity___use_to_2030_2204.pdfsee DECC Updated Energy & Emissions Projections - October 2011 Annex Jhttp://webarchive.nationalarchives.gov.uk/20130106105028/http://www.decc.gov.uk/media/viewfile.ashx?filetype=4&filepath=11/aboutus/economics-social-research/3125-annex-j-total-capacity.xls

2013 2030 2013 2030

BUILDING SUSTAINABILITY LTD | 6

MARKET FORCEGOVERNMENT POLICY

see DECC 2010 to 2015 government policy: energy demand reduction in industry, business and the public sectorhttps://www.gov.uk/government/publications/2010-to-2015-government-policy-energy-demand-reduction-in-industry-business-and-the-public-sector/2010-to-2015-government-policy-energy-demand-reduction-in-industry-business-and-the-public-sector

ENERGY DEMAND

REDUCTIONGOV POLICY

ECAs ENHANCED CAPITAL ALLOWANCES ECAs let businesses that invest in certain energy-saving equipment write off the total cost of the equipment against their taxable profit as a 100% first-year capital allowance

CCL CLIMATE CHANGE LEVY EXEMPTIONCHP schemes that certified as ‘Good Quality CHP’ under the CHPQA programme and have obtained a Secretary of State (CHP) Exemption Certificate are exempt from the main rates of CCL onthe fuel they utilise and the direct and self-supplies of the power output generated

RHI RENEWABLE HEAT INCENTIVE Provides incentives for consumers to install

renewable heating in place of fossil fuels

RO RENEWABLES OBLIGATIONProvides incentives for large-scale

renewable electricity generation by making UK suppliers source a proportion of their

electricity from eligible renewable sources

BUSINESS RATES EXEMPTIONApplies to specified plant contained within CHP Schemes that are certified as ‘Good Quality CHP’ under the CHPQA programme and have obtained a Secretary of State (CHP) Exemption Certificate

FUEL FIRED CHP PLANT RENEWABLE CHP TECHNOLOGIES

BUILDING SUSTAINABILITY LTD | 7

NON FINANCIAL BARRIERSDECC RESEARCH (OUT FOR CONSULTATION)

see DECC Call for Evidence: Tackling Non- Financial Barriers to Gas CHP - February 2015https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/401962/Gas_CHP_Call_for_Evidence_-_Tackling_Non-Financial_Barriers_v6.pdf

BUILDING SUSTAINABILITY LTD | 8

QUALITATIVE INTERVIEWS WERE CONDUCTED WITH 49 ORGANISATIONS

● FINANCIAL PERFORMANCE IS KEY FOR A DECISION

● CHP NEEDS A SENIOR CHAMPION

● CHP DECISIONS ARE LINKED TO HEATING SYSTEM UPGRADES/ADDITIONS

● SMALLER ORGANISATIONS LACK CHP TECHNICAL RESOURCE AND EXPERTISE

● ENERGY EXPORTING IS TOO COMPLEX FOR MOST ORGANISATION OTHER THAN ENERGY SERVICES

COMPANIES

● LACK OF UNDERSTANDING OF CHP AND THE AVAILABLE BENEFITS - SEEN AS BIG BARRIER FOR SME

● PUBLIC SECTOR ARE LOOKING TO GOVERNMENT FOR HELP IN BRIDGING LACK OF KNOWLEDGE

BUILDING SUSTAINABILITY LTD | 9 FLYING BLIND

CREATING A CULTURE FORBUILDING SUSTAINABILITY LTD | 10 CARING ABOUT CHP

BUILDING SUSTAINABILITY LTD | 11VISUALISATIONIS THE KEY

RESEARCH PHASE

RESEARCH PHASEAVAILABLE TODAYQ4 2015

•LOAD 3 – YEAR HISTORICAL UTILITY DATA (HALF HOURLY)

•WEATHER NORMALISE HEATING/COOLING LOAD

•SIZE CHP•PREPARE BUSINESS CASE•PREPARE REQUIREMENT SPECIFICATION•MEASUREMENT & VERIFICATION SUPPORT

FOR ESCO FINANCING BASED ON IPMVP

PLAN CHP PROJECT

•COLLECT HALF HOURLY CHP DATA•COLLECT UTILITY HALF HOURLY DATA•VISUALISE CHP •PROVIDE MONTHLY AUTOMATED REPORTING•PROVIDE COMPLIANCE REPORTS•SUPPORT FOR SOS CHPQA

MANAGE AND TRACK RETURN ON INVESTMENT •COMPARE PERFORMANCE TO ORIGINAL

SPECIFICATION•COMPARE TO OTHER SIMILAR SITES•COMPARE TO REFERENCE MODEL

COMPARE AND OPTIMISE

•PUBLISH LIVE CASE STUDIES•CREATE A COMMUNITY

PROMOTE CHP

BUILDING SUSTAINABILITY LTD | 12VISION FOR THECHP BUREAU

AVAILABLE TODAYQ4 2015

•LOAD 3 – YEAR HISTORICAL UTILITY DATA (HALF HOURLY)

•WEATHER NORMALISE HEATING/COOLING LOAD

•SIZE CHP•PREPARE BUSINESS CASE•PREPARE REQUIREMENT SPECIFICATION•MEASUREMENT & VERIFICATION SUPPORT

FOR ESCO FINANCING BASED ON IPMVP

PLAN CHP PROJECT

RESEARCH PHASE

RESEARCH PHASE

•COLLECT HALF HOURLY CHP DATA•COLLECT UTILITY HALF HOURLY DATA•VISUALISE CHP •PROVIDE MONTHLY AUTOMATED REPORTING•PROVIDE COMPLIANCE REPORTS•SUPPORT FOR SOS CHPQA

MANAGE AND TRACK RETURN ON INVESTMENT •COMPARE PERFORMANCE TO ORIGINAL

SPECIFICATION•COMPARE TO OTHER SIMILAR SITES•COMPARE TO REFERENCE MODEL

COMPARE AND OPTIMISE

•PUBLISH LIVE CASE STUDIES•CREATE A COMMUNITY

PROMOTE CHP

BUILDING SUSTAINABILITY LTD | 13 VISION FOR THECHP BUREAU

RESEARCH PHASE

RESEARCH PHASEAVAILABLE TODAYQ4 2015

•LOAD 3 – YEAR HISTORICAL UTILITY DATA (HALF HOURLY)

•WEATHER NORMALISE HEATING/COOLING LOAD

•SIZE CHP•PREPARE BUSINESS CASE•PREPARE REQUIREMENT SPECIFICATION•MEASUREMENT & VERIFICATION SUPPORT

FOR ESCO FINANCING BASED ON IPMVP

PLAN CHP PROJECT

•COLLECT HALF HOURLY CHP DATA•COLLECT UTILITY HALF HOURLY DATA•VISUALISE CHP •PROVIDE MONTHLY AUTOMATED REPORTING•PROVIDE COMPLIANCE REPORTS•SUPPORT FOR SOS CHPQA

MANAGE AND TRACK RETURN ON INVESTMENT •COMPARE PERFORMANCE TO ORIGINAL

SPECIFICATION•COMPARE TO OTHER SIMILAR SITES•COMPARE TO REFERENCE MODEL

COMPARE AND OPTIMISE

•PUBLISH LIVE CASE STUDIES•CREATE A COMMUNITY

PROMOTE CHP

BUILDING SUSTAINABILITY LTD | 14 VISION FOR THECHP BUREAU

RESEARCH PHASE

•COMPARE PERFORMANCE TO ORIGINAL SPECIFICATION

•COMPARE TO OTHER SIMILAR SITES•COMPARE TO REFERENCE MODEL

COMPARE AND OPTIMISE

RESEARCH PHASE

Q4 2015

•LOAD 3 – YEAR HISTORICAL UTILITY DATA (HALF HOURLY)

•WEATHER NORMALISE HEATING/COOLING LOAD

•SIZE CHP•PREPARE BUSINESS CASE•PREPARE REQUIREMENT SPECIFICATION•MEASUREMENT & VERIFICATION SUPPORT

FOR ESCO FINANCING BASED ON IPMVP

PLAN CHP PROJECT

•PUBLISH LIVE CASE STUDIES•CREATE A COMMUNITY

PROMOTE CHP

AVAILABLE TODAY

•COLLECT HALF HOURLY CHP DATA•COLLECT UTILITY HALF HOURLY DATA•VISUALISE CHP •PROVIDE MONTHLY AUTOMATED REPORTING•PROVIDE COMPLIANCE REPORTS•SUPPORT FOR SOS CHPQA

MANAGE AND TRACK RETURN ON INVESTMENT

BUILDING SUSTAINABILITY LTD | 15 VISION FOR THECHP BUREAU

RESEARCH PHASE

•PUBLISH LIVE CASE STUDIES•CREATE A COMMUNITY

PROMOTE CHP

AVAILABLE TODAY RESEARCH PHASE

•COLLECT HALF HOURLY CHP DATA•COLLECT UTILITY HALF HOURLY DATA•VISUALISE CHP •PROVIDE MONTHLY AUTOMATED REPORTING•PROVIDE COMPLIANCE REPORTS•SUPPORT FOR SOS CHPQA

MANAGE AND TRACK RETURN ON INVESTMENT •COMPARE PERFORMANCE TO ORIGINAL

SPECIFICATION•COMPARE TO OTHER SIMILAR SITES•COMPARE TO REFERENCE MODEL

COMPARE AND OPTIMISE

Q4 2015

•LOAD 3 – YEAR HISTORICAL UTILITY DATA (HALF HOURLY)

•WEATHER NORMALISE HEATING/COOLING LOAD

•SIZE CHP•PREPARE BUSINESS CASE•PREPARE REQUIREMENT SPECIFICATION•MEASUREMENT & VERIFICATION SUPPORT

FOR ESCO FINANCING BASED ON IPMVP

PLAN CHP PROJECT

BUILDING SUSTAINABILITY LTD | 16 VISION FOR THECHP BUREAU

HOW ABOUTTODAY?

BUILDING SUSTAINABILITY LTD | 17

ECOMESHNETDATA COLLECTION

VISUAL ENERGY DISPLAYENERGY WEB VISUALS

ASSET REGISTERPROJECT MANAGEMENT AND ROI

AUTOMATED REPORTING

BUILDING SUSTAINABILITY LTD | 18 WORKPLACE FOOTPRINTTRACKER

UTILITY METER CHP PLANTMETERS /

SENSORS

FOOTPRINT TRACKER

PUBLIC DISPLAY / ENERGY DASHBOARD

DATA

AGGREGATED INFORMATION &

REPORTS

ECOMESHNETDATA COLLECTION

VISUAL ENERGY DISPLAYENERGY WEB VISUALS

ASSET REGISTERPROJECT MANAGEMENT AND ROI

AUTOMATED REPORTING

BUILDING SUSTAINABILITY LTD | 19 WORKPLACE FOOTPRINTTRACKER

ECOMESHNETDATA COLLECTION

VISUAL ENERGY DISPLAYENERGY WEB VISUALS

ASSET REGISTERPROJECT MANAGEMENT AND ROI

AUTOMATED REPORTING

BUILDING SUSTAINABILITY LTD | 20 WORKPLACE FOOTPRINTTRACKER

ECOMESHNETDATA COLLECTION

VISUAL ENERGY DISPLAYENERGY WEB VISUALS

ASSET REGISTERPROJECT MANAGEMENT AND ROI

AUTOMATED REPORTING

BUILDING SUSTAINABILITY LTD | 21 WORKPLACE FOOTPRINTTRACKER

CHPBUREAU

BUILDING SUSTAINABILITY LTD | 22

WHAT NEXT?

BUILDING SUSTAINABILITY LTD | 23

Any questions?You can find us at:

www.buildingsustainability.net

@BSL_EnergyTeam

[email protected]

[email protected]