Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

1

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA

MINISTRY OF WORKS AND URBAN DEVELOPMENT

CHECK – LIST

FOR USE BY BUILDING CONSTRUCTION SUPERVISORS

Ministry of Works and Urban Development

Addis Ababa, Ethiopia

2001

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

2

FOREWORD

The Proclamation to define the powers and duties of the Federal and Regional Executive

organs of the Federal Democratic republic of Ethiopia No. 4/1995 empowers the Ministry of

Works & Urban Development to prepare the Country's Building Code, issue Standards and

Guidelines for design and construction works, registration of professionals and consultants and

follow up and supervise the implementation of same.

In exercising these powers and in discharging of its responsibilities, the Ministry is issuing a

series of Building Code Standards, Manuals and Guidelines of general application.

The purpose of these documents is to serve as nationally recognized documents, the application

of which is deemed to ensure compliance of constructions with the minimum requirements for

design, procurement procedures, construction and quality of materials set down by the

Ministry.

The major benefits to be gained in applying these documents are the harmonization of

professional practice and the ensuring of appropriate levels of safety, health and economy with

due consideration of the objective conditions and needs of the country.

As the documents are technical documents which, by their very nature, require periodic

updating, revised editions will be issued by the Ministry from time to time as appropriate.

The Ministry welcomes comments and suggestions on all aspect of the documents. All

feedback received will be carefully reviewed by professional experts in the field with a view to

possible incorporation of amendments in the future editions.

Haile Assegide

Minister

Ministry of Works and

Urban Development

2001

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

3

PREFACE

This check-list for site supervisors is issued by the Ministry of Works and Urban Development for

use by Employers, Consultants and Contractors in order to ensure a uniform system of supervision

of building construction projects and as a result ensure a safe and durable construction. It is to be of

use mainly when construction works are carried out by contractors and can in some ways be of use

for construction carried out by direct labour. In this check-list the responsibilities, liabilities and

limitations of the supervisor are briefly mentioned. The steps to be followed in checking building

construction works are expressed in general terms. Details of construction are specified in the

drawings, technical specifications and in the general and special provisions of the contract. The duty

of the site supervisor is to ensure that the construction works are executed in accordance with the

contract requirements. Therefore in the application of this check-list the details specified in the

contract document always precede before the application and use of it. There are also tables and

forms in this check-list that help as records of the incidences affecting the work and as references. In

addition the standard technical specification is used as reference on the preparation of this check-

list.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

4

ACKNOWLEDGEMENT

In July 2000, the Ministry of Works and Urban Development invited National

Consulting firms to compete for the preparation of codes and manuals. One of

these, is the present " ______________________"

Tessema Demisse Consulting Architects and Engineers was awarded the

contract for the preparation of this document, and prepared it in association with

professionals.

The working group of the document was:

Damtew Wolde, __________________,

who drafted the document; and

Beyene Wolde Gabriel, B.Sc. (Eng.),

who reviewed the document with comments and suggestions.

The document is based on " ________________________ " prepared by the

World Bank for use of its browses.

After presentation to the MoWUD, the document was commented on by

professionals of the Ministry and other invited institutions and individuals.

MoWUD wishes to acknowledge the contributions made by the Consulting Office

and the associated professionals involved in its preparation and to thank all those

who made comments.

Our thanks also to ________________ for use of their document.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

5

TABLE OF CONTENTS

PAGE

FORWARD ……………………………………………………………………… 1

PREFACE ............................................................................................................. 2 ACKNOWLEDGEMENT ..................................................................................... 3 1. INVESTIGATION & PREPARATION OF SITE ................................................. 6

2. SETTING OUT ...................................................................................................... 6

3. EXCAVATION & EARTHWORK ....................................................................... 6

4. FOUNDATION TRENCH & PIT EXCAVATION................................................ 7

5. FOUNDATION IN STONE MASONRY .............................................................. 8

6. BACK FILLING...................................................................................................... 8

7. HARD CORE ......................................................................................................... 9

8. CONCRETE ........................................................................................................... 9

9. PRESTRESSED CONCRETE .............................................................................. 13

10. FORM WORK........................................................................................................ 14

11. STEEL REINFORCEMENT ................................................................................. 16

12. MORTAR .............................................................................................................. 17

13. STONE MASONRY ............................................................................................. 17

14. HOLLOW CONCRETE BLOCK WALL ............................................................. 18

15. WALLS WITH BRICKS........................................................................................ 19

16. WOODEN WALLS............................................................................................... 20

17. PLASTER AND POINTING................................................................................. 20

18. STRUCTURAL STEEL WORK........................................................................... 20

19. PAVIOR (TILES PAVIOR) .................................................................................. 22

20. WALL TILES ........................................................................................................ 22

21. P. V. C. TILES....................................................................................................... 22

22. ROOFING AND CLADDING .............................................................................. 23

23. GUTTERS AND DOWN PIPES........................................................................... 24

24. CARPENTRY AND JOINERY ............................................................................ 24

25. CEILING ............................................................................................................... 25

26. PAINTING............................................................................................................. 25

27. GLAZING.............................................................................................................. 26

28. WATER WELL..................................................................................................... 26

29. WATER SUPPLY LINES..................................................................................... 26

30. PLUMBING AND SANITARY INSTALLATIONS............................................ 26

31 SEWER SYSTEM................................................................................................. 27

32. SEPTIC TANK & SOAK AWAY PIT.................................................................. 28

33. ELECTRICAL INSTALLATIONS ....................................................................... 28

34. RETAINING WALLS........................................................................................... 29

35. SITE WORK.......................................................................................................... 30

36. ROAD AND FOOTPATHS .................................................................................. 30

37. DRAIN CHANNELS & CULVERTS................................................................... 31

38. FENCING AND GATE......................................................................................... 31

39. PREPARATION OF PAYMENT CERTIFICATES............................................. 32

40. INFORMATION IN CONSTRUCTION PROCEDURES ................................... 32

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

6

TABLE OF CONTENTS

TABLES & FORMS PAGE

1. TABLE 8.5.3a. STANDARD CONCRETE MIX …………………………….. 33

2. TABLE 8.5.3b. STANDARD CONCRETE MIX .............................................. 34

3. HANDING OVER THE CONSTRUCTION SITE ............................................. 35

4. ACQUISITION OF DOCUMENTS .................................................................... 36

5. FOR MATERIAL TESTING .............................................................................. 37

6. EVALUATION OF TEST RESULTS .................................................................. 38

7. SOIL IDENTIFICATION AND ACCEPTANCE

OF EXCAVATION FOUNDATION DEPTHS ................................................... 39

8. SITE DIARY ........................................................................................................ 40

9. MONTHLY REPORT ......................................................................................... 41

10. QUARTERLY REPORT .................................................................................... 46

11. WORK ORDER ................................................................................................... 51

12. PAYMENT CERTIFICATE ................................................................................ 52

13. SITE HANDOVER INSPECTION CERTIFICATE............................................ 55

14. SITE PREPARATION INSPECTION CERTIFICATE....................................... 56

15. FOUNDATION EXCAVATION INSPECTION................................................. 57

16. EARTHWORKS INSPECTION CERTIFICATE................................................ 58

17. MATERIAL QUALITY EVALUATION CERTIFICATE .................................. 59

18. CONCRETE WORK INSPECTION CERTIFICATE ......................................... 60

19. MASONRY WORK INSPECTION CERTIFICATE .......................................... 61

20. STRUCTURAL STEEL WORK INSPECTION.................................................. 62

21. STRUCTURAL TIMBER WORK INSPECTION............................................... 63

22. CARPENTRY & JOINERY WORK INSPECTION ........................................... 64

23. ROOFING & CLADDING WORK INSPECTION ............................................. 65

24. FINISHING WORK INSPECTION CERTIFICATE........................................... 66

25. SITE WORK INSPECTION CERTIFICATE...................................................... 68

26. MINUTES OF INSPECTION FOR TEMPORARY ACCEPTANCE ................ 70

27. TEMPORARY ACCEPTANCE ........................................................................ 72

28. FINAL ACCEPTANCE ...................................................................................... 75 APPENDIX 1 : GUIDELINE ON CONTROL OF

CONSTRUCTION PROJECTS .............................................. 79

APPENDIX 2 : LIST OF MAJOR DUTIES AND RESPONSIBILITIES OF A RESIDENT ENGINEER (SUPERVISOR) ................................................ 84

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

7

1. INVESTIGATION AND PREPARATION OF SITE

CHECK:

1.1 The site visually if underground utilities cross it.

1.2 The site on maps showing the location of underground structures and utilities to avoid

breaking them during construction.

1.3 The site plan and layout of buildings and sewer system specially concerning levels and soil

condition. If changes are necessary submit a written report to the designer.

1.4 The area to be cleared off and take measurements.

1.5 The trees and bushes within the foundation to be cut and rooted up as given in the standard

technical specification.

1.6 Permission is obtained from local authorities to cut down trees outside the foundation areas.

1.7 Boarder lines are agreed with local municipality and corner stones placed.

1.8 The connection points for water and electricity are agreed upon with local authorities.

1.9 All necessary temporary drains are constructed to keep the site free of water.

2. SETTING OUT

CHECK:

2.1 The setting out is done correctly with proper measuring tape and accurate levelling

instrument.

2.2 All measurements to confirm the accuracy and correct locations of working areas are

properly stated out.

2.3 The elevation reference point in accordance with the survey map, and confirm.

2.4 All bottom of trenches and floor levels are according to the elevations shown on the

drawings.

3. EXCAVATION AND EARTHWORK

3.1 Check all top soil is excavated separately.

3.2 Decide the place to pile up the suitable excavated material and check it is 2 meters outside

the building perimeter.

3.3 Decide the place for the cart away which is not necessary for backfilling or terracing.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

8

CHECK:

3.4 For sites where blasting is proposed, the explosives are used in the quantities and manner

recommended by the manufacturers. Check a written consent is obtained on each occasion

the contractor wished to use explosives.

3.5 All excavations are carried out to the lines, levels, widths and depths shown on the

drawings.

3.6 Any discrepancies in levels, dispositions etc. are reported to the engineer prior to

proceeding with the works.

3.7 All necessary temporary drains and culverts are constructed to keep the site free of water.

3.8 Slopes to embankments, cuttings, shoulders, ditches etc.; are trimmed to the dimensions

and inclinations shown on drawings.

3.9 Cut for roads is carried out until a level of suitable material is allowed.

3.10 Excavations are suitably trimmed and levelled before any concrete or masonry work is

placed.

3.11 In locations where the soil is subject to softening during excavation, a bottom layer of soil

removed immediately before the placing of concrete, in accordance with the standard

technical specification.

4. FOUNDATION TRENCH AND PIT EXCAVATION

CHECK:

4.1 The foundation drawings to correspond with the conditions on the site, if not prepare a

written report and submit to the designer immediately.

4.2 The foundation depth, width, line and levels to correspond the drawings.

4.3 The excavation or foundation is executed 25cm. wider on each side than the thickness of

the foundation wall as given in the standard technical specification.

4.4 The trench and pits to be clean from grass, bushes and pieces of wood.

4.5 The trench and pits to be kept free of water by pumping or other means.

4.6 The foundation engineer has accepted the excavated foundation depths by filling form No.

005.

4.7 The foundation excavation is suitably trimmed and levelled before concrete or masonry

work in placed.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

9

4.8 In the event of over excavation, without approval the area to be filled with selected

excavation or borrowed material or class 5 concrete in accordance with the standard

technical specification.

4.9 The faces of excavation is retained with sheeting, tim-bearing, strutting and shoring to

protect workmen and prevent damage where necessary.

5. FOUNDATION IN STONE MASONRY

CHECK:

5.1 The trench to be clean from grass, bushes and pieces of wood.

5.2 The stone is of the type given on specifications.

5.3 The stone to be hard, sound, free from cracks and decay and not weathered.

5.4 The stone is freshly quarried from an approved quarry.

5.5 The stone not to be round surfaced.

5.6 The stone masonry execution is with specified mortar and with well filled joints.

5.7 The stone masonry during execution is kept free from solid and other kind of dirt.

5.8 The length of stone does not exceed three times its height.

5.9 The mix of lean concrete to correspond the specification.

5.10 The mix proportion of mortar is correct.

6. BACKFILLING

CHECK:

6.1 All internal back filling is done with approved material, if possible with material excavated

on the site.

6.2 All external backfilling around foundation walls and behind retaining walls shall be done

with approved selected materials, if possible with material excavated on the site which is

capable of being compacted and form a stable filling.

6.3 all organic materials, such as pieces of wood, roots, bushes and black cotton soil are

removed from all backfill material.

6.4 All ground trenches and places where backfilling shall be executed are clean from grass,

bushes and pieces of wood.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

10

6.5 Where pipes and electrical cables are in connection with the backfilling, the work shall be

executed very carefully, so they do not break or get damaged.

6.6 All backfilling to be in layers and compacted to 95% of maximum dry density in

accordance with the standard technical specification.

6.7 Each layer to be well rammed and consolidated with the addition of water as necessary to

achieve the required compaction.

6.8 The maximum layer of fill for one time compaction does not exceed 20cm. thickness in

accordance with the standard technical specification.

6.9 Depressions or voids that are crated during trimming of slopes to embankments, cuttings,

shoulders, ditches etc.; are filled with suitable material and to approved compaction.

6.10 Any material which after repeated compaction does not fulfil the requirements is removed

and replaced.

7. HARD CORE

CHECK:

7.1 Stone for hardcore is sound and approved quality.

7.2 All stones in the hardcore are of approximately equal and recommended size.

7.3 All hardcore is well rammed and consolidated with the top surface blinded with crushed

aggregate of 20mm. thickness in accordance with the standard technical specification.

7.4 The thickness of the hardcore satisfies the specification or design.

7.5 the placing of stones to result in minimum voids.

8. CONCRETE

CHECK:

8.1 All ingredients cement, aggregates and water are of the type and quality specified.

8.2 Cement is fresh, not older than six months and is delivered to the site in the manufacturer's

original sealed bags.

8.3 Cement is stored in a dry and well ventilated store, on a wooden floor raised minimum

20cm. above the ground.

8.4 Cement is stocked separately.

8.5 The cement has markings showing the type and date of consignment pinned to it and check

it is used in the order of its arrival.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

11

8.6 Cement more than six months old after production is tested to satisfy the specified

requirements.

8.7 Sand or fine aggregate to be clean river or pits sand of approved quality and consist of

hard, dense, durable uncoated rock fragments.

8.8 Sand to be clear of impurities like dust, mica and organic matter.

8.9 Rejected samples of aggregates are removed from the site within 24 hours.

8.10 Coarse aggregate to be crushed basaltic stone or gravel of approved quality.

8.11 Coarse aggregate to be hard, dense, durable non-porous and uncoated rock fragments.

8.12 Coarse aggregate to be free from impurities like clay, soft thin elongated or laminated

pieces and shall be free from alkali and organic matter.

8.13 The gradation of coarse aggregate to comply with the standard technical specification.

8.14 Before any coarse aggregate is delivered to the site, the quality is approved at the quarry by

the designer.

8.15 Aggregates are stored on clear hard surface to prevent contamination by soil.

8.16 Different grades are stocked independently.

8.17 Water used for mixing concrete is clean and free from injurious amounts of oil, acids,

alkalies, organic materials.

8.18 Water is not taken from sea or tidal rivers to be used for structural concrete. If possible

water shall be piped or otherwise stored in an enclosed container free from contamination.

8.19 If there are any doubts about the quality of the water a sample shall be sent to the designer

or engineer for testing.

8.20 If the temperature of the water exceeds 60°c it is first mixed with the aggregate before the

cement is added.

8.21 The concrete is mixed to a uniform colour and consistency prior to placing.

8.22 Hand mixing is not allowed but if unavoidable shall be used only for class II concrete and

shall under no circumstance be allowed for concrete of class C-200 and higher.

8.23 Concrete is mixed in an approved mechanical batch mixer machine, the mixer is

thoroughly cleaned from hardened concrete and other kind of dirt before use.

8.24 Mixer which has been out of use for more than 20 minutes is thoroughly washed before any

fresh concrete is mixed as specified in the standard technical specification.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

12

8.25 The mixer drum is tight to avoid loss of mortar. The values must not leak mixing water.

8.26 The specified mixing time is carefully adhere to but in no case shall the mixing discontinue

for less than 2 minutes after adding water as specified in the standard technical

specification.

8.27 The batch capacity. The contractor must not be allowed to exceed the rated capacity of the

mixer.

8.28 The materials enter the drum rapidly.

8.29 The whole of the mixed batch is removed before materials for fresh batch enter the mixer.

8.30 Mixed concrete is not modified by the addition of extra water or cement, in order to

facilitate handling or any other purpose.

8.31 Before any casting starts at the site, test cubes of side dimension 15x15x15 or cylinders of

diameter 15cm and length 30cm of wood or steel are made ready.

8.32 All reinforcement and form work are properly placed prior to any concreting and the mix

approved and also check from No. 004 is filled and approved by the designer.

8.33 For any one structure samples are made at the same time from the same batch and the date

clearly marked on each cube.

8.34 Test cubes are made when directed but not less than one set of nine cubes for each 100m3

of concrete placed, or if the rate of placing is less than 100m3 then each 10 days or every

floor for multi-storey structures in accordance with the standard technical specifications.

8.35 Three cubes of each set are tested at 3 and 7 or 7 and 14 days and the third at 28 days all in

accordance with the code of practice.

8.36 In the absence of approved design mix that the standard mixes in Tables 8.5.3a and table

8.5.3b or the mix design given in the standard technical specification are followed.

8.37 Before any casting starts the consistency of fresh concrete must be measured using the

slump test, from the same batch for test cubes.

8.38 Concrete is son transported as rapidly as practicable and placed such that contamination,

segregation or loss of constituent materials does not occur.

8.39 All placing of concrete starts from one end and continue in the same direction without any

break.

8.40 Concrete is deposited as near as practicable and no concrete is dropped from a height

exceeding 2 meters as specified on the standard technical specification.

8.41 When chutings is used the inclination of the chute shall be such as to allow the concrete to

flow without the use of water in excess of the specified volume for mix and without

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

13

segregation or loss of the ingredients. Details of any proposed chuting plant must be

approved before the plant is delivered.

8.42 The vibration is carefully done, and continues until a dense homogeneous mass is produced

and surface is fairly smooth.

8.43 Concrete is not over vibrated so that the consistency of the concrete is maintained and

separation of materials is caused.

8.44 If construction joints are necessary they are approved by the designer.

8.45 When concrete casting continues on a construction joint, the joint is clean from foreign

matter.

8.46 When concrete casting continues on a construction joint, the surface of the joint is

roughened and aggregate is exposed without being damaged.

8.47 The roughened surface of the construction joint is wetted with thin layer of mortar prior to

concreting.

8.48 After casting is completed and for 7 days thereafter, that the concrete is kept damp (cured)

to minimize loss of moisture from the concrete.

8.49 Whenever testing of a material is required fill the requisition from No.005 and for the

evaluation of test result fill form No.006 and get the approval of the engineer or designer

when the result is submitted.

8.50 Inspection prior to concreting:

CHECK:

− The rigidity of the scaffolding and shuttering

− The leak-tightness of joints between form work elements

− Conformity of the dimensions of the form work with the (drawings)

− The cleanliness of the form work

− The surface conditions of the reinforcement

− The position and size of reinforcement

− The rigidity of the reinforcement securing systems, and the quality of the joints between

bars.

− Cover to reinforcement is correct.

− Class of concrete, mix design and water cement ratio.

8.51 Pre cast concrete is cast under sheds and remain in the moulds for 3 days and further 7

days after removal from the moulds. Then removed from the sheds and stocked in the

open for at least 7 days to season.

8.52 Random load testing is made on the pre cast units and the damaged ones immediately

replaced.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

14

8.53 Pre cast units and hoisted and placed in proper position in such a way as to avoid over

stressing or damaging the units nor causing damage to previously erected structure.

8.54 If any doubt about the quality of, aggregate, cement, reinforcement and water arises sample

are sent for testing.

9. PRESTRESSED CONCRETE

CHECK:

9.1 All pre stressing components are stored in clean dry conditions.

9.2 All pre stressing components are clean and free from loose rust at the time of fixing in

position and subsequent concreting.

9.3 All pre stressing tendons are not welded within the length to be tensioned.

9.4 All pre stressing tendons (cables) are not twisted and individual wires or strands are

identifiable at each member.

9.5 All ducts and tendons are respectively sealed and protected until the tendon is threaded

through and the stressing operations are commenced.

9.6 All anchor cones, blocks and plates are positioned and maintained during concreting such

that the center line of the duct passes axially through the anchorage assembly.

9.7 All bearing surface of the anchorages are clean prior to concreting and tensioning.

9.8 The tendons immediately and during stressing do not exceed the strength specified.

9.9 Stressing is from both ends unless required or agreed by the engineer.

9.10 The tendons are anchored only if the pre stressing is applied to the satisfaction of the

engineer.

9.11 The jack pressure is released in such a way as to avoid shock to the anchorage or

tendons.

9.12 If the pull-in of the tendons at completion of anchoring is greater than that agreed by the

engineer, the load shall be released slowly and tensioning carried out afresh.

9.13 Sufficient test cubes are taken and specified transfer strength is attained.

9.14 The tendons are not cropped or cut prior to 3 days after grouting.

9.15 Full records of all tensioning operations including the measured extensions, pressure

guage or load all readings and the amount of pull-in at each anchorage, are kept.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

15

9.16 All ducts are thoroughly cleaned by compressed air or method specified prior to

grouting.

9.17 all anchorages are sealed before grouting.

9.18 The ducts are completely filled with grout.

9.19 The filled ducts are protected to the satisfaction of the engineer that they are not

subjected to shock or vibration for one day.

9.20 Full records of grouting including the date each duct was grouted is kept.

9.21 The grout mixer produces a grout of colloidal and uniform consistency.

9.22 The grout is mixed for a minimum of two minutes unless otherwise specified.

9.23 No admixtures like chloride or nitrates are used. But if other admixtures may be used a

written permission must be submitted from the engineer and check it is applied strictly

with the manufacturer's instructions.

9.24 The gout consists only of ordinary port land cement and water unless otherwise

specified.

9.25 Pre stressed members are lifted or supported only at the points specified and handled

and placed without impact.

9.26 Beams are prevented from moving laterally during the placing of the in situ concrete.

9.27 The engineer informed in advance of the date of commencement of manufacture and the

dates when tensioning of tendons, casting of members and transfer of stress will be

undertaken for the first time for each type of beam.

9.28 All pre stressed concrete construction comply the standard technical specification.

10. FORM WORK

CHECK:

10.1 Form work is so constructed that it can be stripped from the hardened concrete easily

without hammering or without such shock or vibration in order to protect the concrete

or reduce labour cost.

10.2 The bracing of the form work. The form work must be strong enough to carry the load

until the concrete is strong enough to carry itself and hardened sufficiently.

10.3 The inside surface of form works shall, except for permanent form works, or unless

otherwise agreed by the engineer, are coated with a release agent.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

16

10.4 Release agents do not come into contact with the reinforcement and anchorages, and

should not be visible on the finished works.

10.5 Wooden form works for unexposed concrete surface, are executed of sawed boards with

sharp edges and of the same thickness.

10.6 Wooden form works for exposed concrete surface are generally of tongued and grooved

boards of the same thickness and free from knots, holes, cracks and splits.

10.7 Form work lumber shall be kept under shed and in varying thickness and width and

shall be constantly aerated and under weight to prevent it from decay.

10.8 Before any concreting starts, the form work has the right dimensions and is level and

straight.

10.9 Before any concreting starts, all forms are thoroughly cleaned out and free from holes

and dirt.

10.10 The top level of the form work is at the same level as the top of the finished concrete.

10.11 All form work is removed without any damage to the concrete during the striking.

10.12 After removal of the form work remedial treatment to surfaces of the hardened concrete

is carried out immediately without delay and period of removal is as follows:

for vertical form work to columns, walls and beams - 16 hrs.

for soffit form work to slab - 21 days

for props to slabs - 14 days

for soffit form work to beams - 21 days

for props to beams - 14 days

in accordance with the standard technical specification.

10.13 Where intended to re-use form work it is thoroughly cleaned and made good to the

satisfaction of the engineer.

10.14 Stripping of form work not to be done until concrete is set i.e. should ring under a

hammer blow. In no circumstances shall form work be struck until the concrete attains a

cube strength of at least twice the stress to which it may be subjected at the time of

striking.

10.15 All form work construction and quality comply the standard technical specification.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

17

11. STEEL REINFORCEMENT

CHECK:

11.1 Steel reinforcement is stored in clean condition. It should be free from loose rust.

11.2 All reinforcement bars are of the specified quality and in accordance with the standard

technical specification.

11.3 Given in the design in cases where certificates for ultimate tensile strength, yield stress,

elongation and cold bend tests are not issued by the manufacturers.

11.4 The dimension, length and shape of the reinforcement bars is according to the drawings

and specifications.

11.5 Bending of reinforcement bars is done with adequate bending tools. But heat is strictly

not allowed for bending of reinforcement bars.

11.6 All bars with cracks or splits at the bend are not used for construction.

11.7 All mild steels have their ends booked, and the bending radius meets the specification.

11.8 All reinforcement bars are clean and free from loose rust, grease, oil, or tar and other kind

of dirt.

11.9 The reinforcement bars are placed in position according to the drawings, and firmly

bound together with mild steel wire, diameter 1.6mm in accordance with the standard

technical specification.

11.10 Before any casting of concrete starts, that pre cast concrete blocks or spacers or metal

chairs are prepared and all reinforcement bars are placed on them.

11.11 These blocks or spacers do not turn over when concrete is casted.

11.12 The thickness of concrete cover is according to the requirements of the drawings and

specifications.

11.13 And approve the placing of the reinforcement and form work condition before any

concrete is casted.

11.14 The reinforcement in structures are not welded unless permitted by the designer.

11.15 All reinforcement quality and work comply the standard technical specification.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

18

12. MORTAR

CHECK:

12.1 All mortar is if possible mixed in an approved mechanical batch miser. If not possible it

could be mixed by hand until its color and consistancy are uniform.

12.2 Lime for mortar is freshly burnt limestone. Lime shall be delivered to the site in large

lumps, slaked, run to putty and mature for not less than two weeks before use.

12.3 If hydraulic lime is used, it is stored in the same manner as described for cement.

12.4 Cement used in mortar is port land cement and of quality as described for concrete

works.

12.5 Sand for mortar is of quality as described for concrete works.

12.6 Water is of quality described for concrete works.

12.7 Cement mortar consists of cement and sand as specified. If not given in the

specification, check that cement mortar consists of one part cement to three parts of

sand (1:3) measured by volume.

12.8 Compo mortar consists of cement, lime and sand as specified. If not specified, check

that the compo mortar is composed of one part cement two parts of lime and nine parts

of sand (1:2:9) measured by volume.

12.9 Cement mortar is used within 30 minutes of the duration of cement.

13. STONE MASONARY WALL

CHECK:

13.1 Stone is of type given on specification.

13.2 The stone in hard, sound, free from cracks and decay and not weathered.

13.3 The stone is freshly quarried from an approved quarry.

13.4 The stone masonry execution is with specified mortar and with well finished joints.

13.5 All mortar for stone masonry bedding and jointing is 20mm thick.

13.6 Stone masonry during execution is kept free from solid and other kind of dirt.

13.7 Stone walling is carried up with no portion more than 1000mm above adjacent wall at

any one time.

13.8 The wall is in plumb within 3m.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

19

13.9 Sample panel of wall not less than 1m2 in area including joint pointing as specified is

prepared and approved.

13.10 The type size and pattern of laying is as detailed on drawing.

13.11 All stone masonry walling comply with the standard technical specification.

14. HOLLOW CONCRETE BLOCK WALL

CHECK:

14.1 The hollow concrete blocks are free from laminations, cracks and other defects that

would impair the proper setting, strength or permanence of the construction.

14.2 The hollow concrete blocks are well compacted, properly cured and uniform colour and

texture.

14.3 The hollow concrete blocks manufactured on the site above the quality of cement and

aggregate as described for concrete works.

14.4 All blocks are manufactured in an approved special hollow block machine and under

shed.

14.5 Before any manufacturing in big scale starts on the site, test samples are made, cured

and sent for testing and test results are approved by the designer.

14.6 For curing of hollow blocks, that they are kept moist, at least for seven days after

casting.

14.7 That the blocks are properly dried under shade for at least 14 days before they are used

for construction.

14.8 Damaged or blocks with defects in the walls are replaced with good ones at the

expenses of the contractor.

14.9 Hollow blocks and the walls are kept free from soil and other kind of dirt during

execution.

14.10 All joints vertical and horizontal are well filled with specified mortar.

14.11 Walling is carried up with no portion more than 1000mm. above adjacent wall at any

one time.

14.12 Partition walls are well bonded to elevations walls.

14.13 That the joints and the walls are in plumb within 3m.

14.14 If the wall in designated as load bearing by the designer and special care in taken for the

execution of the work.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

20

14.15 A minimum of 6 blocks per 1000 pcs. for site manufactured blocks are tested.

14.16 The thickness of the joints do not exceed 15mm.

14.17 The compo mortar is used only above ground level.

14.18 The drawings carefully before any wall construction if extra reinforcement or expansion

joints are prescribed.

14.19 The minimum compressive strength class A, class B and class C, hollow concrete

blocks in as follows according to the standard technical specification.

CLASS AVERAGE OF 6 BLOCKS INDIVIDUAL BLOCKS

Class A 48kg/cm2 38 kg/cm

2

Class B 35kg/cm2 32 kg/cm

2

Class C 20kg/cm2 18kg/cm

2

14.20 All hollow concrete block walling comply with the standard technical specification.

15. WALLS WITH BRICKS

CHECK:

15.1 Bricks are not dumped on site but stocked in regular tires as they are unloaded.

15.2 Bricks to be used for different situations are stocked separately on a clean place.

15.3 Bricks are soaked in water for a minimum period of one hour before use.

15.4 Sample panels of not less than 1m2 for each type of brick.

15.5 All brick works are laid in good English bond even and true to line plumb within 3m,

level and all joints accurately kept.

15.6 All joints vertical and horizontal are well filled with specified mortar.

15.7 The thickness of the joints do not exceed 10mm.

15.8 All bricks of the same dimensions are only used in the same wall.

15.9 Brick samples are taken at random from the load approved also manufacturers test

certificate submitted.

15.10 All brick walling comply with the standard technical specification.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

21

16. WOODEN WALLS

CHECK:

16.1 The quality and dimensions of wood are according to specifications and drawings.

16.2 All wood for wall are well seasoned, fee from major knots, worms, splits and bends.

16.3 All wood for construction are stored free from the ground and well protected against

rain.

16.4 All wood if specified are treated with anti-termite liquid.

16.5 Dimension, placing and number of nails in according to drawings. Unless indicated on

the drawing no wood structure shall be joined.

16.6 The wall is plumb and level.

17. PLASTER AND POINTING

CHECK:

17.1 The cement plaster and compo plaster quality mixture, thickness and type of surface are

according to the specification and drawing.

17.2 That cement plaster is used where water effect is expected such as in toilets, laundries

and external walls while compo-mortar is used in all cases unless otherwise specified.

17.3 Before any plaster is applied, the wall is thoroughly cleaned from dirt and dust.

17.4 all plaster in mixed in a mechanical mixer of approved type if possible.

17.5 The wall, depending on the material is kept wet for some time before any plaster

applied. It's not enough to sprinkle water just before plastering.

17.6 All pointing if prescribed in done with cement mortar.

17.7 All pointing in plumb and level.

17.8 All plastering and pointing comply with the standard technical specification.

18. STRUCTURAL STEEL WORK

CHECK:

18.1 The shape and size of structural steel members comply with the requirements of the

specification and the manufacturers standards.

18.2 Size location, elevation and plumbing of another bolts.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

22

18.3 Condition and capacity of welding equipment.

18.4 Conformity of electrodes to specifications and correct usage.

18.5 Production and assembly of steel in carried out in accordance with the detail drawings

and specifications.

18.6 Steel before and after fabrication is straight and free from twist or other damages.

18.7 Cutting is done by shearing, cropping, sawing or machine flame cutting.

18.8 Cutting by hand operated flame in approved.

18.9 Sheared or cropped edges are dressed to a neat machine work and are prepared for

welding finish.

18.10 Welded sections are inspected and approved prior to priming.

18.11 The maximum gap for butt welded section in less that 3mm.

18.12 Each weld in continuous, sound and without interruption and free of creaters.

18.13 Slag in taken away immediately after welding and the weld cleared with metal brush.

18.14 All ends of rectangular, square and circular sections (DHS, CHS) are sealed by welding

to prevent ingress of moisture.

18.15 The steel structure is securely bolted to plates, channels or angle cleates during erection.

18.16 Direct bolting to sides of steel hollow sections in not carried on.

18.17 Holes for fixing electrical fittings, partitions etc. … are correctly positioned.

18.18 All structural steel is protected from chemical solutions.

18.19 All structural steel ready to erect is prevented from water or dirt accumulated against

any of the surfaces.

18.20 All steel which will have concrete cast against them are clean and free from loose rust at

the time of concreting.

18.21 all structural steel work comply with the standard technical specification.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

23

19. PAVIOR (TILES PAVIOR)

CHECK:

19.1 Before any paving starts, the mass concrete is completely free from standing water.

19.2 Cement tiles conform with the standards.

19.3 In the mass concrete surface immediately before the bedding is laid, a slurry of cement

and water is brushed, unless specified.

19.4 The bedding in of cement mortar, one part cement to four parts sand (1:4), and the slump

in 2-5cm and over.

19.5 the bedding thickness is 2-3cm.

19.6 The tiles are gently knocked down into the bedding so the mortar will be forced up in the

joints approximately 5mm.

19.7 When the bedding is hard enough usually after one day the joints which shall be 2-4mm

wide are filled with cement mortar.

19.8 Expansion joints are executed as indicated on drawings.

19.9 The complete floor under construction is protected for the first 14 days and kept wet and

is protected against damage.

20. WALL TILES

CHECK:-

20.1 Wall tiles are soaked in clean water before laying and taken out just before use.

20.2 Tiles are bedded with straight joints in cement and sand (1:3) and grouted in white

cement.

20.3 The work when completed is cleaned properly before approval.

20.4 Only tiles free from defects are used for the construction.

21. P.V.C. TILES

CHECK:

21.1 P.V.C. tiles are laid on floor screeds with approved glue and in accordance with

manufacturer's instruction.

21.2 Only tiles free from defects are used for the construction.

21.3 Damaged tiles are replaced with good ones at the contractor's expense.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

24

22. ROOFING AND CLADDING

CHECK:

22.1 Asbestos cement sheets are free from visible defects.

22.2 The surface of asbestos cement sheet is of uniform texture and smooth on one side.

22.3 The edges of asbestos cement sheets are square, straight and clean.

22.4 Asbestos cement sheet unless otherwise specified is 6mm thick when used for roofing.

22.5 Asbestos cement accessories match the pitch of the sheets.

22.6 Galvanized plain and corrugated sheets comply the manufacturer's specifications.

22.7 Steel hock bolts and nuts are zinc coated, the size and use of which shall be as per

manufacturer's instruction.

22.8 Fixing of roofing and flashing is made fully water tight and performed to the standard of

best workmanship.

22.9 Chiseler diamond edges and convex bend nails made of mild steel round wires are used to

fix galvanized steel sheet roofing and flashing to timber members.

22.10 Steel hock bolts and nuts are used to fix galvanized steel sheets and asbestos roofing to

steel and wooden truss members and purlins.

22.11 Fixing holes are drilled in crown of corrugation of roofing sheets.

22.12 Holes are 5mm larger in diameter than bolts or screws.

22.13 Holes are 40mm far from edges of sheet.

22.14 Sheets are laid with laps not less than 150mm.

22.16 Upper laps of sheets are constructed away from prevailing wind.

22.17 No person other than workmen in roofing have access to roof area.

22.18 All roofing work comply with the standard technical specification.

23. GUTTERS AND DOWN PIPES

CHECK:

23.1 Gutters and down pipes are formed with the specified guage galvanized mild steel flat

sheet from suitable lengths and to shapes shown on the drawings.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

25

23.2 Gutter hangers and down pipe supports are 2.25mm anti-rust painted flat sheet spaced at 1

meter center maximum unless otherwise specified.

23.3 Joints of gutter are lapped 15cm and welded.

23.4 Jointer of gutter after welding treated with three coats of zinc paint.

24. CARPENTRY AND JOINERY

CHECK:

24.1 Timber for carpentry and joinery is as specified and of best quality.

24.2 Timber is reasonably straight grained and obtained from an approved sources.

24.3 And inspect the timber as it arrives, an timber not approved is removed forthwith.

24.4 Timber is open stacked for as long as possible before use.

24.5 Timber and assembled wood work are protected from rain and sun.

24.6 Timber and assembled wood work are stored in such away as to prevent attack by

termites, insects or decayed fungi.

24.7 Timber ready for use in free from live borer, beetle or other insect attack.

24.8 All measures to eradicate insect attack of timber are approved.

24.9 Timer in seasoned to moisture content of not more that 20% for Carpentary and 12% for

joinery.

24.10 All timber surface exposed by cutting are treated with three coats of approved

preservations.

24.11 All pressure impregnated timber is treated with preservative chemicals at a pressure of

not less than 10 atmospheres and in accordance with the chemical manufacturers

instruction.

24.12 Fixed joinery is completely protected from damage until the completion of the

construction.

24.13 Profile of sections is not modified from those shown on drawings without approval.

24.14 Right type of door is fixed in the right place and that the doors awing in accordance to the

drawings.

24.15 Door frames and window frames are fixed straight and in plumb.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

26

24.16 Hinges, locks, latches and handles are of approved type and properly fixed.

24.17 Window panels are of the right thickness and properly fixed.

24.18 All carpentry and joinery to comply with the standard technical specification.

25. CEILING

CHECK:

25.1 Material and dimensions are according to the specifications and the drawings.

25.2 Before any mounting, painting of parts in connection with the ceiling such as steel guides

and walls, is completed.

25.3 The ceiling in cleaned and well fixed when the work is completed.

26. PAINTING

CHECK:

26.1 The kind of paints in according to the specifications and designer's instructions.

26.2 The painting is done according to the manufacturer's instructions.

26.3 The paint is not diluted unless specified by the manufacturer.

26.4 All surface to be painted is clean from dust and dirt.

26.5 All surface to be painted is absolutely dry and free from defects before painting.

26.6 All brushes and tins used for painting are clean and free from old paint.

26.7 The room is closed until the paint dries.

26.8 All electrical appliances, iron and brass works are removed before painting and properly

re-fixed after painting.

27. GLAZING

CHECK:

27.1 Frames are fixed straight and in plumb.

27.2 The type and thickness of glass is according to the specifications and drawings.

27.3 The application and proper ness of putty.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

27

28. WATER WELL

CHECK:

28.1 The water well is dug according to the specifications and drawings, if possible dug during

the dry season.

28.2 If septic tanks, soak away pits and dry latrines are situated nearby and inform the designer

to change the position of the wall.

28.3 The water is tested and approved after the digging is completed.

28.4 The masonry work is not started before the test result is known and approved.

29. WATER SUPPLY LINES

CHECK:

29.1 The dimensions and types, tubes valves and water tower is according to the specifications

and drawings.

29.2 All valves, unless otherwise specified is buried in the ground to a minimum depth of

30cm.

29.3 All valves are placed according to the drawings.

29.4 Inspect and approve the supply line before any back filling starts.

30. PLUMBING AND SANITARY INSTALLATIONS

CHECK:

30.1 Dimensions and types of pipes, tubes, valves and sanitary ware is according to the

specification and drawings.

30.2 All pipes and tubes to be installed in the floor are placed in position.

30.3 All joints before mass concrete in east.

30.4 Pipes and tubes are placed in the board core with minimum 10cm covering layer of sand

or in channels of floors as indicated on the drawings.

30.5 All sanitary ware is properly fixed in its correct position.

30.6 All connection between sanitary ware and sewer system is done with the prescribed

syphon.

30.7 All exposed pipes and tubes are well cleaned and painted as specified.

30.8 All sanitary work comply with the standard technical specification.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

28

31. SEWER SYSTEM

CHECK:

31.1 Dimensions and types of pipes and inspection pits is according to the specifications and

the drawings.

31.2 The excavation measurements of the sewer lines is according to the drawings.

31.3 The excavation is done in straight lines between the manholes.

31.4 All trenches before pipes are laid.

31.5 Unless otherwise specified, the pipes are laid on a sand bed with a minimum thickness of

10cm and in an absolutely straight line with an even slope of minimum 1:100 and

covering soil layer is minimum 50cm.

31.6 The joining of concrete to pipes is always done with cement mortar, the joint completely

filled all around.

31.7 Joining of asbestos cement pipes is done according to the manufacturer's instruction.

31.8 Inspection pit is according to the drawing before back filling.

31.9 All pipes connected to the inspection pit come approximately on the same level and check

channel formed in concrete at the bottom of the pit.

31.10 Back fill soil is of good quality, free from stones and it is not top soil.

31.11 Back filling is in layers of minimum 20cm, if vibrating or roller machine is used the

thickness of the layer can be 40cm unless otherwise specified.

31.12 Each layer of back fill is well rammed and consolidated with the addition of water if

necessary.

31.13 The correct position of the water and sewer systems and prepare a sketch on the site plan

to send to the designer for preparing drawings showing their correct positions as built on

site.

31.14 Measure the correct lengths of all trenches, of all tubes and pipes.

32. SEPTIC TANK AND SOAK AWAY PIT

CHECK:

32.1 Dimension and type of septic tank and soak away pit is according to the specifications

and drawings.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

29

32.2 The position of septic tank and soak away pit if situated nearby water wells, and inform

the designer for the change of the positions.

32.3 Level of overflow pipes between different chambers and inlet and outlet pipes are

according to the drawings.

32.4 all plastering in and out, is with cement plaster with thickness and mixture according to

specifications and drawings.

32.5 All water proofing is done according to specifications and drawings.

33. ELECTRICAL INSTALLATIONS

CHECK:

33.1 The electrical installation is approved by EELPA or the designated professional.

33.2 Materials to be used for the installation strictly follow the specifications and the drawings.

33.3 The electrical subcontractor has a valid certificate issued by EELPA before he starts his

work and his foreman is competent.

33.4 The conduits are free from defects and cover the wires all the way.

33.5 All switches and outlets are properly fixed according to the drawings.

33.6 The connections of wires are always done in junction boxes.

33.7 All external cables are placed with a minimum 10cm depth in concrete or asbestos

cement pipes and 40cm depth in the ground, unless otherwise specified.

33.8 The excavation is in a straight line between the inspection pits.

33.9 The inspection pits are constructed every 30cm unless otherwise specified.

33.10 All trenches before pipes are laid.

33.11 The pipes are laid on a minimum 10cm thick sand bed unless otherwise specified.

33.12 The joining of asbestos cement pipes is done with cement mortar, the joint completely

filled around.

33.13 The joining of asbestos cement pipes is done according to the manufacturer's instructions.

33.14 The inspection pits, pipes and joints before back filling.

33.15 The back fill soil is of good quality, free from stones and it is not top soil.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

30

33.16 The back filling is in layers of minimum 20cm if vibrating or rolled machine is used the

thickness of the layer can be 40cm unless otherwise specified.

33.17 Each layer of back fill is well rammed and consolidated with the addition of water if

necessary.

33.18 All underground cable joining are done in special water-tight junction box approved by

EELPA or designated professional.

33.19 All junction boxes used are placed in the inspection pits.

33.20 Measure the correct lengths of all trenches and cables.

33.21 The correct position of external cables and pits and prepare a sketch on the site plan to

send to the designer for preparing drawings showing their correct positions as built on

site.

33.22 All electrical installation comply with the standard technical specification.

34. RETAINING WALLS

CHECK:

34.1 The trench to be free from loose soil, roots and pieces of wood before construction.

34.2 The depth and width of trench to correspond with the drawing.

34.3 All stones are of good and approved quality.

34.4 All stones and the wall are kept free from soil and other kind of dirt during execution.

34.5 No borrow pits are to be opened in the vicinity.

34.6 If expansion joints are executed as on the drawings.

34.7 The mix proportion of mortar.

34.8 All retaining wall construction comply with the standard technical specification.

35. SITE WORK

CHECK:

35.1 The clearing of buildings is up to 2 meters from elevation walls on all sides, and check

thin limit is approved by the designer.

35.2 The clearing for roads, footpaths and parking areas is up to 1 meter from their boundaries

and check this limit is approved by the designer.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

31

35.3 All roots are taken out within the building area, under roads footpaths and parking lots

and transported away from the site.

35.4 The place for the down trees and check they are within the building site.

35.5 All top soil is excavated separately.

35.6 And decide the place to pile up the excavated to soil and check it is 2 meters outside the

building perimeter.

35.7 And decide the place for the cart away which is not necessary for back filling or terracing.

35.8 All back filling and terracing is done in layers not exceeding 20cm and if vibrating or

roller machine is used the thickness must be 40cm.

35.9 Each layer of back filling and terracing is well rammed and consolidated.

35.10 Back filling and terracing is not with top soil.

35.11 All site work comply with the standard technical specification.

36. ROADS AND FOOTPATHS

CHECK:

36.1 Excavation for roads footpaths is executed to bottom of footpaths is executed to bottom

of hard core.

36.2 Back filling for roads and foot paths is done with non expansive selected material.

36.3 All back filling is done in layers not exceeding 20cm and if vibrating or roller machine is

used the thickness must be 40cm.

36.4 Each layer of back filling is well rammed and consolidated with addition of water if

necessary.

36.5 Before back filling starts the ground is free from top soil, grass, bushes, roots and pieces

of wood.

36.6 Stone for hard core is of approved quality.

36.7 All stones in the hard core are of approximately equal size.

36.8 The hard core is well rammed, consolidated and the top tightened with crushed stones or

gravel.

36.9 The thickness of hard core is not less than specified.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

32

36.10 The hard cores as well as the top surface is executed with a minimum slope of 1:100

towards the sides.

36.11 The top surface is executed with material on the specification or drawings.

37. DRAIN CHANNELS AND CULVERTS

CHECK:

37.1 Drain channels are according to the measurements on the drawings.

37.2 Drain channels to have a minimum slope of 1:200, unless otherwise specified.

37.3 Stone channels to be on a bed hard-core or well compacted gravel with joints and

pointing in cement mortar (1:3).

37.4 Channels of half-concrete pipes are on a well compacted layer of fine aggregate with a

thickness not less than 10cm.

37.5 Half-concrete pipes are laid in and joined with cement mortar (1:3).

37.6 Stone channels and culverts are constructed according to the drawings and specifications.

37.7 All pipes are laid so that each one is in contact with the bed throughout the length of its

38. FENCING AND GATE

CHECK:

38.1 The type of fence and gate are according to the specifications and drawings.

38.2 The foundations of fence and gate is according to the specifications and drawings.

39. PREPARATION OF PAYMENT CERTIFICATE

39.1 Payment certificate should be prepared on official formats.

39.2 Payment certificates should be prepared in sufficient copies as needed.

39.3 Payment certificates should be signed by:

a. the supervisor

b. consultant, if there is contract provision for such supervision

c. the contractor

d. the investor

39.4 The supervisor shall check payment against:

a. arithmetic error

b. contract prices

c. contract quantities

d. contract time

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

33

e. actual measurement sheets

f. variation orders

g. supplementary agreements

h. validity of performance bond

i. progress reports

40. INFORMATION ON CONSTRUCTION PROCEDURES

40.1 Check a site book is kept for any construction work and the following information is

included:

− dates on which excavation, concreting, stripping of form work, back filling, site work

has taken place.

− acceptance of materials an components

− results of tests and measurements

− type of cement and aggregate

− inspection and measurement reports of the positioning of reinforcement.

− important instruction received.

− description of any incidents.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

28

Table 8.5.3a Standard Mixes for Ordinary Structural Concrete per 50kg Bags of Cement

(ESCP 2 : Part 1: 1983)

Concrete

Nominal max. size of

Aggregate (mm)

40

20

14

10

Work Workability Medium High Medium High Medium High Medium High

Limits to slump that may be expected

(mm)

30-60

60-120

20-50

50-100

10-30

30-60

10-25

25-50

C5 Total Aggregate (kg)

Fine Aggregate (%)

Vol. of finished concrete (m3)

640

30-45

0.312

550

30-45

0.275

540

35-50

0.277

480

35-50

0.252

-

-

-

-

C15 Total Aggregate (kg)

Fine Aggregate (%)

Vol. of finished concrete (m3)

370

30-45

0.200

330

30-45

0.183

320

35-50

0.178

280

35-50

0.160

-

-

-

-

C20 Total Aggregate (kg)

Fine Aggregate (%)

Vol. of finished concrete (m3)

350

30-35

0.165

270

30-40

0.155

280

30-40

0.156

250

35-45

0.143

255

35-45

0.146

220

40-50

0.130

240

40-50

0.137

200

45-55

0.121

C25 Total Aggregate (kg)

Fine Aggregate (%)

Vol. of finished concrete (m3)

265

30-35

0.147

240

30-40

0.137

240

30-40

0.137

215

35-45

0.127

220

35-45

0.130

195

40-50

0.118

210

40-50

0.124

175

45-55

0.110

C30 Total Aggregate (kg)

Fine Aggregate (%)

Vol. of finished concrete (m3)

235

30-35

0.134

215

30-40

0.127

210

30-40

0.124

190

35-45

0.115

195

35-45

0.115

170

40-50

0.106

180

40-50

0.109

150

45-55

0.097

NOTE: To get volumes of fine and coarse aggregates as follows:

1. Calculate the weights of fine and coarse aggregates by using percentages within the given ranges.

2. Calculate the volume of fine aggregate in it, by dividing the weight in kg.

3. Calculate the volume of coarse aggregates in it by dividing the weight in kg. By 1.25.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

29

Table 8.5.3b Standard Concrete Per 50kg. Bag of Cement

(ESCP 2 : Part 1: 1983)

Nominal Max. Size of Agg. (mm) 40 20

Concrete Work Ability Medium High Medium High

Grade Limits to Slump that may be expected (mm) 30-60 60-100 20-50 50-100

C5 Sand

Coarse Agg.

Water (Litres)

5A

7A

48

6C

7C

48

6C

7C

48

4A

5

48

C15 Sand

Coarse Agg.

Water (Litres)

3A

4A

30

3B

4B

30

3B

4B

30

2B

4B

30

C20 Sand

Coarse Agg.

Water (Litres)

3C

4C

25

2A

3A

25

2B

4b

25

2C

4C

25

C25 Sand

Coarse Agg.

Water (Litres)

2A

3A

23

2B

3B

23

2B

3B

23

2C

3C

23

C50 Sand

Coarse Agg.

Water (Litres)

2B

3B

20

2C

3C

20

2C

3C

20

2B

2B

20

Standard Box Sizes

(Sizes in cms)

A - 40x50x20

B - 40x50x18

C - 40x50x16

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

30

MINISTRY OF WORKS AND URBAN DEVELOPMENT

HANDING OVER THE CONSTRUCTION SITE

This _________________________________ date of ___________ 19____ the work for the

construction of the _______________________________________________ has been officially

handed over to the contractor:

MR/ATO ____________________________________________________________________

The Contractor, therefore, acknowledges the taking over of the site and immediately the work with

all its explanation clearly defined in the specification and drawings (sketches).

The Contractor, hereinafter, shall be responsible for the damages that occur as a result of his fault,

carelessness or negligence in connection with untimely commencement of the work.

The Contractor, in addition, acknowledges the completion of the said work shall count as from the

date mentioned above and comply with the terms and conditions of the Contract to the Contract to

the satisfaction of the Client.

IN WITNESS HEREOF THIS DOCUMENT HAS BEEN SIGNED BY ALL PRESENCE IN SIX

COPIES OF WHICH THE CLIENT HAS ONE, THE SUPERVISOR ONE, THE

CONTRACTOR ONE, AND THE BUILDING DESIGN ENTERPRISE THREE.

_____________________________ ___________________________

FOR THE CLIENT (EMPLOYER) THE CONTRACTOR

WITNESS

1. _____________________ 1. ___________________

2. _____________________ 2. ___________________

3. _____________________ 3. ___________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

31

MINISTRY OF WORKS AND URBAN DEVELOPMENT

ACQUISITION OF DOCUMENTS

PROJECT : ___________________________________________________

SITE : ___________________________________________________

EMPLOYER : ___________________________________________________

CONTRACTOR : ___________________________________________________

SUPERVISOR : ___________________________________________________

This is to acknowledge that I have received the following set of documents concerning the

project.

1. CONTRACT DOCUMENT NO. ________________________________________

2. ARCHITECT DRAWINGS NO. ________________________________________

3. STRUCTURAL DRAWINGS NO. ________________________________________

4. ELECTRICAL DRAWINGS NO. ________________________________________

5. SANITARY DRAWINGS NO. _________________________________________

6. BILL OF QUANTITIES _________________________________________

7. OTHERS NO. _________________________________________

DOCUMENT HANDED OVER BY

_________________________________

DOCUMENT RECEIVED BY

________________________________

DATE: ______________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

32

MINISTRY OF WORKS AND URBAN DEVELOPMENT

REQUISITION FOR MATERIAL TESTING

PROJECT : ____________________________________________________

SITE : ____________________________________________________

EMPLOYER : ____________________________________________________

CONTRACTOR : ____________________________________________________

SUPERVISOR : ____________________________________________________

REQUIRED TEST

TEST REQUESTED BY _____________________________________________________

SUPERVISOR

APPROVED BY _____________________________________________________

CONSULTANT OR DESIGNER

DATE _____________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

33

MINISTRY OF WORKS AND URBAN DEVELOPMENT

EVALUATION OF TEST RESULT

Contract No. ________________

PROJECT : ___________________________________________________

SITE : ___________________________________________________

EMPLOYER : ___________________________________________________

CONTRACTOR : ___________________________________________________

SUPERVISOR : ___________________________________________________

TESTING LAB ________________________________ TEST NO. ___________________

DATE OF TESTING __________________________________________________________

KIND OF MATERIAL TESTED _________________________________________________

____________________________________________________________________________

SPECIFIED QUALITY ________________________________________________________

____________________________________________________________________________

TEST RESULT _______________________________________________________________

____________________________________________________________________________

RECOMMENDATION OF DESIGNER ___________________________________________

____________________________________________________________________________

____________________________________________________________________________

MATERIAL ACCEPTED MATERIAL REJECTED

APPROVED BY : _____________________________________________

CONSULTANT OR DESIGNER

C.C To Site Supervisor

To Contractor

To Employer

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

34

MINISTRY OF WORKS AND URBAN DEVELOPMENT

SOIL IDENTIFICATION AND ACCEPTANCE OF EXCAVATED

FOUNDATION DEPTHS

PROJECT : _____________________________________________________

SITE : _____________________________________________________

EMPLOYER : _____________________________________________________

CONTRACTOR : _____________________________________________________

SUPERVISOR : _____________________________________________________

SOIL TEST REPORT NO. ___________________________ DATE _____________________

Specified Soil

Type Test

Report

Actual Soil

Condition

Specified Depth in

Test Report

Recommended

Foundation

Depth

Remark

RECOMMENDATION OF

FOUNDATION ENGINEER ___________________________________________________

____________________________________________________________________________

INSTRUCTION PASSED TO

THE CONTRACTOR ____________________________________________________

_____________________________________________________________________________

ACKNOWLEDGEMENT OF SUPERVISOR _______________________________________

_____________________________________________________________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

35

MINISTRY OF WORKS AND URBAN DEVELOPMENT

SITE DIARY

Report No. _____ Date __________

Project : ____________________________________________________________

Site : ____________________________________________________________

Employer : ____________________________________________________________

Contractor : ____________________________________________________________

Consultant : ____________________________________________________________

Site Supervisor : ____________________________________________________________

1. Weather Conditions : Fine _________ Good ________ Bad _______ Lost Hrs. _______

2. Staff on Site :

Project Eng. ________________ Secretary ______________ Driver ____________ Civ. Eng. _______________ Clerk _________________ Guard ____________ Bld. Eng. _______________ Purchaser ______________ Messenger _________ Technician _______________ Cashier ________________ Cleaner ___________ Eng. Aide _______________ Dresser ________________ Others ____________

3. Labour Force Gen. Forman _______________ Mason ________________ Plasterer __________ Gen. Operator _______________ Carpenter ______________ Painter __________

Forman ____________________ Barbender ______________ Chiselled __________ Operator ___________________ Plumber ________________ Glazier ___________ Mechanic __________________ Electrician ______________ Labourer _________ Welder ____________________ Helper _________________ Others ____________

4. Work in progress: __________________________________________________________ ________________________________________________________________________

5. Materials on Site : _________________________________________________________ ________________________________________________________________________

6. Equipment on Site : ________________________________________________________ ________________________________________________________________________ 7. Given Instruction __________________________________________________________

_________________________________________________________________________ _________________________________________________________________________

8. Difficulties and Shortages: __________________________________________________ _________________________________________________________________________

_________________________________________________________________________

9. Remarks: ________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

36

MINISTRY OF WORKS AND URBAN DEVELOPMENT

INSPECTION AND PROGRESS REPORT

Monthly Report No. ___________________

Month ______________________________

Date _______________________________

Cont. No. ___________________________

Project Title : __________________________________

Location : __________________________________ Region ___________________

Employer : __________________________________

Contractor : __________________________________

Consultant : __________________________________

1. Date of signing of contract ____________________________ Contract Time _____________________

Commencement Date _________________________________ Completion Date ___________________

Contract amount Birr _________________________________ Elapsed Time ______________________

Amount earned Birr __________________________________

2. Stage Construction : Variation and values on certificates.

No.

Type of Work

Value Out

of Total

Variation

Total

Executed

Value of Work

Executed

Value of Certificate

Work Order No. Value of

(Total)

in % This

Month

To Date This Month To Date

1 Excavation & Earth works

2 Stone Masonary Works

3 Concrete in foundation

4 Concrete in superstruc.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

37

No.

Type of Work

Value Out

of Total

Variation

Total

Executed

Value of Work

Executed

Value of Certificate

Work Order No. Value of

(Total)

in % This

Month

To Date This Month To Date

5 Wall

6 Roofing

7 Metal works

8 Carpentry & Joinery

9 Plastering & Screeding

10 Flooring & Screeding

11 Glazing

12 Painting

13 Sanitary Installation

14 Electrical Installation

15 Site Work

16 Others

REMARK: _________________________________________________________________________________________________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

38

3. Difficulties encountered during the month under review:

Major Difficulties By Type Yes/No

Material shortage

Equipment shortage

Cash shortage

Manpower shortage

Weather condition

Design

Drawing

Supervision

Others

If yes, define type of Material, Equipment, also identify source of cash shortage and profession of

manpower.

4. Instruction given during the month under review.

Instruction Date Reference

Design change

Quantity variation

Suspension

Material change

Rectification

Others

REMARKS: ___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

39

5. Evaluations (Mark: Poor, Fair, Good, Excellent)

a) Quality of work _____________________________

b) Quality of materials __________________________

c) Performance

− Progress ____________________________________________________

− Delivery of materials __________________________________________

− Mobilization of manpower ______________________________________

− Equipment availability _________________________________________

REMARKS: _____________________________________________________________

_____________________________________________________________

_____________________________________________________________

_____________________________________________________________

6. Variation Approved (State types and quantities)

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

7. Claims filled (Reasons and duration)

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

8. Status of Certifications approved

Month % Executed % Time Elapsed

Previous Month

Current Month

Difference

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

40

General Remarks and Actions to be taken:

_____________________________ ___________________________

Supervisor Supervision Office

_______ ______________________ ___________________________

Date Date

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

41

MINISTRY OF WORKS AND URBAN DEVELOPMENT

Quarterly Construction Inspection and Progress Report

Monthly Report No. ________________

Month ______up to Month __________

Date _____________________________

Cont. No. _________________________

Project Title : _________________________________

Location : _________________________________ Region : ____________________

Employer : _________________________________

Contractor : _________________________________

Consultant : _________________________________

1. Date of signing of contract __________________ Contract Time _______________

Commencement Date ______________________ Completion Date _____________

Contract amount Birr ______________________ Elapsed Time ________________

2. Stage of construction: Variation and values of certificates.

No.

Type of Work

Value Out

of Total

Variation

Total

Executed

Value of Work Executed

Value of Certificate

Work Order No. Value of

(Total)

in % This Month To Date This Month To Date

1 Excavation & Earth works

2 Stone Masonary Works

3 Concrete in foundation

4 Concrete in super structure

5 Wall

6 Roofing

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

42

No.

Type of Work

Value Out

of Total

Variation

Total

Executed

Value of Work Executed

Value of Certificate

Work Order No. Value of

(Total)

in % This Month To Date This Month To Date

7 Metal Works

8 Carpentary & Joinery

9 Plastering & Pointing

10 Flooring & Screeding

11 Glazing

12 Painting

13 Sanitary Installation

14 Electrical Installation

15 Site work

16 Others

REMARKS:____________________________________________________________________________________________________________

____________________________________________________________________________________________________________

____________________________________________________________________________________________________________

____________________________________________________________________________________________________________

____________________________________________________________________________________________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

3. Difficulties encountered during the month under review:

Major Difficulties By Type Yes/No

Material shortage

Equipment shortage

Cash shortage

Manpower shortage

Weather condition

Design

Drawing

Supervision

Others

If yes, define type of Material, Equipment, also identify source of cash shortage and profession

of manpower.

4. Instruction given during the month under review.

Instruction Date Reference

Design change

Quantity variation

Suspension

Material change

Rectification

Others

REMARKS: ________________________________________________________________

________________________________________________________________

________________________________________________________________

________________________________________________________________

________________________________________________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

44

44

5. Evaluations (Mark: Poor, Fair, Good, Excellent)

a) Quality of work _____________________________

b) Quality of materials __________________________

c) Performance

− Progress ___________________________________________

− Delivery of materials _________________________________

− Mobilization of manpower _____________________________

− Equipment availability ________________________________

REMARKS: ______________________________________________________

_______________________________________________________

_______________________________________________________

6. Variation Approved (State types and quantities)

_______________________________________________________________

_______________________________________________________________

_______________________________________________________________

______________________________________________________________

7. Claims filled (Reasons and duration)

_______________________________________________________________

_______________________________________________________________

_______________________________________________________________

8. Status of Certifications approved

Month % Executed % Time Elapsed

Previous Month

Current Month

Difference

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

45

45

General Remarks and Actions to be taken

________________________ _______________________

Supervisor Supervision Office

___________________________ ________________________

Date Date

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

46

46

MINISTRY OF WORKS AND URBAN DEVELOPMENT

WORK ORDER

Project ___________________________________________________________

Employer ________________________________________________________

Contractor ________________________________________________________

Consultant Or Designer ______________________________________________

Work Order No. __________

Date ____________________

I, We ______________________________________________________________

___________________________________________________________________

have recommended and instructed the following.

____________________________________________

_____________________________________________

_____________________________________________

_____________________________________________ SKETCH

_____________________________________________ (Sketched and enclosed

_____________________________________________ drawings should be deta-

_____________________________________________ iled enough to work out

_____________________________________________ quantities.)

_____________________________________________

_____________________________________________

_____________________________________________

_____________________________________________

______________________

Consultant or designer

_______________________ _______________________

Contractor Site Supervisor

C.C:

Employer

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

47

47

PAYMENT CERTIFICATE ON EXCEL

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

48

48

MINISTRY OF WORKS AND URBAN DEVELOPMENT

Site Hand over Inspection Certificate

Certificate No. 001

Project : ____________________ Location : __________________

Employer : ____________________ Contract No. ________________

Contractor: ____________________

Consultant: ____________________

1. Site - Surface Soil _____________________

- Surface water _____________________ - Surface slope _____________________ - Adjacent construction _____________________ - Accessibility _____________________

2. Obstruction - Trees and bushes _____________________ - water supply lines _____________________ - Sewer/drainage lines _____________________ - Electricity lines _____________________ – Telephone lines _____________________ – Road/railway lines _____________________ – Over ground structures _____________________ – Under ground structures _____________________ – Others _____________________ 3. References : – Bench marks/levels _____________________ – Corner stones _____________________ – Boarder lines _____________________ – Water supply connection points _____________________ – Electricity connection points _____________________ – Sewer/drainage connection points _____________________ 4. Additional Items/Comments: Following an inspection of the site as per the above listed items the

contractor is here by advised to take over the site and proceed with the subsequent

Mobilization and site preparation works.

Supervisor : Name__________________ Contractor : Name_________________

Sig. __________________ Sig._________________

Date __________________ Date_________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

49

49

MINISTRY OF WORKS & URBAN DEVELOPMENT

Site Preparation Inspection Certificate – For Item Location __________________

Certificate No. 002

Project : ________________ Location :_________________

Employer : ________________ Contract No. _______________

Contractor: ________________

Consultant: ________________ 1. Layout: – Buildings : ________________________ – Sewer lines ________________________ – Area to be cleared off : ________________________ – Others: ________________________ 2. Levels – Reference Bench mark(s) : ________________________ – Bottom of Basement Floor(s) : ________________________ – Bottom of Ground Floor(s) : ________________________ – Site Works ________________________ – Other cleared off area : ________________________ 3. Additional Items/Comments : Following an inspection of the layout and levels of all buildings, site works,

etc. as per the above listed items permission to proceed with the subsequent

Excavation/Earth works is hereby Granted/Refused to the contractor.

Supervisor : Name ___________________ Contractor : Name _________________

Sig. ___________________ Sig. _________________

Date ___________________ Date _________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

50

50

MINISTRY OF WORKS & URBAN DEVELOPMENT Foundation Excavation Inspection Certificate – For Item Location __________ Certificate No. 003

Project : _________________ Location : __________________

Employer : _________________ Contract No. ________________

Contractor: _________________

Consultant: _________________ 1. Foundation Layout ____________________ 2. Width of Excavation ____________________ 3. Depth of Excavation ____________________ 4. Method of Excavation ____________________ 5. Type of Excavation material (s) compared to soil report ____________________ 6. Foundation levels ____________________ 7. Type of soil at foundation level ____________________ 8. Foundation Pits & Trenches Free from – Ground water ____________________ – Roots and bushes ____________________ – Backfill or made ground ____________________ 9. Sides of Pits & Trenches – Safe from damage ____________________ – Protected with sheeting, strutting & shoring ____________________

10. Additional Items/Comments.

Following an inspection of the layout, width, depth and levels of Foundation

Excavations as per the above listed items permission to proceed with the subsequent

foundation works is hereby Granted/Refused to the contractor.

Supervisor : Name ________________ Contractor : Name ___________________

Sig. ________________ Sig. ___________________

Date ________________ Date ___________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

51

51

MINISTRY OF WORKS & URBAN DEVELOPMENT Earthworks Inspection Certificate – For Item Location _________________ Certificate No. 004

Project :___________________ Location : __________________

Employer :___________________ Contract No._________________

Contractor:___________________

Consultant:___________________ 1. Excavation :- – Location of Excavation ____________________________ – Method of Excavation ____________________________ – Type of Excavated material (s): Top soil, roots, ____________________________ – Thickness of Excavated materials: ____________________________ – Slopes & Levels of Excavated Surfaces ____________________________ – Necessary Temporary drains provided : ____________________________ – No Damage to adjacent areas ____________________________ 2. Placement of Excavated Materials :- – Top soil, roots & others to be carted away ____________________________ – Materials used for backfilling/terracing ____________________________ 3. Filling :- – Cleanliness of areas to filled ___________________________ – Quality of fill material (s) ___________________________ – Thickness of layers ___________________________ – Type & weight of rollers ___________________________ 4. Degree of Compaction :- – Optimum moisture content __________________________ – Maximum Dry Density __________________________ – Field Dry Density __________________________ – Comparison of Degree of Compaction __________________________ – Specified No. of passes of rollers __________________________ – Correctness of Compaction __________________________ 5. Protection of Filled areas from Vehicles prior to placement of upper pavement layer __________________________ 6. Additional Items/Comments Following an inspection of the quality of Earthworks as per the above listed items permission to proceed with the subsequent construction/ _____________________/ work is hereby Granted/Refused to the Contractor. Supervisor: Name ______________________ Contractor : Name ____________________ Sig. ______________________ Sig. ____________________ Date ______________________ Date ____________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

52

52

MINISTRY OF WORKS & URBAN DEVELOPMENT

Material Quality Evaluation Certificate – For Item Location _______________ Certificate No. 005

Project : ______________________ Location : _____________________

Employer :______________________ Contract No. ___________________

Contractor:______________________

Consultant:______________________

1. Testing Laboratory _____________________________ 2. Test No. _____________________________ 3. Date of Testing _____________________________ 4. Kind of Material Tested _____________________________ 5. Required Tests _____________________________ _____________________________ _____________________________

6. Required/specified qualities _____________________________ _____________________________

7. Test results _____________________________ _____________________________ _____________________________

8. Recommendation of supervisor : Material Accepted / Rejected

9. Additional Items/Comments

Following an evaluation of the submitted ____________ test results as per the

above listed items permission to use the material is hereby Granted/Refused to the

contractor.

Supervisor: Name _________________ Approved by : Name _________________

Sig. _________________ Sig. _________________

Date _________________ Date _________________

Acknowledged by Contractor : Name _________________

Sig. _________________

Date _________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

53

53

MINISTRY OF WORKS & URBAN DEVELOPMENT Concrete Work Inspection Certificate – For Item Location : ________________ Certificate No. 006

Project : _______________________ Location : _____________________

Employer : _____________________ Contract No. ___________________

Contractor: _____________________

Consultant: _____________________ 1. Quality & Age of Cement ____________________ 2. Quality of Sand/Fine Aggregate ____________________ 3. Quality of Coarse Aggregate ____________________ 4. Quality of Water ____________________ 5. Type of Mixing – Hand Mixing ____________________ – Mechanical Mixing ____________________ – Mechanical Batch Mixing ____________________ 6. Approved Concrete mix : Proportion of Cement : : Sand : Coarse Aggregate ____________________ – Water Cement ____________________ – Workability/Slump ____________________ – Flexural Strength ____________________ 7. Concrete Test Cubes – Required/Not Required ____________________ 8. Concrete Placement – Pouring Height ____________________ – No Segregation ____________________ 9. Concrete Vibration – Not under/over Vibrated ____________________

10. Construction Joints – Location Approved ____________________ – Roughened ____________________ – Vandexed ____________________ – Cleaned & Free from Water ____________________

11. Form Work – Adequately Braced ____________________ – Grout-tight ____________________ – Correct dimension & levels ____________________ – Cleaned & Oiled ____________________

12. Steel Reinforcement – Correct Grade ____________________ – Correct Sizes ____________________ – Correct Places ____________________ – Tolerance ____________________ – Concrete Cover/Clearance ____________________ – Correctly bent ____________________ – Lap Lengths ____________________ – Clean Steel ____________________ – Stability of fixed Steel ____________________ – Correct Welds ____________________ – Starters Location ____________________

13. Props ____________________ 14. Built in Items ____________________ 15. Additional Items/Comments ____________________ Following an inspection of the quality of concrete work as per the above listed items permission to pout concrete is hereby Granted/Refused to the Contractor. Supervisor: Name ___________________ Contractor : Name ____________________ Sig. ___________________ Sig. ____________________ Date ___________________ Date ____________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

54

54

MINISTRY OF WORKS & URBAN DEVELOPMENT

Masonry work Inspection Certificate – For Item Location ______________ Certificate No. 007

Project : _____________________ Location : __________________

Employer : _____________________ Contract No. ________________

Contractor: _____________________

Consultant: _____________________

1. Type of Masonry (Stone / HCB / Brick) ____________________________________

2. Hardness, Soundness & Size of Stone ____________________________________

3. Manufacturing & Curing of H . C . B . ____________________________________

4. Cleanliness of Masonry _________________________________________________

5. Storing of H . C . B . & Bricks __________________________________________

6. Strength of H . C . B . & Bricks________________________________________

7. Quality of Mortar Ingredients / Cement, Lime, Sand, Water/ __________________

_________________________________________________________________

8. Mix proportion of Mortar _______________________________________________

9. Upper/Lower levels of wall ______________________________________________

10. Uprightness/Straightness of wall surfaces __________________________________

11. Correctness of wall corner angles _________________________________________

12. Masonry bedding/Jointing thickness _______________________________________

13. Quality of Joint pointing ________________________________________________

14. Type, size and pattern of masonry laying ___________________________________

15. Additional Items/Comments

Following an inspection of the quality of Masonry Work as per the above listed

items permission to proceed with the subsequent construction /_________/work

is hereby Granted/Refused to the Contractor.

Supervisor : Name __________________ Contractor : Name __________________

Sig. __________________ Sig. __________________

Date __________________ Date __________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

55

55

MINISTRY OF WORKS & URBAN DEVELOPMENT

Structural Steel Work Inspection Certificate – For Item Location _______________

Certificate No. 008

Project : _______________________ Location : ______________________

Employer : _______________________ Contract No. _____________________

Contractor: _______________________

Consultant: _______________________

1. Component _______________________________ 2. Steel Members – Quality _______________________________

– Shape/Size _______________________________ – Straightness _______________________________ – Free from :- : Twist _______________________________ : Dust/Dirt/Water _______________________________ : Loose Rust _______________________________ : Other Damages _______________________________

3. Quality/Size of – Plates _______________________________ – Bolts/Nuts _______________________________ – Electrodes _______________________________

4. Shape/Pattern of Steel Work _______________________________ 5. Condition/Capacity of welding equipment _______________________________ 6. Weld – Type (Fillet, Butt) _______________________________

– Run continuous _______________________________ – Sound _______________________________ – No porosity _______________________________ – Correct Finishing _______________________________ – Slag Chipped _______________________________ – Seal complete _______________________________

7. Anchor Bolts – Correct Location _______________________________ – " Elevation _______________________________ – " Plumbing _______________________________

8. Position, Size of Holes for: – Electrical Fittings _______________________________ – Partition _______________________________ – Others _______________________________

9. Erection – Correctly slung _______________________________ – " Lifted _______________________________ – " Positioned _______________________________ – " Bolted/Welded _______________________________

10. Painting – Rust Removed _______________________________ – Primed _______________________________ – No. of Coats Applied _______________________________

11. Additional Items / Comments :

Following an inspection of the quality of steel work as per the above listed items permission to proceed with the subsequent construction/ ____________________/work is Granted/Refused to the Contractor.

Supervisor: Name _____________________ Contractor : Name _________________ Sig. _____________________ sig. __________________ Date _____________________ Date __________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

56

56

MINISTRY OF WORKS & URBAN DEVELOPMENT

Structural timber work Inspection Certificate – For Item Location _______ Certificate No. 009

Project : _____________________ Location :___________

Employer : _____________________ Contract No. ________

Contractor: _____________________

Consultant: _____________________

1. Component ________________________ 2. Timber Members: – Quality ________________________ – Shape/Size ________________________ – Free from : Decay ________________________ : Insects attack ________________________ : Other damages ________________________ 3. Type Quality of Timber Treatment ________________________ 4. Storage protection of Timber ________________________ 5. Quality / Size of – Nail ________________________ – Bolts/Nuts ________________________ – Glue ________________________ – Other joinery ________________________ 6. Shape/Pattern of Timber work ________________________ 7. Quality of Fabrication ________________________ 8. Quality/location of Joinery ________________________ 9. Quality of Erection ________________________

10. Straightness/Deflection of Timber work ________________________ 11. Additional Items/Comments: ________________________

following an inspection of the quality of Timber work as per the above listed

items permission to proceed with the subsequent construction/ ______/ work is

Granted/Refused to the Contractor.

Supervisor : Name ___________________ Contractor : Name _________________

Sig. ___________________ Sig. _________________

Date ___________________ Date _________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

57

57

MINISTRY OF WORKS & URBAN DEVELOPMENT

Carpentry & Joinery work Inspection Certificate – For Item Location ___________

Certificate No. 0010

Project : ________________________ Location : _____________

Employer : ________________________ Contract No. ___________

Contractor: ________________________

Consultant: ________________________

1. Ceiling Work

– Quality/Size of ceiling Material ______________________________ – Fixing of ceiling material ______________________________ – Type, colour, quality of ceiling painting ______________________________ – Quality, procedure of ceiling painting ______________________________ – Cleanliness of ceiling ______________________________

2. Doors & Windows – Location of Door/Windows ______________________________ – Quality of Door/Windows materials ______________________________ – Type of Doors/Windows ______________________________ – Direction of Door/Window swings ______________________________ – Straightness & plumbing of Door/Window frames ______________________________ – Quality/fixture of Door & Windows : Hinges ______________________________ : Locks ______________________________ : Latches ______________________________ : Handles ______________________________ – Protection of Fixed Joinery from damage ______________________________

3. Additional Items/Comments

Following an inspection of the quality of carpentry, Joinery & Glazing work as

per the above listed items permission to proceed with the subsequent construction

/____________/ work is Granted/refused to the contractor.

Supervisor : Name ___________________ Contractor : Name _______________ Sig. ___________________ Sig. _______________ Date ___________________ Date _______________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

58

58

MINISTRY OF WORKS & URBAN DEVELOPMENT

Roofing & Cladding Work Inspection Certificate – For Item Location ________

Certificate No. 0011

Project : ______________________ Location : _________________

Employer : ______________________ Contract No. _______________

Contractor: ______________________

Consultant: ______________________

1. Roofing work

– Type/Quality of roof sheet _________________________ – Thickness of roof sheet _________________________ – Size/coating of steel hook bolts/nuts _________________________ – Lapping of sheets : End laps length _________________________ : Side laps length _________________________ : Direction _________________________ – Quality of roof fixing/flashing _________________________ 2. Gutters & Down Pipes :

– Quality, Size, thickness, coating of : Gutter __________________________ : Down pipe __________________________ – Quality, Size, thickness, spacing coating of : Gutter hangers __________________________ : Down pipe supports __________________________ – Lapping of Down pipes __________________________ – Quality coating of Gutter joints welding __________________________ 3. Additional Items/Comment :

Following an inspection of the quality of Roofing and cladding work as per the

above listed items permission to proceed with the subsequent construction

/_______________/ work is Granted/Refused to the Contractor.

Supervisor: Name ________________ Contractor : Name _________________

Sig. ________________ Sig. _________________

Date ________________ Date _________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

59

59

MINISTRY OF WORKS & URBAN DEVELOPMENT

Finishing work Inspection Certificate – For Item Location ______________ Certificate No. 0012

Project : __________________ Location: ________________

Employer : __________________ Contract No. _____________

Contractor: __________________

Consultant: __________________

1. Plastering Work

– Location of plastering ________________________ – Quality of plaster: : Material (cement, lime, sand, water) ________________________ : Mix proportion ________________________ – Type of Mechanical Mixer used ________________________ – Elapsed time of plaster paste ________________________ – Cleanliness of wall ________________________ – Wetting of wall prior to plastering ________________________ – Thickness of plaster ________________________ – Plumbing & levering of plaster ________________________

2. Wall Tiling Work – Location of Tiling ________________________ – Readiness of Wall surface ________________________ – Quality of Tile bedding : : Material (cement, sand, water) ________________________ : Mix proportion ________________________ – Quality of Tile ________________________ – Soaking of Tile before laying ________________________ – Straightness of Tile Joints ________________________ – Grouting of Tile in white cement ________________________ – Cleanliness of Wall Tile ________________________

3. Floor Tile Work

– Location of Tiling ________________________ – Readiness of concrete slab surface ________________________ – Quality of Tile bedding : Material (cement, sand, water) ________________________ : Mix proportion ________________________ – Quality of Glue for P. V. C. Tile ________________________ – Quality of Tile ________________________ – Straightness of Tile Joints ________________________ – Setting/wetting Time of Floor Tile ________________________ – Cleanliness of Floor Tile ________________________

4. Glazing work – Quality & thickness of glass panes _________________________ – Quality & proper application of Putty _________________________ – Readiness of frame _________________________ – Cleanliness of glass _________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

60

60

– Quality of window panels fixing _________________________ 5. Painting work – Kind & Quality of paint ________________________ – Cleanliness of wall & brushes prior to painting ________________________ – Removal of Electrical Appliances prior to painting ________________________ – Number of coats applied ________________________ – Drying of painted walls & ceilings ________________________ 6. Additional Items/Comments:

Following an inspection of the quality of Finishing work as per the above listed items

permission to proceed with the subsequent construction/_____________________/ work

is Grant/ Refused to the Contractor.

Supervisor: Name _____________________ Contractor: Name _________________

Sig. _____________________ Sig. _________________

Date _____________________ Date _________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

61

61

MINISTRY OF WORKS & URBAN DEVELOPMENT

Site woks Inspection Certificate – For Item Location ___________________ Certificate No. 0013

Project : __________________ Location: ____________

Employer :__________________ Contract No. __________

Contractor: __________________

Consultant: __________________

1. Paved Areas (Roads, parking lots, Foot paths) – Location of Excavation ______________________ – Slopes and Levels of Excavation Surfaces ______________________ – Excavation surface free from Top soil Roots and Loose or Softened soil. ______________________ – Quality and Degree of Compaction of Fill Material ______________________ – Quality and Size of Hard core stone material ______________________ – Thickness, placing, ramming and blinding of Hard core layer ______________________ – Quality, thickness and degree of compaction of: – sub base layer ______________________ – base course layer ______________________ – surface course layer ______________________ – Slopes and Levels or Tope surface layer ______________________

2. Drain Channels and Culverts – Location of Channels & Culverts ____________________ – Sizes, Levels & Slopes of Channels And Culverts ____________________ – Type and Quality of Channel's Lining ____________________ – Type, Thickness & Compation of Channels Lining – Bedding ____________________ – Jointing & Pointing of Channel's Lining ____________________ – Quality of Mortar ingredients (cement, sand, water) ____________________ – Mix proportion of Mortar ____________________

3. Retaining Wall – Position, Width and Depth of Foundation Trench ____________________ – Cleanliness of Trench Bottom (roots, loose soil, etc.) ____________________ – Type, Hardness, Soundness, Size and Surface Cleanliness of Stone ____________________ – Quality of Mortar ingredients (cement, sand, water) ____________________ – Mix proportion of Mortar ____________________ – Location and construction of Weep Holes ____________________ – Location & construction of Expansion Joints ____________________ – Correctness of Batter slope ____________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

62

62

4. Fencing & Gate – Locating of Fencing & Gate _____________________ – Width & Depth of Fence & Gate Foundation Trench/pit _____________________ – Cleanliness of Trench or Pit Bottom _____________________ – Quality of Fence & Gate Materials (stone, HCB, Steel, etc.) _____________________ – Quality of Mortar, if used (ingredients, mix proportion) _____________________ – Quality of Concrete if used (ingredients, mix proportion, strength, work ability) _____________________ – Quality of Foundation works _____________________ – Quality of Work above ground level _____________________ 5. Additional Items/Comments Following an inspection of the site works as per the above listed items permission

to proceed with the subsequent work is hereby Granted/Refused to the Contractor.

Supervisor: Name ____________________ Contractor: Name ____________________

Sig. ____________________ Sig. ____________________

Date ____________________ Date ____________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

63

63

MINUTES

Subject : Inspection for Temporary(Provisional) Acceptance

Project and Location _________________________________________________

_________________________________________________

Client ______________________________________________________________

Consultant __________________________ Contractor ______________________

Mooting hold at ______________________ Time __________________________

Date of Inspection ____________________

Present were Represented from

1. ______________________________ _______________________________

2. ______________________________ _______________________________

3. ______________________________ _______________________________

4. ______________________________ _______________________________

5. ______________________________ _______________________________

6. ______________________________ _______________________________

7. ______________________________ _______________________________

8. ______________________________ _______________________________

In order to determine the satisfactory completion of the ______________________,

the above representatives proceeded with the Inspection and made the following

observations.

I ______________________________________

Outline of remarks and/or changes noticed.

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

64

64

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

_____________________________________________________________________

We the above representatives hereby our respective signatures witness that:

1. The Construction of this ___________________________________________

in accordance with plans & specifications.

2. Outlines of remarks given above is based on our observations and is to be

notified as per plan and specification.

3. Promotion of the provisional acceptance is affected as of

______________________________________________________________.

C.C.

__________________________

__________________________

__________________________

__________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

65

65

MINISTRY OF WORKS AND URBAN DEVELOPMENT

TEMPORARY(PROVISIONAL) ACCEPTANCE

Project : _______________________________________________

Location : _______________________________________________

Employer : _______________________________________________

Contractor : _______________________________________________

Contract : No. Date Amount Eth. B Basis

A. Main Contract ________ ________ _________ _________

B. Suppl. Agreement ________ ________ _________ _________

C. Variation Order No. 1 ________ ________ _________ _________

D. " " " 2 ________ ________ _________ _________

E. " " " 3 ________ ________ _________ _________

F. " " " 4 ________ ________ _________ _________

This _____________ day of __________ 19 ____ by the order of our respect

Department and after due notification to all concerned parties, we the undersigned:

1. __________________________ Representing the _________________________

2. __________________________ " " _________________________

3. __________________________ " " _________________________

4. __________________________ " " _________________________

5. __________________________ " " _________________________

6. __________________________ " " _________________________

7. __________________________ " " _________________________

Have examined:

a) Contracts, Drawings and Specifications:

b) _________________________________________________________________

c) _________________________________________________________________

and have proceeded with the ascertainment of the completion and Temporary

Acceptance of the above project on the bases of the following information:

A. Date when the contractor took possession of site ___________________________

B. Agreed length of completion time ______________ Calendar days (working days)

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

66

66

C. Commencing date ___________________________________________________

D. Completion date according to contract : _________________________________

E. Actual completion Date : ______________________________________________

F. Total Number of delay ________________________________________________

G. Number of justified days of delay _______________________________________

H. Number of Unjustified days of delay _____________________________________

I. Penalty of ________day Eth. Birr ______________ per day Eth. Birr ___________

A C C O U N T

Total value of work executed and/or

material supplied _______________________________

D E D U C T I O N S

1. Previous payments _____________________________

2. Penality ______________________________________

3. Rebate _______________________________________

4. _____________________________________________

Total deductions ____________________________

Total amount due to the contractor ______________

Retention money __________% of the total value of

work expected payable on the final acceptance

__________________________________________

Net Sum Payable to the Contractor ______________

Performance Bond: ________________________________

REMARKS: _________________________________________________________

_________________________________________________________

_________________________________________________________

_________________________________________________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

67

67

Conclusion:

The date for final acceptance will be _______________________________________

After thorough investigation of the works in all its parts excepting invisible latent

defects, we declare that it was executed in accordance with the Drawings and the

Specifications in an acceptable manner.

We witness thereof, we have written and signed this temporary acceptance of which one

copy is to be issued to the contractor for all practical purposes after due approval.

__________________________ _____________________

Construction Supervisor Contractor

ATTENDING PARTIES

1. ____________________ 2. ________________ 3. _________________

4. ____________________ 5. ________________ 6. _________________

Date ______________________

MINISTRY OF WORKS AND URBAN DEVELOPMENT

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

68

68

FINAL ACCEPTANCE

Project : _______________________________________________

Location : _______________________________________________

Employer : _______________________________________________

Contractor : _______________________________________________

Contracts No. Date Amount (Birr) Basis

A. Main Contract ________ ________ _________ _________

B. Supp. Agreement ________ ________ _________ _________

C. Variation Order No. 1 ________ ________ _________ _________

D. " " " 2 ________ ________ _________ _________

E. " " " 3 ________ ________ _________ _________

F. " " " 4 ________ ________ _________ _________

This _____________ day of __________ 19 ____ by verbal/written order No.

_____________ dated _____________ 19 ____ from ________________ we the

undersigned:

1. __________________________ Representing the _________________________

2. __________________________ " " _________________________

3. __________________________ " " _________________________

4. __________________________ " " _________________________

5. __________________________ " " _________________________

Have examined:

a) Contracts, Specifications and Drawings;

b) The Final Certificate of Measurement and the Report of the Temporary Acceptance;

c) _________________________________________________________________

d) _________________________________________________________________

and have proceeded with the ascertainment of good execution and final acceptance of

the project, on the bases of the following facts:

a. Date of Temporary Acceptance ______________________

b. Date of Final Acceptance___________________________

c. Remarks made during the provisional Acceptance of the works:

1. __________________________________________________________________

2. __________________________________________________________________

3. __________________________________________________________________

FINAL EXAMINATION OF THE WORKS:

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

69

69

A. Signes of visible defects: The general examination of the works as well as random

checks and test made of the different parts of the project have shown:

__________________________________________________________________

__________________________________________________________________

__

B. New facts: Since the provisional Acceptance of the works, the following facts have

occured:

1. ___________________________________________________________________

2. ___________________________________________________________________

3. ___________________________________________________________________

4. ___________________________________________________________________

C. New Orders: New orders have been given by us to the Contractor

on __________ 19___ in view of making good any eventual defects, in the works,

specially with regard to the following parts:

1. __________________________________________________________________

2. __________________________________________________________________

3. __________________________________________________________________

4. __________________________________________________________________

D. General remarks: The comparison of the Report of the provisional Acceptance of

the works with the present condition of the entire project, the contract and other

justificative document has brought up the following remarks:

1. ___________________________________________________________________

2. ___________________________________________________________________

3. ___________________________________________________________________

4. ___________________________________________________________________

A C C O U N T :

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

70

70

A. Total Value of the work executed and Eth. Birr

material supplied ________________________

B. D E D U C T I O N S

1. Payments made until Temporary

Acceptance ____________________

2. Payments made after Temporary

Acceptance ____________________

3. Various Deductions:

a.________________________

b. _______________________

Total deduction sum due to the contractor. ______________________________

C O N C L U S I O N

Therefore, we do hereby declare that the work has been executed in the principle of

good workmanship, and have accepted the project definitely on behalf of

________________________________________________________________

____________________ ____________________ __________________

O w n e r Construction Supervisor Contractor

Date _______________ ______

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

71

71

ACT OF RENOUNCMENT

I, we the undersigned ___________________________________________________

contractor, holder of the construction agreement of ___________________________

hereby declare that the sum of Eth. ________________________________________

____________________________________________________________________

represents the final balance of all accounts related to the above mentioned works, and

that after payment of this sum to us, we renounce formally and for ever to the benefit

resulting from any action we might have brought against the ___________________

in connection with the agreement in cause.

Any action or claim or reservation that we may take in the future shall be deemed as

legally covered by the present Act of Renouncement.

Done at ______________________ on ____________________

_____________________

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

72

72

APPENDIX 1

GUIDELINE ON CONTROL OF CONSTRUCTION PROJECTS

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

73

73

APPENDIX 1 : GUIDELINE ON CONTROL OF CONSTRUCTION PROJECTS

1. Pre-mobilization Stage

1.1 Pursuant to the signing of the Agreement, the Consultant shall ensure

that the Contractor submits the following programs in 3 copies:

a. Project's works schedule

b. Material Delivery Schedule

c. On-site availability program for major Equipment

d. Project Cash-flow (inclusive of proposed utilization of advance

fund from the Contract, (if any is involved)

e. Proposed Project's Organization Chart (inclusive of description

of qualifications or supervisory and administrative staff)

1.2 The Employer, consultant and Contractor shall jointly discuss and amend

the programs submitted if necessary. The program as amended by all

three shall be signed by all three.

1.3 Copies of the adjusted program shall be retained by the Employer,

Supervisor and Contractor.

2. Post Mobilization Stage

2.1 The Consultant shall require to submit Quarterly Work Schedules for

following quarters in appreciation of progresses attained during proceeding

quarters. These quarterly Work Programs need to be accompanied by

related delivery schedules for materials and major equipment.

2.2 The Employer, consultant and contractor shall discuss the quarterly

schedules submitted and sign them subsequent to making necessary

adjustments to them.

2.3 Copies of adjusted schedule shall be retained by the Employer,

Supervisor and contractor.

3. Site Control

3.1 The consultant shall ensure to be present on site to check and approve

that the contractor's performance is generally in accordance to the

conditions of contract and will require to make such visits to site as the

consultant shall consider necessary to satisfy himself that the works are

executed generally according to the contract and otherwise in accordance

with good engineering practice. The consultant's site inspection and

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

74

74

approval shall be particularly required in respect of (but limited to) the

following construction stages:

a. Clearing off site

b. Levelling and layout of foundation works

c. Checking of foundation depth

d. Material quality of :

- sand

- aggregates

- water

- concrete block, bricks, stone

- limes

- steel, etc.

e. Concrete works:

- mixes

- form works

- reinforcement bars

f. Masonry work at:

- foundation level

- above ground level

- elevation walls

g. Roofing works:

- fabrication and erection of steel

and wooden trusses

h. Finishing works

i. Submitting progress reports to the investor at least once in a

month.

j. Giving all necessary instructions to the contractor provided that

the consultant shall not without the prior approval of the investor

give any instructions which in the opinion of the consultant are

likely to increase substantially (more than 10%) the cost of the

works unless it is not in the circumstances practicable for the

consultant to obtain such prior approval.

k. Issuing certificates for payment to the contractor.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

75

75

l. Checking of payment certificates.

m. Performing any services which the consultant may be required

to carry cut under any contract for the execution of the works,

including where appropriate the supervision of any specified

tests and of the commissioning of the works, provided that the

consultant may decline to perform any services specified in a

contract the terms of which have not initially been approved by the

consultant.

n. Delivering to the investor on the completion of the works such

records and manufacturer's manuals as are reasonably necessary

to enable to the investor to operate and maintain the works.

o. Deciding any dispute or difference arising between the Employer

and the contractor and submitted to the consultant for his decision,

provided that this service shall not extend to advising the investor

following the taking of any step in or towards any arbitration or

litigation in connection with the works.

4. Quarterly Progress Evaluation Meetings

4.1 A joint evaluation meeting is to be conducted quarterly in the presence

of the following:

a. Employer's representative

b. Consultant's representative

c. Contractor

d. Project site supervisor (if any)

4.2 Official minutes of such meetings shall be recorded, signed and

distributed to each participant. Subsequent findings shall be reported back

at the next quarterly meeting.

4.3 When deemed necessary evaluation meetings can be called for on

monthly or bi-monthly bases.

5. Provisional Acceptance

The consultant shall conduct inspection and reporting of provisional acceptance of

the project.

6. Final Acceptance

The consultant shall conduct inspection and reporting of final acceptance of

project.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

76

76

APPENDIX 2

LIST OF MAJOR DUTIES AND RESPONSIBILITIES

OF A RESIDENT ENGINEER (SUPERVISOR)

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

77

77

APPENDIX 2 : LIST OF MAJOR DUTIES AND RESPONSIBILITIES OF A RESIDENT ENGINEER (SUPERVISOR)

1. Maintains, for the duration of contract period, singed copies of contract

agreement, technical specifications, bill of quantities, drawings and other referenced

standards.

2. Familiarizes himself with and understands fully the details in the

contract documents which include the technical specifications, the general provisions,

the special provisions, and any other referenced standards.

3. Reviews the plans and specifications and other pertinent documents that

would be furnished to him for accuracy and completeness.

4. Evaluates and approves project’s work schedule, material delivery

schedule, on-site availability program for major equipment, project cash-flow and

proposed project’s organization chart prepared by the contractor to ensure that it is

practical and provides for effective and efficient utilization of resources.

5. Inspects and approves work methods and quality of all materials used in

the work for conformity with the contract specifications.

6. Reviews regularly construction progress schedule to ensure that

reasonable close conformity of pre-determined work schedule, plans and specifications

are attained and alerting the contractor of possible delays and consequences.

7. Verifies all measurements and quantity computations.

8. Arranges periodic and regular site meetings with the designer of the

project, the contractor and the project owner.

9. Consulting with the designer, schedules for testing of materials and

submits to him detail field observations on material characteristics with indications on

tests required.

10. Considers and evaluates suggestions and recommendations which may

be submitted by the contractor or the project owner and reports them with

recommendations to the designer.

11. Advises the project owner on the need for special inspection or testing

other than those referred to in the contract documents.

12. Keeps a site book and records in it, for the duration of the project such as

the following and any other matter relevant to the works:

12.1 Sequence of operations and their accomplishment dates;

12.2 Conditions and qualities of construction works;

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

78

78

12.3 Variations made on the work and subsequent changes in cost;

12.4 Register of Minutes of Meetings;

12.5 Names of the responsible technical staff for the construction of

the projects;

12.6 Change in the technical staff;

12.7 Incidences affecting the progress of the construction works;

12.8 Performance errors or faulty workmanship by the contractor or

errors in the design and the solution to rectify the same;

12.9 The results of inspections performed by designers and project

owner as the case may be;

12.10 The date of receipt on site by the contractor of any part of designs

or modifications and the persons who delivered them;

12.11 Materials received that do not comply with the contract

specifications;

12.12 Delays in operations and their causes;

12.13 Site instructions given to the contractor;

12.14 Comments and clarifications in all matters affecting the execution

of the works;

12.15 And all other matters related to the construction works that have

caused delays and extra expenses or that have helped for the efficient operations;

12.16 The designer also records in the site book any observations be

made and clarifications he gave on the construction works;

12.17 All recordings shall be in Amharic or English and shall be dated

and signed.

13. Keeps a dairy or logbook recording daily activities, occurrences, etc. in

accordance with the appropriate forms.

14. Submits construction monthly, quarterly and annual progress reports to

the project owner.

15. Rejects any work or materials that fail to conform to the contract

specifications after the same are thoroughly assessed, and informing the designer of

such an action in advance.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

79

79

16. Suspends that portion of work where in his opinion there is an imminent

danger to the safety of the workers, provided, however, such suspension shall obtain the

approval of the designer or the consultant.

17. Examines any proposal submitted by the contractor and advises the

project owner and the consultant regarding the same.

18. Conducts inspection and prepares certificates of completion.

19. Conducts inspection and prepares certificates of final acceptance of the

project.

20. Accepts works executed and materials delivered on site in conformity

with the contract drawings, provisions and technical specifications.

21. Performs all other duties that may be delegated to him in writing by the

consultant.

22. Performs his duties with a professional standards of conduct, ethical

behaviour, integrity and honesty.

Check List for use by Building Construction Supervisors

Ministry of Works and Urban Development

80