CHINA "PRE-FAB" INSTANT HOME PROGRAMME (FOR FLOOD VICTIMS) R.C. Foundation Floor Slabs (for kampong-style "stilt houses" ) As of . . . {about 7.65m x 9.15m = 70 sq m. } April~05~2015 ### By "Simple Rule-of-Thumb" as is Oral discussions . . . ### Proposed R.C. 'ship-based' foundation slab with 4-feet column stump Malaysian Abbr'v := { R.C. = Reinforced Concrete } Ringgit (RM) 1. allow back-hoe machine for platform levelling, foundation slab exvation and backfilling, + boundaryL/Sum per hse 300.00 2. R.C. strip tie beam (say 12" x 6" thk) al 1.5075 m3 240.00 361.80 (add 2 x 12mm dia m.s. bars x 110' L) 59.561 kg 2.80 166.77 6" timber planks form-work 68 mr 3.00 204.00 ## 3. 6" thick ship-based foundation slab concr 10.5 m3 240.00 2,520.00 ## add m'chnery =$650/day . . . ~allow 2 layers wire-mesh brc reinforceme 140 m2 2.50 350.00 :: workmen + hoist + profile rack >>> allow 580.00 4. 6 nos. "leg-stands" (r.c col. Stumps with 6 nos 100.00 600.00 ~ 4 nos. 12mm diam. ms bars, 1 bolt-&-nut ### 4a. Allow for "C-channel" beam support house structu L/Sum per hse 1,500.00 5. Must allow for underground discharge pipes L/Sum per hse 200.00 ( discharge to septic tank or STP or main drains ). 6a. 6" p.c. small drains to Perimeter of eac 110 feet 2.50 275.00 { if rain-water can free-fall, then can take out . . . .} 6b. 2-feet conc. Aprons surrounding house 110 feet 2.00 220.00 To complete the foundation concrete slabs with stands RM 7,277.57 Roof // Ceiling : 7. Allow simple asbestos roof cover & timber 1088 sq ft 5.50 5,984.00 ?? ## check if supplier include Roof-cover # approx. 1088 sq ft 2.80 3,046.40 {if 25ft x 30ft, then = 750 sq ft.} ==>> can adjust size of house . . . . . 8. Ceiling sheets,approx 2 x 34 x 16

Upload: bro-cheah

Post on 30-Sep-2015

217 views

Category:

Documents


0 download

DESCRIPTION

Worksheet for Elementary quick estimates of Pre-Fab China instant homes. Rule-of-thumb costing for erection of platforms of prefab houses.

TRANSCRIPT

EstimatesCHINA "PRE-FAB" INSTANT HOME PROGRAMME (FOR FLOOD VICTIMS){if 25ft x 30ft, then = 750 sq ft.} ==>> can adjust size of house . . . . .R.C. Foundation Floor Slabs (for kampong-style "stilt houses" )As of . . .{about 7.65m x 9.15m = 70 sq m. }April~05~2015### By "Simple Rule-of-Thumb" as is Oral discussions . . . ###Proposed R.C. 'ship-based' foundation slab with 4-feet column stumpsMalaysianAbbr'v := { R.C. = Reinforced Concrete }Ringgit (RM)1. allow back-hoe machine for platform levelling, foundationslab exvation and backfilling, + boundary set-upL/Sumper hse300.002. R.C. strip tie beam (say 12" x 6" thk) all-round1.5075m3240.00361.80(add 2 x 12mm dia m.s. bars x 110' L)59.5609756098kg2.80166.776" timber planks form-work68mr3.00204.00##3. 6" thick ship-based foundation slab concrete10.5m3240.002,520.00## add m'chnery =$650/day . . .~allow 2 layers wire-mesh brc reinforcement140m22.50350.00:: workmen + hoist + profile rack >>>allow580.004. 6 nos. "leg-stands" (r.c col. Stumps with ms bars).6nos100.00600.00~ 4 nos. 12mm diam. ms bars, 1 bolt-&-nut4,050.004a. Allow for "C-channel" beam support house structureL/Sumper hse1,500.005. Must allow for underground discharge pipesL/Sumper hse200.00( discharge to septic tank or STP or main drains ).6a. 6" p.c. small drains to Perimeter of each house110feet2.50275.00{ if rain-water can free-fall, then can take out . . . .}6b. 2-feet conc. Aprons surrounding house110feet2.00220.00To complete the foundation concrete slabs with stands :RM7,277.57Roof // Ceiling :7. Allow simple asbestos roof cover & timber rafters1088sq ft5.505,984.00??## check if supplier include Roof-cover ##approx.8. Ceiling sheets,approx 2 x 34 x 161088sq ft2.803,046.40##9. Workmanship to erect one pre-fab house (2 days)L/Sum1,000.00??To add in roof and ceiling . . . . .RM17,307.97IMPORTANT :1. Allow PAINTing to each hse : normal emulsion paint . . .L/Sumper hse1,800.002. Locksets for each door (frt/bck; 2 tlts; 3 rms=7nos)7nos25.00175.003. All 4 sides, 4ft x 4ft lourves windows & glass panes7sets80.00560.00( wdw frame alrdy in-built . . . )4. '5~6 steps' to enter house (cement-sand bricks stairs)1sets200.00200.00## Any rain-water down-pipes to divert rainwater from roof??Internal Sanitary-wares fittings only . . .1. 1 set sitting W.C. with flush cistern, local supply1set160.00160.002. 1 set wah-basin c/w std local tap1set150.00150.003. 1 set kitchen alum sink c/w local tap1set120.00120.004. 1 set shower c/w tap1set80.0080.005. Workmanship for plumber ( housing project basis )L/Sum300.00Internal house Sanitary-wares Fittings per hse:RM810.00STP (Sewerage Treatment plant, for big shceme only)Now, using Septic-tanks for individual house . . .1. Supply, excavation, install Septic-tank 5PE sizeL/Sum1,300.002. Allow to lay 6" sewer pipes discharge from houseto the septic tanks (say 6 to 8 feet)per hse150.00For Septic Tank supply install each house:RM1,450.00Electrical~ Light Fittings to each house:1. Allow 4ft long flourescent light fittings8sets80.00640.00(( guest dining=1; kitchen=1; toilet=1; bath=1; front=1 ))(( 3 bedrooms=1 each ))2. Allow 13 Amp power sockets5pts80.00400.00(( kitchen=2; guest=2; bedrm=1 each; ))3. Main switch and fuse box1set200.00200.00Electrical~ Light Fittings to each house:1,240.00EXTERNAL Works (outside house ):## WARNING : : : ##1. Whole project site already clear of trees/bushesAll figures are only for2. Access road to the project site already existingun-official discussions.3. Sub-station & electric supply to site provided byEvery item subjected tothe authorites/ local government.change to suit supplier's design.Site conditions may vary . .4. application for electricity (TNB) and water (JBA)( on site variations not allowed . . .)and install respective billing meters by others.5. The internal roads and main drains servicing the site.6. The street lightings, any small bridges or concreteslabs over main drains and conc culverts road crossingsshall be by others.7. As-built project layout plans & submissions by others.8. The applying for C.F. inspection are by others.