document.xls/Civil Page 1 of 2 QA/QC CHECK LIST FOR CIVIL/STRUCTURE DRAWINGS Project No.: 6271 ERF No.: Description : Document Detail : Initial Document Sta IFA Dated: Sign Description 100% 100% 1 Latest soft file taken from Documentum & locked. 2 For IFA, revision no. is alpha-numeric. 3 New revision cloud and triangle shown. 4 For IFA, Approved By is kept blank. 5 All previous clouds shall be hide using a different layer. 6 7 8 North mark has been checked as per equipment plot plan 9 10 Ensure that Portable Foundation is being used as per requirement 11 12 14 15 16 Anchor bolt size has been selected as per required standard. 17 Details of bearing plate for pipe support foundations have been marked. 19 20 Structural connection details have been marked properly. 21 Drawing text has been properly checked for spelling. 22 Drawing panel has been checked for correct information. ADDITIONAL CHECK LIST FOR AS-BUILT CIVIL/STRUCTURE DRAWINGS 23 24 25 ORIGINATOR (Draftsperson) CHECKER (Engineer) Sr. No. If existing drawing is modified, new modifications are shown in thick layer and exisitng system is shown dim layer. Civil Foundation Layout has been checked as per equipment plot plan or piping plans and coordinates have been marked properly. Civil foundation details & general notes have been checked and bar-bending schedule has been marked on drawing. Civil Foundation location plans and elevations have been checked as per piping plans. In case of pipe supports, the elevations, type of pipe supports have been checked, marked and tabulated as per piping plans. Structural Steel sections and staircase / ladder / platform details have been correctly marked on drawing. In case of anchor bolts, the anchor bolts layout has been checked with skid dimensional drawing, civil foundation layout, equipment plot plan and piping plan. In case of road details, layout, elevation and culverts if any, have been checked as per the requirements and site conditions. Civil foundation layout has been checked as per site information; as-built equipment plot plan and piping plans and coordinates have been marked properly as per site measurements. Civil foundation elevations have been checked as per as-built piping plans and site information In case of pipe supports, the elevations, type and coordinates of pipe supports have been checked, marked and tabulated as per site information.

Upload: saadashfaq

Post on 05-Jan-2016

7 views

Category:

Documents


0 download

DESCRIPTION

okaf

TRANSCRIPT

Page 1: Check List - IfA

document.xls/Civil Page 1 of 1

QA/QC CHECK LIST FOR CIVIL/STRUCTURE DRAWINGS

L.E

. /

E.M Project No.: 6271 ERF No.:

Description :

Document Detail : Initial

Document Status : IFA Dated: Sign

Description 100% 100% SPOT

1 Latest soft file taken from Documentum & locked.

2 For IFA, revision no. is alpha-numeric.

3 New revision cloud and triangle shown.

4 For IFA, Approved By is kept blank.

5 All previous clouds shall be hide using a different layer.

6

7

8 North mark has been checked as per equipment plot plan

9

10 Ensure that Portable Foundation is being used as per requirement

11 Civil Foundation location plans and elevations have been checked as per piping plans.

12

14

15

16 Anchor bolt size has been selected as per required standard.

17 Details of bearing plate for pipe support foundations have been marked.

19

20 Structural connection details have been marked properly.

21 Drawing text has been properly checked for spelling.

22 Drawing panel has been checked for correct information.

ADDITIONAL CHECK LIST FOR AS-BUILT CIVIL/STRUCTURE DRAWINGS

23

24 Civil foundation elevations have been checked as per as-built piping plans and site information

25

OR

IGIN

AT

OR

(Draftsperson)

CH

EC

KE

R

(Engineer)

Sr. No.

If existing drawing is modified, new modifications are shown in thick layer and exisitng system is shown dim layer.

Civil Foundation Layout has been checked as per equipment plot plan or piping plans and coordinates have been marked properly.

Civil foundation details & general notes have been checked and bar-bending schedule has been marked on drawing.

In case of pipe supports, the elevations, type of pipe supports have been checked, marked and tabulated as per piping plans.

Structural Steel sections and staircase / ladder / platform details have been correctly marked on drawing.

In case of anchor bolts, the anchor bolts layout has been checked with skid dimensional drawing, civil foundation layout, equipment plot plan and piping plan.

In case of road details, layout, elevation and culverts if any, have been checked as per the requirements and site conditions.

Civil foundation layout has been checked as per site information; as-built equipment plot plan and piping plans and coordinates have been marked properly as per site measurements.

In case of pipe supports, the elevations, type and coordinates of pipe supports have been checked, marked and tabulated as per site information.