April 23, 2019 Coastal Resources Manager Lake Michigan Coastal Program Indiana Department of Natural Resources Indiana Dunes State Park Annex Office 1600 North 25 East Chesterton, IN 46304 Re: Federal Consistency Review Request Indiana Harbor Belt Trail Project East Chicago, Lake County, Indiana Des. Number: 1702276 Dear Ms. Vallis, Per the attached Indiana Department of Natural Resources (IDNR) Grant Application, dated April 25, 2017, the City of East Chicago was awarded $50,000 from the Recreational Trails Program (RTP) for construction of a multi‐use trail project within a segment of a former railroad in East Chicago, Indiana. The Federal Highway Administration (FHWA) is also providing funding. This letter is being sent to request a Federal Consistency Review. The project is located within the Lake Michigan Coastal Program boundary and is partially funded by the RTP. Project Details The project is in North Township, Highland U.S. Geological Survey (USGS) Quadrangle, Township 37 North, Range 9 West, Sections 31 and 32 (see attached maps showing the project area). Construction is anticipated to begin in March 2020 and end in June 2020. The project will construct a 10‐foot wide paved asphalt trail with 2‐foot wide earth shoulders from beneath the I‐90 bridge east to Indianapolis Boulevard. The proposed trail will be approximately 0.49 mile in length and will be constructed within a segment of the former Indiana Harbor Belt Railroad. A 70‐foot segment of the proposed trail will tie into an existing paved trail within Kosciuszko Park to the north and into the existing sidewalk along Indianapolis Boulevard to the east. An access driveway and parking lot facility will be constructed on the north side of the trail in the eastern project area, just south of Kosciuszko Park. The access driveway will tie into Sophia Street at the west side of Kosciuszko Park and into Indianapolis Boulevard in the eastern project area. The project will install 11 new drainage inlet pipes to facilitate stormwater drainage along the trail route. The maximum depth of excavation is anticipated to be approximately four feet below ground surface. The project will be constructed entirely within the former Indiana Harbor Belt Railroad alignment. The project will require approximately 4.52 acres of permanent right‐of‐way from the Indiana Harbor Belt Railroad. Temporary right‐of‐way will not be needed. The maintenance of traffic (MOT) will not involve any lane or roadway closures but will require short term lane restrictions at Indianapolis Boulevard. The MOT will be minimal, using signs, cones, and other devise to accommodate traffic movement along Indianapolis Boulevard. The proposed activity complies with Indiana’s approved coastal management program and will be conducted in a manner consistent with such program. If you have any questions regarding this matter, please contact Jaime Byerly, NEPA Specialist at RQAW, at 8770 North Street, Fishers, Indiana 46038, at [email protected], or at 317‐588‐1798. Thank you in advance.

Upload: others

Post on 09-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Chesterton, IN 46304 · Chesterton, IN 46304 Re: Federal Consistency Review Request Indiana Harbor Belt Trail Project East Chicago, Lake County, Indiana Des. Number: 1702276 Dear

 

 

April 23, 2019   Coastal Resources Manager Lake Michigan Coastal Program               Indiana Department of Natural Resources Indiana Dunes State Park Annex Office 1600 North 25 East Chesterton, IN 46304    Re:  Federal Consistency Review Request  

Indiana Harbor Belt Trail Project East Chicago, Lake County, Indiana Des. Number: 1702276 

  Dear Ms. Vallis,  Per the attached Indiana Department of Natural Resources (IDNR) Grant Application, dated April 25, 2017, the City of East Chicago was awarded $50,000 from the Recreational Trails Program (RTP) for construction of a multi‐use trail project within a segment of a former railroad in East Chicago, Indiana. The Federal Highway Administration (FHWA) is also providing funding.    This letter is being sent to request a Federal Consistency Review. The project is located within the Lake Michigan Coastal Program boundary and is partially funded by the RTP.   Project Details The project is in North Township, Highland U.S. Geological Survey (USGS) Quadrangle, Township 37 North, Range 9 West, Sections 31 and 32 (see attached maps showing the project area). Construction is anticipated to begin in March 2020 and end  in  June 2020. The project will construct a 10‐foot wide paved asphalt trail with 2‐foot wide earth shoulders from beneath the I‐90 bridge east to Indianapolis Boulevard. The proposed trail will be approximately 0.49 mile  in  length  and will  be  constructed within  a  segment  of  the  former  Indiana Harbor  Belt  Railroad.  A  70‐foot segment of the proposed trail will tie into an existing paved trail within Kosciuszko Park to the north and into the existing  sidewalk  along  Indianapolis  Boulevard  to  the  east.  An  access  driveway  and  parking  lot  facility  will  be constructed on  the north  side of  the  trail  in  the eastern project area,  just  south of Kosciuszko Park.  The access driveway will tie into Sophia Street at the west side of Kosciuszko Park and into Indianapolis Boulevard in the eastern project area. The project will  install 11 new drainage  inlet pipes to facilitate stormwater drainage along the trail route.   The maximum depth of excavation is anticipated to be approximately four feet below ground surface. The project will  be  constructed  entirely  within  the  former  Indiana  Harbor  Belt  Railroad  alignment.  The  project  will  require approximately 4.52 acres of permanent right‐of‐way from the Indiana Harbor Belt Railroad. Temporary right‐of‐way will not be needed. The maintenance of traffic (MOT) will not involve any lane or roadway closures but will require short term lane restrictions at Indianapolis Boulevard. The MOT will be minimal, using signs, cones, and other devise to accommodate traffic movement along Indianapolis Boulevard.   The proposed activity complies with Indiana’s approved coastal management program and will be conducted in a manner consistent with such program. If you have any questions regarding this matter, please contact Jaime Byerly, NEPA Specialist at RQAW, at 8770 North Street, Fishers, Indiana 46038, at [email protected], or at 317‐588‐1798. Thank you in advance.  

Page 2: Chesterton, IN 46304 · Chesterton, IN 46304 Re: Federal Consistency Review Request Indiana Harbor Belt Trail Project East Chicago, Lake County, Indiana Des. Number: 1702276 Dear

 

 

 

Thank you, 

 

Jaime Byerly 

NEPA Specialist 

RQAW Corporation 

 

Attachments:   

 

General location map 

USGS topographic map 

Aerial map 

IDNR Grant Application 

 

 

 

 

 

Page 3: Chesterton, IN 46304 · Chesterton, IN 46304 Re: Federal Consistency Review Request Indiana Harbor Belt Trail Project East Chicago, Lake County, Indiana Des. Number: 1702276 Dear

Project Location

Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, EsriJapan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, ©OpenStreetMap contributors, and the GIS User Community

This map is intended to serve as an aid in graphic representation only. This information is not warrantedfor accuracy or other purposes.

8770 North Street; Suite 110Fishers, IN 46038

General LocationIndiana Harbor Belt Trail Construction Project

Des. Number 1702276East Chicago, Lake County, Indiana

Map Datum: NAD 83Map Projection: UTM Zone 16 North ±

0 0.35 0.70.175Miles

Page 4: Chesterton, IN 46304 · Chesterton, IN 46304 Re: Federal Consistency Review Request Indiana Harbor Belt Trail Project East Chicago, Lake County, Indiana Des. Number: 1702276 Dear

8770 North Street, Suite 110Fishers, IN 46038

Project Location

This map is intended to serve as an aid in graphic representation only. This information is not warrantedfor accuracy or other purposes.

0 2,000 4,0001,000 Feet

USGS Topographic (1:24,000)Indiana Harbor Belt Trail Construction Project

Des. Number 1702276East Chicago, Lake County, Indiana

Map Datum: NAD 83Map Projection: UTM Zone 16 North ±Topographic Quadrangle obtained from USGS (Highland Quadrangle)

Page 5: Chesterton, IN 46304 · Chesterton, IN 46304 Re: Federal Consistency Review Request Indiana Harbor Belt Trail Project East Chicago, Lake County, Indiana Des. Number: 1702276 Dear

£¤20

CSX RR

151ST ST

UNKNOWN RR

CHICAGO SS & SB RR

WALS

H AV

READ

ING

AV

KOSCIUSKO BLVD

SOPH

IA ST

WEGG

AV

RUTH

ST

WHITE

OAK A

V

MAGO

UN AV

BARI

NG AV

E

HOME

RLEE

AV

WHITE OAK AV

NORT

HCOT

E AV

W 152ND ST

ROXANA N DR

UNKNOWN RR

CHICAGO SS & SB RR

Indiana Office of Information Technology, Indiana University Spatial Data Portal, UITS, Woolpert Inc.,

º

Map Datum: NAD 83Map Projection: UTM Zone 16 NorthThis map is intended to serve as an aid in graphic representation only.This information is not warranted for accuracy or other purposes.Data obtained from the State of Indiana GIO Library.Orthophotography and data obtained from Indiana Map Framework Data.

Indiana Harbor Belt Trail Construction ProjectDes. Number: 1702276

East Chicago, Lake County, Indiana

Aerial Map - Full Extent Location: Indiana Harbor Belt TrailTownship: NorthCounty: Lake

Permanent ROW

Page 6: Chesterton, IN 46304 · Chesterton, IN 46304 Re: Federal Consistency Review Request Indiana Harbor Belt Trail Project East Chicago, Lake County, Indiana Des. Number: 1702276 Dear