Chesapeake Bay TMDL Phase II Watershed Implementation Planning for Hampton Roads Citizens Advisory Committee Meeting May 5, 2011 Jennifer Tribo Senior Water Resources Planner

Upload: donar

Post on 20-Mar-2016

57 views

Category:

Documents


0 download

DESCRIPTION

Chesapeake Bay TMDL Phase II Watershed Implementation Planning for Hampton Roads. Citizens Advisory Committee Meeting May 5, 2011. Jennifer Tribo Senior Water Resources Planner. Hampton Roads. HRPDC and the Chesapeake Bay TMDL. 1996-2001: Locality nutrient reduction strategy options - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

Chesapeake Bay TMDL Phase II Watershed Implementation Planning for

Hampton Roads

Citizens Advisory Committee MeetingMay 5, 2011

Jennifer TriboSenior Water Resources Planner

Page 2: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

2

Hampton Roads

Shore Drive

Great Neck Road

I-264

Lond

on B

ridge R

oad

Little

Independence Blvd

Holland Road

Lynnhav

en Pkwy

First Colon ia l R

o adGre

at N

eck

Roa

d

Virginia Beach Blvd

Shore Drive

Neck R

oadW

este

rn

Eastern Branch

Lynnhaven

Broad Bay

Bra

nch

Lynnh

aven

Linkh orn Bay

Lond

on B

r idge

Cre

ek Canal #2

0 1 2 3 Miles

N

Page 3: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

3

HRPDC and the Chesapeake Bay TMDL • 1996-2001: Locality nutrient reduction strategy options• 2003-2005: James River Tributary Strategy• 2006: Implementation Plans for local impairments.• 2009: Commission briefings on TMDL development.• 2010: Attended meetings of Virginia’s Chesapeake Bay

Stakeholder Advisory Group.• 2010/2011: Developed cost estimates for

implementation of urban stormwater reductions and commented on Draft TMDL and VA WIP.

Page 4: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

4

Promoting Regional Cooperation• Elected Officials

– Monthly Commission Meetings• Locality Staff

– Stormwater Committee, Directors of Utilities, Chesapeake Bay Committee

• Other Agencies– Joint Environmental Committee

• SWCDs, Navy, HRSD, DEQ, DCR, USGS

Page 5: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

5

Virginia’s Watershed Implementation Plan• Significant reductions required for agriculture.• Phased Implementation in the James River.

– Chlorophyll a study• Wastewater held at 2005 Permit levels with

exception of Lower James River.• No net increase in loads for new development.• Extensive urban nutrient management• Additional reductions from existing development.

Page 6: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

6

Phase II WIP Development Phase II WIPs due March 2012 EPA’s expectations for Phase II WIPs:

Divide target nutrient reductions into a finer geographic scale (counties, sub-watersheds)

Identify specific controls and practices that will be implemented, no later than 2017, to meet interim water quality goals.

Page 7: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

7

Overview of Virginia Approach• Develop locality targets from TMDL basin

allocations. • Engage local governments and other

stakeholders through Planning District Commission.

• Guide localities through development of Community Conservation Information.

Page 8: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

8

Virginia’s Phase II WIP Schedule• June 2011 - Draft load reduction targets to localities

based on final TMDL

• July 2011 – EPA delivers revised load reductions to State.

• August 2011 – Revised load reduction target to localities.

• November 2011 - Localities submit final conservation strategies to Virginia.

• December 2011 – Virginia submits draft Phase II WIP to EPA.

Page 9: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

9

Concerns with Virginia’s Approach• Timeframe• Definition of local scale• Accountability for reductions from unregulated

sources• Risk that permitted sources held liable for

nutrient reduction gaps• Technical and financial assistance

Page 10: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

10

Timeframe• 3 months is not enough time to effectively engage

stakeholders • Localities need more time to evaluate the nutrient

reduction potential of sources and develop Community Conservation Information.

• Local TMDL Implementation Plans took an average of 12 months to complete.

• Piedmont Regional Pilot Project spent 10 months on stakeholder outreach.

Page 11: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

11

Definition of Local• Virginia has defined local as locality, but may

allow nutrient reduction strategies at other scales.

• Who decides the appropriate scale?• Watershed scale is best for water quality.• Locality scale is cleaner for implementation.• Questions on application of the model at the

local scale.

Page 12: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

12

Accountability for Unregulated Sources• State plan relies heavily on voluntary nutrient

and sediment reductions.• What incentives will the State give non

regulated sources to define and achieve reductions?

• How will the State address gaps if non regulated localities do not identify enough load reductions to meet the target?

Page 13: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

13

Liability for Permitted Sources• Wastewater treatment plants and MS4s at risk of

being held accountable for nutrient reduction gaps.

• This approach will make it more difficult and expensive to restore the Bay.

• Creates more challenges to meet local water quality goals.

• Need balance of incentives and consequences to be successful.

Page 14: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

14

Technical and Financial Assistance• Localities need loading targets and baseline BMP

data to begin planning.• State needs to provide guidance on tools and

methodologies for assessing nutrient reduction potential.

• Localities and PDCs need funding for data analysis and stakeholder involvement.

• Level of financial assistance depends on timeframe for plan development.

Page 15: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

15

Hampton Roads Approach to Phase II WIP Create Regional Framework for stakeholder

involvement and policy development. Set “rules” for addressing source sector reductions

outside local government control.

Create Local Government Frameworks Recommend establishment of interdepartmental teams.

Assist local governments with data collection and analysis.

Page 16: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

16

Assess nutrient loadings and sources at a Regional Scale.

Identify potential challenges to planning and implementation.

Identify opportunities /incentives related to TMDL implementation.

Phase II WIP – Initial Steps

Page 17: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

17

Hampton Roads Land Cover

NOAA 2005 Coastal Change Analysis Program (C-CAP) Regional Land Cover dataset for Virginia

Page 18: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

18

Hampton Roads Land Cover

Page 19: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

19

Hampton Roads Pollutant SourcesNitrogen Phosphorus

James River

York River

Page 20: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

20

Regulated Sources in Hampton Roads• Significant Wastewater Discharges

– 8 Hampton Roads Sanitation District discharges• Stormwater

– 6 Phase I MS4s– 6 Phase II MS4s– Permitted Federal facilities– VDOT– Multiple Industrial discharges

Page 21: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

21

Regulated Lands in Hampton Roads

Page 22: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

22

Nutrient Reductions for Hampton Roads

James River York RiverSource Nitrogen Phosphorus Nitrogen Phosphorus

Ag 12% 27% 38% 36%Urban 24% 39% 14% 20%Point 57% 67% -3% -22%Septic 9% 0% 9% 0%Forest -1% 5% -1% 9%

AtmDep -2% 0% -1% 10%Total 16% 26% 15% 14%

Page 23: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

23

Major Challenges to Implementation• Defining the appropriate local scale.• Cost of urban stormwater management.• Creating flexibility for trading between

regulated and unregulated sources.• Expanding the options for nutrient reduction

strategies.• Local government needs.

Page 24: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

24

Bay Segmentsheds in Hampton Roads

Page 25: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

25

Locality

Estimated Stormwater Capital Cost (Millions)

EPA Backstops Final VA WIPWIP with Nutrient

ManagementChesapeake $1,367 $343 $152 Hampton $1,053 $293 $110 Newport News $1,166 $299 $133 Norfolk $1,384 $343 $162 Portsmouth $666 $165 $75 Virginia Beach $1,737 $433 $195 Isle Of Wight $231 $58 $25 James City $501 $128 $54 Poquoson $90 $27 $8 Suffolk $628 $157 $70 Williamsburg $94 $25 $10 York $594 $173 $60 Gloucester $242 $71 $23 Surry $40 $10 $4 Hampton Roads Total $9,792 $2,523 $1,080

Page 26: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

26

Nutrient Trading in Hampton Roads

Page 27: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

27

Cost Effective Nutrient Management• No Discharge Zones• Oyster Restoration • Wetlands Restoration• Green Infrastructure Planning and Implementation• Education Programs• Street Sweeping

Page 28: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

28

Local Government Needs

1. Funding1. Planning2. Implementation

2. Better information on the Bay Models and input data.

3. Tools for determining local nutrient reduction potential.

Page 29: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

29

Incentives and Opportunities• Improved local water quality.

• Improved quality of life.

• Threat of future regulatory action.

• Opportunity for trading to create financial incentives.

• Opportunity for technical innovations.

Page 30: Chesapeake Bay TMDL Phase II Watershed Implementation Planning for  Hampton Roads

30

Questions