chp in india
TRANSCRIPT
-
8/13/2019 CHP in India
1/30
CONSTRUCTION
AND WORKING OF
COAL HANDLING PLANT
GUIDED BY
MR. RATAN ROY.
12/7/2013
1
-
8/13/2019 CHP in India
2/30
PRESENTED BY
GROUP NO.4
12/7/2013
2
-
8/13/2019 CHP in India
3/30
INDEX
Introduction.
Availability of Coal in India.
Transportation of Coal.
Analysis of Coal.
General Layout of CHP. CHP Auxiliary And Equipments
12/7/2013
3
-
8/13/2019 CHP in India
4/30
INTRODUCTION
What is CHP?
CHP (C- Coal, H- Handling, P- Plant)
Which properly handles the coal from its
receipt to transferring it to bunkers.
Objective of CHP :-
To supply the quanta of processed coal tobunkers of Coal mills for Boiler operation.
To Stack the coal to coal yard.
1
2/7/2013
4
-
8/13/2019 CHP in India
5/30
AVAILABILITYOFCOALININDIA.
Mostly E and F grade coal used in India.
Blending Is Done To get Average D Grade.1
2/7/2013
5
Grade C.V.
( K Cal / Kg. )
% Ash + Moisture
A > 6200 19.57
B 5601-6200 19.57 - 23.97
C 4941-5600 23.92 - 28.69
D 4201-5940 28.69 - 34.05
E 3361-4200 34.06 - 40.14
F 2401-3360 40.14 - 47.10
-
8/13/2019 CHP in India
6/30
TRANSPORTATIONOFCOAL
5 ways of Transportation.
1. Railways.
2. Ropeways.
3. Roadways.
4. waterways.
5. Airway.
1
2/7/2013
6
Available only for TPS
nearer to coal mines
Have to build Runway near
TPS which is very costly.
waterway may not be possible
till TPS and Problem of
recalling arises if coal dip inwater
Best and Cheap
facility at Doorstep
Fear of thief
-
8/13/2019 CHP in India
7/30
BYRAILWAY
80-90% of the requirement is fulfilled by this way.
Demurrage calculations on coal Rakes:-
We receive the coal wagons in the form of rakes
(55-60 wagons in each rake).
Free time normally 7 hrs. from Receipt of coal.
Free time is calculated from the receipt of written intimationof coal rakes from MAHAGENCO to the railway.
Rate of demurrage is Rs.100 / wagon / hr.
1
2/7/2013
7
-
8/13/2019 CHP in India
8/30
ANALYSISOFCOAL
Chemical Analysis of Coal:-
Sample of coal is randomly collected from each
rake and detailed chemical analysis, calculation of
calorific value is carried out and is confirmed
whether it is as per agreement with the coal mines
or not.
1
2/7/2013
8
-
8/13/2019 CHP in India
9/30
GENERALLAYOUTOFCHP
1
2/7/2013
9
Wagon Tippler Crusher House
Bunkers
Tripper Trolley
Conv. Belts VibratingScreens
Crushers
Feeder SurgeHopper
Hopper
-
8/13/2019 CHP in India
10/30
CHP Auxiliaries
1
2/7/2013
10
-
8/13/2019 CHP in India
11/30
OPERATIONALCYCLE
Bunkering Cycle
Stacking Cycle
Reclaiming Cycle
1
2/7/2013
11
-
8/13/2019 CHP in India
12/30
BUNKERINGCYCLE
1
2/7/2013
12
Bunkers
From W/T
BunkeringBelts
Surge Hopper
Vibrating Feeder
Crusher House
Crusher
-
8/13/2019 CHP in India
13/30
STACKINGCYCLE
1
2/7/2013
13Bunkers
Stacking Belts
Crushed
Yard
From W/TCrusher House
BunkeringBelts
By-Passed Coal
Coal Is not required if
bunker is full or Due any
maintenance
-
8/13/2019 CHP in India
14/30
RECLAIMINGCYCLE
1
2/7/2013
14Bunkers
Reclaiming Belts
Crushed
Yard
Non-
Crushed
Yard
From W/TCrusher House
BunkeringBelts
If Outer Supply of coal
Is Not Present
Stacked Coal
-
8/13/2019 CHP in India
15/30
WAGONTIPPLER
These are used to unload the coal wagons into coalhoppers in very less time (e.g. 20 wagons/hr. or more).
Weighing of coal is carried out at wagon tippler.
Normally 55-60 metric ton of coal come in each wagon.
1
2/7/2013
15
Wt of the coal =Wt. of loaded wagon Wt. of empty wagon
-
8/13/2019 CHP in India
16/30
WAGONTIPPLERDRIVESYSTEM
1
2/7/2013
16
Motor
Pinion
Spur Gear
Thruster Brake
G / B
-
8/13/2019 CHP in India
17/30
Wagon tippler
Mesh of 250 mm * 250 mmHopper
Vibrating Feeder
Conveyor Belt
To crusher House
GENERALLAYOUTOFW/T
1
2/7/2013
17
-
8/13/2019 CHP in India
18/30
EQUIPMENTUSEDINW/T
Water Sprinkler System.
Dust Extraction System.
1
2/7/2013
18
-
8/13/2019 CHP in India
19/30
CONVEYORBELTSYSTEM
Construction of Conveyor Belt
Conveyor Belt Drive System
Counter Weight
Idlers Protection System
Interlocking
Magnetic Separator
1
2/7/2013
19
-
8/13/2019 CHP in India
20/30
CONSTRUCTIONOFCONVEYORBELT
Synthetic rubber.
4 ply means 4 nylon net in between 2 mm thick rubbercoating is used.
At KTPS belt of 1000 mm width is used.
Width varies from 500 mm -1400 mm.
1
2/7/2013
20
Net
Strength = 600 N
1000 mm
-
8/13/2019 CHP in India
21/30
CONVEYORBELTDRIVESYSTEM
1
2/7/2013
21
Motor G / B
Fluid Coupling
Filled with 3/4th oil
Fusible plug Head End Pulley
Tail End Pulley
oSpeed before crusher 2.4 m/sec
oSpeed After Crusher 2.7 m/sec
Belt Speed
-
8/13/2019 CHP in India
22/30
COUNTERWEIGHT
1
2/7/2013
22
Return Idlers
Idlers
Counter Weight
Head End Pulley
Tail End Pulley
Conveyor Belt
Railing
Take-up Pulley
I
-
8/13/2019 CHP in India
23/30
IDLERS
1
2/7/2013
23
Carry Side Return Side
Self Alignment Impact Return Roller Return Adjustment Roller
( Installed after
every 25m )
Below Discharge
chute
( rubber coating )
35
-
8/13/2019 CHP in India
24/30
ANGLEOFIDLERS
1
2/7/2013
24
Angle Merits Demerits
20 No middle idler is
overloaded
More Coal
Derailed
35 Coal not Derail. Middle idler is
overloaded
-
8/13/2019 CHP in India
25/30
PROTECTIONSYSTEM
Interlockingis used for safety purpose.
If any belt fails all other belts stop working which
are interconnected.
Magnetic Separatoris used to remove metal
particle from coal conveyed through conveyor belt
for improving boiler efficiency.
1
2/7/2013
25
-
8/13/2019 CHP in India
26/30
CRUSHINGMECHANISMINCHP
Three Stage Crushing System is used in Plant.
1.Double Roll Crusher
2.Rotary Breaker Crusher
3.Impact Crusher
1
2/7/2013
26
W / T No.4
DRCR RBCR Impact
250 mm 80 mm
600 mm
20-25 mmStage 1 Stage 2
Stage 3
-
8/13/2019 CHP in India
27/30
DOUBLEROLLCRUSHER( DRCR )
1
2/7/2013
27
Teeth
Roller
300 mm
-
8/13/2019 CHP in India
28/30
ROTARYBREAKERCRUSHER( RBCR )
1
2/7/2013
28
Striking Plate
Hole of diameter 100 mm
250 mm
80 mm
Stone
shell
-
8/13/2019 CHP in India
29/30
IMPACTCRUSHER
1
2/7/2013
29
Hammer
30 mm Rotor
Coal
-
8/13/2019 CHP in India
30/30
1
2/7/2013
30