    CONSTRUCTION

    AND WORKING OF

    COAL HANDLING PLANT

    GUIDED BY

    MR. RATAN ROY.

    12/7/2013

    1

  • 8/13/2019 CHP in India

    2/30

    PRESENTED BY

    GROUP NO.4

    12/7/2013

    2

  • 8/13/2019 CHP in India

    3/30

    INDEX

    Introduction.

    Availability of Coal in India.

    Transportation of Coal.

    Analysis of Coal.

    General Layout of CHP. CHP Auxiliary And Equipments

    12/7/2013

    3

  • 8/13/2019 CHP in India

    4/30

    INTRODUCTION

    What is CHP?

    CHP (C- Coal, H- Handling, P- Plant)

    Which properly handles the coal from its

    receipt to transferring it to bunkers.

    Objective of CHP :-

    To supply the quanta of processed coal tobunkers of Coal mills for Boiler operation.

    To Stack the coal to coal yard.

    1

    2/7/2013

    4

  • 8/13/2019 CHP in India

    5/30

    AVAILABILITYOFCOALININDIA.

    Mostly E and F grade coal used in India.

    Blending Is Done To get Average D Grade.1

    2/7/2013

    5

    Grade C.V.

    ( K Cal / Kg. )

    % Ash + Moisture

    A > 6200 19.57

    B 5601-6200 19.57 - 23.97

    C 4941-5600 23.92 - 28.69

    D 4201-5940 28.69 - 34.05

    E 3361-4200 34.06 - 40.14

    F 2401-3360 40.14 - 47.10

  • 8/13/2019 CHP in India

    6/30

    TRANSPORTATIONOFCOAL

    5 ways of Transportation.

    1. Railways.

    2. Ropeways.

    3. Roadways.

    4. waterways.

    5. Airway.

    1

    2/7/2013

    6

    Available only for TPS

    nearer to coal mines

    Have to build Runway near

    TPS which is very costly.

    waterway may not be possible

    till TPS and Problem of

    recalling arises if coal dip inwater

    Best and Cheap

    facility at Doorstep

    Fear of thief

  • 8/13/2019 CHP in India

    7/30

    BYRAILWAY

    80-90% of the requirement is fulfilled by this way.

    Demurrage calculations on coal Rakes:-

    We receive the coal wagons in the form of rakes

    (55-60 wagons in each rake).

    Free time normally 7 hrs. from Receipt of coal.

    Free time is calculated from the receipt of written intimationof coal rakes from MAHAGENCO to the railway.

    Rate of demurrage is Rs.100 / wagon / hr.

    1

    2/7/2013

    7

  • 8/13/2019 CHP in India

    8/30

    ANALYSISOFCOAL

    Chemical Analysis of Coal:-

    Sample of coal is randomly collected from each

    rake and detailed chemical analysis, calculation of

    calorific value is carried out and is confirmed

    whether it is as per agreement with the coal mines

    or not.

    1

    2/7/2013

    8

  • 8/13/2019 CHP in India

    9/30

    GENERALLAYOUTOFCHP

    1

    2/7/2013

    9

    Wagon Tippler Crusher House

    Bunkers

    Tripper Trolley

    Conv. Belts VibratingScreens

    Crushers

    Feeder SurgeHopper

    Hopper

  • 8/13/2019 CHP in India

    10/30

    CHP Auxiliaries

    1

    2/7/2013

    10

  • 8/13/2019 CHP in India

    11/30

    OPERATIONALCYCLE

    Bunkering Cycle

    Stacking Cycle

    Reclaiming Cycle

    1

    2/7/2013

    11

  • 8/13/2019 CHP in India

    12/30

    BUNKERINGCYCLE

    1

    2/7/2013

    12

    Bunkers

    From W/T

    BunkeringBelts

    Surge Hopper

    Vibrating Feeder

    Crusher House

    Crusher

  • 8/13/2019 CHP in India

    13/30

    STACKINGCYCLE

    1

    2/7/2013

    13Bunkers

    Stacking Belts

    Crushed

    Yard

    From W/TCrusher House

    BunkeringBelts

    By-Passed Coal

    Coal Is not required if

    bunker is full or Due any

    maintenance

  • 8/13/2019 CHP in India

    14/30

    RECLAIMINGCYCLE

    1

    2/7/2013

    14Bunkers

    Reclaiming Belts

    Crushed

    Yard

    Non-

    Crushed

    Yard

    From W/TCrusher House

    BunkeringBelts

    If Outer Supply of coal

    Is Not Present

    Stacked Coal

  • 8/13/2019 CHP in India

    15/30

    WAGONTIPPLER

    These are used to unload the coal wagons into coalhoppers in very less time (e.g. 20 wagons/hr. or more).

    Weighing of coal is carried out at wagon tippler.

    Normally 55-60 metric ton of coal come in each wagon.

    1

    2/7/2013

    15

    Wt of the coal =Wt. of loaded wagon Wt. of empty wagon

  • 8/13/2019 CHP in India

    16/30

    WAGONTIPPLERDRIVESYSTEM

    1

    2/7/2013

    16

    Motor

    Pinion

    Spur Gear

    Thruster Brake

    G / B

  • 8/13/2019 CHP in India

    17/30

    Wagon tippler

    Mesh of 250 mm * 250 mmHopper

    Vibrating Feeder

    Conveyor Belt

    To crusher House

    GENERALLAYOUTOFW/T

    1

    2/7/2013

    17

  • 8/13/2019 CHP in India

    18/30

    EQUIPMENTUSEDINW/T

    Water Sprinkler System.

    Dust Extraction System.

    1

    2/7/2013

    18

  • 8/13/2019 CHP in India

    19/30

    CONVEYORBELTSYSTEM

    Construction of Conveyor Belt

    Conveyor Belt Drive System

    Counter Weight

    Idlers Protection System

    Interlocking

    Magnetic Separator

    1

    2/7/2013

    19

  • 8/13/2019 CHP in India

    20/30

    CONSTRUCTIONOFCONVEYORBELT

    Synthetic rubber.

    4 ply means 4 nylon net in between 2 mm thick rubbercoating is used.

    At KTPS belt of 1000 mm width is used.

    Width varies from 500 mm -1400 mm.

    1

    2/7/2013

    20

    Net

    Strength = 600 N

    1000 mm

  • 8/13/2019 CHP in India

    21/30

    CONVEYORBELTDRIVESYSTEM

    1

    2/7/2013

    21

    Motor G / B

    Fluid Coupling

    Filled with 3/4th oil

    Fusible plug Head End Pulley

    Tail End Pulley

    oSpeed before crusher 2.4 m/sec

    oSpeed After Crusher 2.7 m/sec

    Belt Speed

  • 8/13/2019 CHP in India

    22/30

    COUNTERWEIGHT

    1

    2/7/2013

    22

    Return Idlers

    Idlers

    Counter Weight

    Head End Pulley

    Tail End Pulley

    Conveyor Belt

    Railing

    Take-up Pulley

    I

  • 8/13/2019 CHP in India

    23/30

    IDLERS

    1

    2/7/2013

    23

    Carry Side Return Side

    Self Alignment Impact Return Roller Return Adjustment Roller

    ( Installed after

    every 25m )

    Below Discharge

    chute

    ( rubber coating )

    35

  • 8/13/2019 CHP in India

    24/30

    ANGLEOFIDLERS

    1

    2/7/2013

    24

    Angle Merits Demerits

    20 No middle idler is

    overloaded

    More Coal

    Derailed

    35 Coal not Derail. Middle idler is

    overloaded

  • 8/13/2019 CHP in India

    25/30

    PROTECTIONSYSTEM

    Interlockingis used for safety purpose.

    If any belt fails all other belts stop working which

    are interconnected.

    Magnetic Separatoris used to remove metal

    particle from coal conveyed through conveyor belt

    for improving boiler efficiency.

    1

    2/7/2013

    25

  • 8/13/2019 CHP in India

    26/30

    CRUSHINGMECHANISMINCHP

    Three Stage Crushing System is used in Plant.

    1.Double Roll Crusher

    2.Rotary Breaker Crusher

    3.Impact Crusher

    1

    2/7/2013

    26

    W / T No.4

    DRCR RBCR Impact

    250 mm 80 mm

    600 mm

    20-25 mmStage 1 Stage 2

    Stage 3

  • 8/13/2019 CHP in India

    27/30

    DOUBLEROLLCRUSHER( DRCR )

    1

    2/7/2013

    27

    Teeth

    Roller

    300 mm

  • 8/13/2019 CHP in India

    28/30

    ROTARYBREAKERCRUSHER( RBCR )

    1

    2/7/2013

    28

    Striking Plate

    Hole of diameter 100 mm

    250 mm

    80 mm

    Stone

    shell

  • 8/13/2019 CHP in India

    29/30

    IMPACTCRUSHER

    1

    2/7/2013

    29

    Hammer

    30 mm Rotor

    Coal

  • 8/13/2019 CHP in India

    30/30

    1

    2/7/2013

    30