chevron jod scope
TRANSCRIPT
-
7/27/2019 Chevron Jod Scope
1/35
Project RayMoc 162/2013
Unit 20 Vessel 2572 and T3 Pump 2591ACompleted.
Moc 385/2010
Provide Pressure Gauga upsteam of outlet check valve at U-9004 A/B and C
U-9004 C- Completed on 22/5/2014
Moc 266/2013 completed
T-8111 and T-8112 Replace the C/Steel 3'' OG line to S/steel 4'' OG line
M2014 / 1147 completed
Replace the 20'' OG line at V-8111 to 6'' PTFE lined piping from V-8122
Moc 2014/1210 Completed
Pamp 7001 discharge Line connet the hole to filter
Start on 8/5/2014 completed on 15/5/2014
M20141170-001
Remove piping deadleg at Pump 2050 discharge
M20141098 Tender close on 29/7/2014 Tuesday SCK
PROVIDE pcv FOR NITROGEN Purging in unit 20 AlkylPhenol PHA ( Unit area 20 )
M20141359 Tender close on 27/7/2014 Tuesday Yeo Hong
Temporary use of T-5645 to store C-5730 bottom stream ( Unit area 56 )
-
7/27/2019 Chevron Jod Scope
2/35
-
7/27/2019 Chevron Jod Scope
3/35
Project Tan B.CMoc 295/2014 Closing on 15/8/2014 Friday
( Tender ) Unit area : P-2054 , BF-2054 , V-2054 , VP-2051 , VP-2051-V1 Alkyphenol ( unit 20 )
Moc 118/2013
Gasket upgrading for Process Vapour Lines
Unit Area : 30/31/35/36/25/26&55
-
7/27/2019 Chevron Jod Scope
4/35
-
7/27/2019 Chevron Jod Scope
5/35
Project Ng and HoiMoc 77 / 2013
SF-3050 / SF - 3150 and SF - 4050 ompleted.
Moc 264-2013 Completed on 18/6/2014
Vessel 3520and Vessel 3620 install the 4'' Gate valve and modify the vent Line.
Moc 106 / 2012 completed on 27/5/2014
Tank 1103 Top open 20'' hole install 20'' nozzel.
Start on 9/5/2014 Blinding
Moc 103/2013
Tank 1107 Top open 20'' hole install 20'' nozzel.
Moc 2013/1203 Completed on 12//5/2014
Tank 1103 modify the insulation Ring.
Moc 283/2013 = additional 3no support at existing beam Yeo Hong
Replace the over block 1 ton to 2 ton.
( Tender ) Moc 1269/14 = install 20'' nozzel at T-1102 top Yeo Hong
( Tender ) M20141306 Atmospheric Relief Project - HHOB Yeo Hong
( Tender ) M20141108 T-6 ( Removal of T-7019A/B , T-7021 , T7018 ( Zine components )insulation for CUI
-
7/27/2019 Chevron Jod Scope
6/35
-
7/27/2019 Chevron Jod Scope
7/35
Mechanical NathanSRU Area
Replace the 1'' BFW - 80050-seb1 -H30 pipe spool
Waiting window
M1 Area
Replace the 4'' PL-31081 -SE1 pipe spool.Waiting window
Vessel 4015 7/1/2014
Remove the 8''pipe spool for inspection (Completed)
Z-9402A
To weld full encirclement sleeve on 2 location of the
24'' sea water pipe leaking butt welded joint. ( Completed. )
P-8124A Fabrication Tempoary pipe spool for discharge and
sunction Line for washing4/4/2014 completed.
Tank 1107 make the new BV cover and Tray completed on 15/8/2014
Tank 3060 make the new BV Tray completed.
Replace the WO line 1'' pipe 6m with flange at utilities area. (Moc 283/13)22/5/2014 completed.
VP-3020 E1 Replacement including 50 ton crane on21/5/2014 Completed.
P-1001C Tube add support completed on 22/5/2014
Install the handrail nearP-3760 completedon 23/5/2014
Tank 1103 Completed.
Tank 1103 remove the BV / EH cover / open manhole / steam coil hydrotest and doubler plate at shell.
K-9201shop fabriaction 8'' pipe spool 504mm completed on 4/6/2014
Pump 3710 shop fabriaction 1/2'' flange 3 no completed on 4/6/2014
P2 S5 10'' pipe spool stainless steel Completed on 26/6/2014
SF3050 blinding on 8/7/2014Blinding / Deblinding and Hydrotest completed on 1/8/2014 Friday
SF-3050 CUI SCM pipe Replacement in Kindcompleted
SF3050 Top Cover Nozzel ( N6 ) Repaircompleted.
Replacent in kind for 1/2'' SM steam piping due to cui at U-50 ( near V-5002 )
PT - 8526B Replace the 3/4'' PV-93003-SE1 completed on 25/7/2014
-
7/27/2019 Chevron Jod Scope
8/35
T-1031 Blinding and Deblinding foe JEC washing on 25/7/2014completed on 1/8/2014 Friday
V -4015 internal Blinding / deblinding replace blade and stream oil hydrotestcompleted.
-
7/27/2019 Chevron Jod Scope
9/35
Mechanical DdwinTank 7027 CUI piping replacent in kind for line no 1-1/2'' SCM 70092-Se1
h40 as MarkerCompleted.
Unit 20 ( shutdown on 13/1 to 16/1/2014 ) Completed
Replace the 3'' CLW / CLWR pipe spool ( Seal pot remove pipe spool for inspection )Completed.
S-1285Filter aid Transfer Pressure Vessel
Replace the Filter Completed.
VP - 2520 ( shutdown on 13/1 to 18/1/2014 ) Completed
Remove sealpot nozzel for inspection and send cooler Admath washing Completed
V-2520remove pipe spool unluging and cleaning for inspection. Completed
VP - 2620 ( shutdown on 19/1 to 24/1/2014 )Completed
Remove sealpot nozzel for inspection and send cooler Admath washing Completed
V-2620remove pipe spool unluging and cleaning for inspection. Completed
V - 5520 ( shutdown 0n 26/1 to 28/1/2014 ) Completed
Remove the pipe spool unluging and cleaning for inspection. Completed
BF 3760 and 3860Remove the strainer basket for inspectionCompleted.
P-5653 and P2040 replace the drain valve NPT pipe spool.
ISO Tanker repair stopper completed
T-1028 Manhole flange face repair and shop fabication 3'' spool for T-1028 internal usecompleted
Reactor 2610Hot oil coil Leaking at 1st pass completed on 3/6/2014
Cyclone Top cover 18/6/2014 to 19/6/2014 completed
N5601 Cyclone top cover repair work including PT and hydrotest.
Cyclone Top cover 23/6/2014 to 24/6/2014 completed
N5602 Cyclone top cover repair work including PT and hydrotest.
1 inch acetic acid piping repair ( 1'' RM-10243-SSS2A ) completed on 23/7/2014
Modify the outfall screen at admin building strom drain completed on 2/8/2014
M-2 / V-5743
To weld repair line No:2 - DW-57236-SSS1 Leaking at the bottom of welded joint Rev-1
additional Emergency eye wash SS/F1/05 1'' pin hole. Unit 57completed.
T-6 T-7060 completed on 18/8/2014
To weld repair line No:2 - DW-96135-SSS1 Leaking at the bottom of welded joint Rev-1
Unit 20 19/8/2014
Replace the VP-2051 50 ton crane Lifting completed.
Jetty 11/8/2014
-
7/27/2019 Chevron Jod Scope
10/35
Repair the 8'' clamp pipe shoe support Completed on 14/8/2014
Admin Building Replace the Air - con piping support
Vessel 2621 and V5521 Blinding / washing for inspection
Unit 26 PSV and Rupture disc Replacement
E-5510 Fin Fan API inspection
-
7/27/2019 Chevron Jod Scope
11/35
Mechanical JermmySupply 5 person and 1 foreman = ( 0800 to 1900 ) 6/1/2014
Supply 4 person and 1 foreman = ( 0800 to 1900 ) 7/1/2014
Supply 4 person and 1 foreman = ( 0800 to 2000 ) 8/1/2014
Supply 4 person and 1 foreman = ( 0800 to 1900 ) 9/1/2014
Supply 4 person and 1 foreman = ( 0800 to 1900 ) 10/1/2014
Cabinet work fabraication 6/1/2014completed
SEP Equipment the support for Tank drum
Tank - 1034 = Agitator A/B Polybutene ( 2300 MW ) storage Tank
Tank - 1035 = Agitator A/B Polybutene ( 2300 MW ) storage Tank
Tank - 1036 = Agitator A/B Polybutene ( 1000 MW ) storage Tank
Tank - 1037 = Agitator 150N Lube Ol Storage Tank
Tank - 1038 = Agitator 150N Lube Ol Storage Tank
Tank - 1039 = Agitator 600N Lube Ol Storage Tank
Tank - 1073 = Agitator EC Storage Tank
Tank - 1074 = Agitator HPA Storage Tank
Tank - 1111 = Agitator A/B PIBSA 2300 ( OLOA 15833 ) Storage Tank
Tank - 3240 = Agitator SF-3250 Filter Feed Tank - 1
Tank - 3241 = Agitator SF-3250 Filter Feed Tank - 2
Tank - 3260 = Agitator SF-3250 Filtrate Rundown Tank - 1 ( 2pcs ) 10/6/2014
Tank - 3261 = Agitator SF-3250 Filtrate Rundown Tank - 2
Tank - 3271 = Agitator Tempered Oil Surge Tank
Tank - 3340 = Agitator SF-3350 Filter Feed Tank -1Tank - 3341 = Agitator SF-3350 Filter Feed Tank -2
Tank - 3360 = Agitator SF-3350 FiltratebRundown Tank - 1
Tank - 3361 = Agitator SF-3350 FiltratebRundown Tank - 2
Tank - 3760A = Agitator R-3710 Filtrate Rundown Tank
Tank - 3760B = Agitator R-3710 Filtrate Rundown Tank
Tank - 3860A = Agitator R-3810 Filtrate Rundown Tank Date 10/6/2014
Tank - 3860B = Agitator R-3810 Filtrate Rundown Tank Date 10/6/2014
Tank - 7020 = Agitator OLOA 267 Storage Tank
Tank - 7022 = Agitator OLOA 269RJ Storage Tank
Tank - 7072 = Agitator A/B OLOA 19022 Storage Tank
Tank - 7073 = Agitator A/B OLOA 219C Storage TankTank - 7074 = Agitator A/B OLOA 262 Storage Tank
Tank - 7075 = Agitator A/B OLOA 10400X Storage Tank
Tank - 7076 = Agitator A/B OLOA 1300 Storage Tank
Tank - 7406 = Agitator A/B Tanker shipping Tank - 6
Tank - 7407 = Agitator A/B Tanker shipping Tank - 7
Tank - 7408 = Agitator A/B Tanker shipping Tank - 8
Tank - 7409 = Agitator A/B Tanker shipping Tank - 9
Tank - 7410 = Agitator A/B Tanker shipping Tank - 10
-
7/27/2019 Chevron Jod Scope
12/35
Tank - 7411 = Agitator A/B Tanker shipping Tank - 11
Tank - 7412 = Agitator A/B Tanker shipping Tank - 12
Install the Pot and drain pipe at P-3311,3211,3210 and 3310. completed on 3/7/2014
-
7/27/2019 Chevron Jod Scope
13/35
Mechanical AzmanE-5000replace 6'' stainless steel to V-5000 Completed.
Reactor 2510/5510 order the material for stand-by
Angle bar 100 x 100 x 10mm = 1 length
Plate bar 90 x 10mm = 1 length
GTS 316L 2.4 = 5 kgcutting disc stainless steel = 200 pcs Completed.
R-5510Replace Dip pipecompleted
Replace the Sea water Line at9041B completed
U-9001shut down on 5/5/2014 to 8/5/2014 Box-up completed.
U-9502 chiller supply to Mechanical Asman Completed.
LMO Buildingcleaning the cooling tower supply 4 persons 2 day
2014 / 1314
Pump 1064 Install Tempoary pump and s/steel 1/2'' tube air line completed.
Repair of Z-9402B Casing & internal Rubber LiningCompleted.
-
7/27/2019 Chevron Jod Scope
14/35
-
7/27/2019 Chevron Jod Scope
15/35
Project TeoMoc 305-13Provide shelter facility at Marpol Loading Platform ( Hot Dip Galvanized coating / painting)
Moc 348-13BV Line 14'' add spring support 3no
Moc 2014 / 1140 To blind E-5007 steam supply and condersate Line Completed on 7/7/2014
Moc 332-13 Remove N2 and IA line and IA line end flange and N2 blinding. Completed on 7/5/2014
Moc 341 /2013Install the Pipe shoe and stopper at 4'' pipe line. Completed on 17/6/2014
( Tender ) Moc SRU Natural Gas Conversion
( Tender ) Installation of Spring Hanger 0n R-2610 Phenate Overhead ( Moc 1286/2014 )
( Tender ) Installation of Spring Hanger 0n R-5510 Phenate Overhead ( Moc 1367/2014 )
( Tender ) Modified Existing Pipe Support at R-4010 Overhead System ( Moc 1288/2014 )
( Tender ) Moc 1346/14 To improved current fall arrest system in TF-2 similar to trial set at TF-7 ( close on 28/8/14 )
( Tender ) Moc 1303/14 HR 24-14 Install TRV Between Yvs ( close on 18/9/2014 )
-
7/27/2019 Chevron Jod Scope
16/35
-
7/27/2019 Chevron Jod Scope
17/35
PSEReplace the 4'' unground pipe at utilities and M1 area completed on 12/6/2014
near the P-1025 4''unground completed on 20/5/2014 completed
-
7/27/2019 Chevron Jod Scope
18/35
-
7/27/2019 Chevron Jod Scope
19/35
Project Charles Tan KohTender closing on 5/6/2014 ( KPW )
Carboxylate Project 8'' FW line Re-route
Tender closing on 5/6/2014 ( KPW )
Carboxylate Project Tie-in Works.
Tender closeing n 29/7/2014 ( Aug 2014 S/D )
Carboxylate Project Tie-in Works.
-
7/27/2019 Chevron Jod Scope
20/35
-
7/27/2019 Chevron Jod Scope
21/35
E /I TengMoc 284/2013 E&I Lim
Support stand 3 pcs
U-9401 Biocide injection Package 18/8/2014
Replacement strainer / biocide
50 ton crane 3 daysupply 2 fitter 1 weekcompleted
Remove and install the 16'' YV138 for service
-
7/27/2019 Chevron Jod Scope
22/35
-
7/27/2019 Chevron Jod Scope
23/35
Mechanical Jason7/16/2014
Replace the pipe clamp bolt nut and remove support (completed on 20/7/2014 )
Tender for V-9701 @ T-1
Weld repair & replacement in kind the corroder shell , nozzel , support and brackets.
-
7/27/2019 Chevron Jod Scope
24/35
-
7/27/2019 Chevron Jod Scope
25/35
Project Tan Tin Huat
Tender Moc20141165 hertel
Provide Davit for EC unloading stainless Hose and SL service station Moc20141165
Tender Moc 2014 / 1213 close on 20/ 8 /2014
To Provide cooling water lines to ZDTP Tanks T-7021 / T-7019 A / B
-
7/27/2019 Chevron Jod Scope
26/35
-
7/27/2019 Chevron Jod Scope
27/35
Operation Soon
30/7/2014 Wednesday
Barricade stand for stream near P-4010 completed on 4/8/2014
-
7/27/2019 Chevron Jod Scope
28/35
-
7/27/2019 Chevron Jod Scope
29/35
Mariefa26/7/2014 Saturday
Admin building storm drain cleaning completed.
-
7/27/2019 Chevron Jod Scope
30/35
-
7/27/2019 Chevron Jod Scope
31/35
Project Loh Tuck HongTender Moc 21041119
Cooling Tower (GTW) header tie-in and run pipes tie-in to eguipment
Tender Moc 120/131
Remove 20-FT-111 and Replace with short pipe
Tender Moc 1425-145
Relocate of Manual valve at P-9002 discharge line
-
7/27/2019 Chevron Jod Scope
32/35
-
7/27/2019 Chevron Jod Scope
33/35
Ah Lee 9762q1463 Plate roll 20'' nozzel
-
7/27/2019 Chevron Jod Scope
34/35
Name I/C Date Birth
1 Tok Kwok Hwee S1604810 J 12/20/1963
2 Lai Junjie S8236681 D 11/10/1982
3 Tan Tiak Loo S1328038 Z 9/20/1958
4 Chang Kuang Lock S1546340 F 8/8/1952
5 Lime Hock Hwa S1172347 J 11/8/1956
15/9/2014
Monday
Yap Wei Leung S1530757 I 8 0
Teo Hock Soon S1111396 F 5/9/1955 8 8
Ho Chee Beng S0107123 H 5/3/1954 8 8
Lim Chin Ann S1329146 B 10/6/1958 8 8
Lee Swee Huat S0030130 B 5/6/1953 8 8
Foong Yong Tong S1268302 B 9/29/1957 8 8
Soong Pak Sang S0334831 H 6/7/1950 8 8
Sunny worker hp 97451392
12/9/2014 Friday SIC
-
7/27/2019 Chevron Jod Scope
35/35
16/9/2014
Tuesday
17/9/2014
Wednesday
18/9/2014
Thursday
19/9/2014
Friday
0 0 0 0
11 11 11 8
11 11 11 8
11 11 11 8
11 11 11 8
11 11 11 8 bend
11 11 11 8